Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (9) Apply Infrastructure filter
  • Utilities (5) Apply Utilities filter
  • Land use (3) Apply Land use filter
  • Oil and gas (2) Apply Oil and gas filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Copper (1) Apply Copper filter
  • Lithium (1) Apply Lithium filter
  • Mineral sands (1) Apply Mineral sands filter
  • Nickel (1) Apply Nickel filter

Filter by current status:

  • Decision on whether to assess has been published (8) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (6) Apply Ministerial Statement published filter
  • Assessment on Proponent Information – Request for More Information published (3) Apply Assessment on Proponent Information – Request for More Information published filter
  • Environmental Scoping Document approved (2) Apply Environmental Scoping Document approved filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter
  • Report and recommendations in preparation (1) Apply Report and recommendations in preparation filter

Filter by relevant environmental factors:

  • (-) Remove Inland Waters filter Inland Waters
  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (22) Apply Flora and Vegetation filter
  • Social Surroundings (16) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • 37 (5) Apply 37 filter
  • 3144 (3) Apply 3144 filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Landforms (2) Apply Landforms filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Public Transport Authority of Western Australia (3) Apply Public Transport Authority of Western Australia filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Aigle Royal (1) Apply Aigle Royal filter
  • Brikmakers (BGC Australia Pty Ltd) (1) Apply Brikmakers (BGC Australia Pty Ltd) filter
  • Chalice Mining Limited (1) Apply Chalice Mining Limited filter
  • City of Gosnells (1) Apply City of Gosnells filter
  • Commissioner of Main Roads (1) Apply Commissioner of Main Roads filter
  • Commissioner of Main Roads Western Australia (Main Roads) (1) Apply Commissioner of Main Roads Western Australia (Main Roads) filter
  • Covalent Lithium Pty (1) Apply Covalent Lithium Pty filter
  • DBNGP (WA) Nominees Pty Ltd (1) Apply DBNGP (WA) Nominees Pty Ltd filter
  • Director General of the Department of Transport on behalf of the State of Western Australia (1) Apply Director General of the Department of Transport on behalf of the State of Western Australia filter
  • Electricity Networks Corporation trading as Western Power (1) Apply Electricity Networks Corporation trading as Western Power filter
  • Forest Products Commission of Western Australia (1) Apply Forest Products Commission of Western Australia filter
  • GrainCorp Liquid Terminals Australia Pty Ltd (1) Apply GrainCorp Liquid Terminals Australia Pty Ltd filter
  • Hanson Construction Materials Pty Ltd (1) Apply Hanson Construction Materials Pty Ltd filter
  • Harvey Water (1) Apply Harvey Water filter
  • Ivan Yujnovich (1) Apply Ivan Yujnovich filter
  • Keysbrook Leucoxene Pty Ltd (1) Apply Keysbrook Leucoxene Pty Ltd filter
  • Woodside Energy Technologies Pty Ltd (1) Apply Woodside Energy Technologies Pty Ltd filter

Filter by region:

  • (-) Remove Perth filter Perth

Filter by last updated:

  • 2025 (3) Apply 2025 filter
  • 2024 (8) Apply 2024 filter
  • 2023 (5) Apply 2023 filter
  • 2022 (4) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (1) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  1. Home
  2. Proposal search
  3. Terrestrial Fauna
  4. Perth
  5. Inland Waters

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Anketell Road Upgrade (Leath Road to Kwinana Freeway)

Last updated: May 8, 2025

Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...

Outer Harbour Port Development, Kwinana

Last updated: February 4, 2025

The Proposal is to construct and operate a new multimodal port in the Kwinana Industrial Area (KIA), approximately 30 km south of Perth. The Proposal includes: A port facility. Adjacent areas of landside development. An offshore breakwater. Dredging for a second main channel. Dredging for access channels, turning basins and berthing areas. Use of dredge material for beneficial re-use and, where required, placement in approved marine placement areas. Removal of the disused Kwinana Bulk Berth 1 (... Read more...

Subdivision of Lot 123 Mortimer Road Casuarina

Last updated: January 13, 2025

Lot 123 Mortimer Road Casuarina (Lot 123) is 45 hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lot of 7.9 hectares (ha) and a balance lot for residential development. Lot 123 contains excellent quality remnant Banksia woodland vegetation, threatened fauna habitat, and a conservation category wetland. Read more...

Urban Development of lots 11 and 74 Beenyup Road Banjup

Last updated: December 6, 2024

Aigle Royal propose to develop Lots 11 and 74 Beenyup Road, Banjup for residential development and conservation. The site adjoins Jandakot Regional Park. 10.25 hectares of the site is proposed for residential development and a wetland buffer. 23 hectares is proposed to be managed for conservation. Read more...

Gonneville Nickel-Copper-Platinum Group Element (PGE) Project

Last updated: November 12, 2024

Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...

Garden Street Extension, Southern River

Last updated: October 14, 2024

The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction). The Proposal is located predominantly within the suburb of Southern River, approximately 17 km south-east of Perth Central Business District (CBD) and intersects within Bush forever site 125 (Holmes Street Bushland). The construction and implementation of the... Read more...

Byford Rail Extension

Last updated: October 10, 2024

The Public Transport Authority (PTA) proposes to construct and operate 8 km of new railway (including dual tracks and associated rail infrastructure), between Armadale and Byford. The proposal includes modification to the existing Armadale Station and construction and operation of a new station at Byford. The proposal includes the replacement of level crossings with grade separated crossings, either road over rail or rail over road. The proposal involves clearing of up to 50 hectares (ha) of... Read more...

Tonkin Highway Grade Separated Interchanges (Hale Road and Welshpool Road)

Last updated: August 26, 2024

The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...

Northern Terminal to Neerabup Terminal 330kV Transmission Line

Last updated: July 22, 2024

The Northern Terminal (NT) to Neerabup Terminal (NBT) 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between NT in Malaga and NBT in Pinjar, a length of approximately 29 km. The purpose of the proposal is to reinforce the North Region transmission network to remove constraints on existing connected generation and provide... Read more...

Dampier to Bunbury Natural Gas Pipeline Southern Looping Project, Loop 10, South of Kwinana (S46) [2449]

Last updated: June 4, 2024

Changes to condition 9 in order to remove prescriptive rehabilitation criteria related to the rehabilitation of the proposal. Read more...

Earl Grey Lithium Project, Life of Mine Proposal

Last updated: February 2, 2024

The revised proposal is to develop a pegmatite-hosted lithium deposit at the abandoned Mt Holland Mine Site, in a Development Envelope of 3,996 ha. The Proposal involves new clearing of up to 1,885 ha of native vegetation, and use of existing cleared/disturbed land, infrastructure including a mine pit, waste rock landforms, tailings storage facility, processing plant, airstrip, accommodation village, water storage facilities, power generation infrastructure and associated infrastructure., The... Read more...

Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Last updated: December 15, 2023

The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...

Change of land use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations (Gnangara-Moore River State Forest, State Forest 65)

Last updated: December 12, 2023

The referred proposal is for a change in the use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations from commercial pine plantation managed for the purpose of timber production to a combination of new uses, purposes and conditions other than pine plantations. The change in the use, purpose and condition of land occurs through the progressive harvesting of pine without replacement and post-harvesting land management. The change in the use, purpose and... Read more...

Western Extension to the Keysbrook Mineral Sands Project

Last updated: November 6, 2023

Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. Read more...

H2Perth

Last updated: June 19, 2023

Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...

Thornlie-Cockburn Link (S46) [2333]

Last updated: February 28, 2023

Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...

Gidgegannup Granite Quarry (S46) [2342]

Last updated: May 30, 2022

The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...

Brine Pipeline and Outfall

Last updated: May 25, 2022

Harvey Water propose to construct and operate a pipeline and ocean outfall to dispose brine wastewater. The pipeline will be located between the Kemerton Strategic Industrial Area and the Indian Ocean south of Binningup in the Shire of Harvey. The pipeline will convey brine to a single outlet diffuser outfall. The outfall will be located approximately 400 m from the shoreline and will be installed under the seabed by horizontal directional drilling from the coast. The outlet pipe will protrude... Read more...

Tonkin Highway Grade Separated Interchanges Kelvin Road

Last updated: April 13, 2022

Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...

Malaga to Ellenbrook Rail Works

Last updated: March 14, 2022

The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.