Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (9) Apply Infrastructure filter
  • Iron Ore (7) Apply Iron Ore filter
  • Land use (4) Apply Land use filter
  • Oil and gas (3) Apply Oil and gas filter
  • Salt (3) Apply Salt filter
  • Mineral sands (2) Apply Mineral sands filter
  • Utilities (2) Apply Utilities filter
  • Bauxite (1) Apply Bauxite filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Industrial (1) Apply Industrial filter
  • Power generation (1) Apply Power generation filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (13) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (7) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (5) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - appeals closed (3) Apply EPA Report and Recommendations released - appeals closed filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Public Environmental Review document in preparation (1) Apply Public Environmental Review document in preparation filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (32) Apply Flora and Vegetation filter
  • Social Surroundings (26) Apply Social Surroundings filter
  • Inland Waters (20) Apply Inland Waters filter
  • Subterranean Fauna (10) Apply Subterranean Fauna filter
  • 37 (7) Apply 37 filter
  • Marine Fauna (7) Apply Marine Fauna filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • Benthic Communities and Habitats (6) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • 3144 (5) Apply 3144 filter
  • Inland Waters Environmental Quality (5) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • Landforms (4) Apply Landforms filter
  • Coastal Processes (2) Apply Coastal Processes filter

Filter by Proponent:

  • Main Roads WA (2) Apply Main Roads WA filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Alcoa of Australia Limited (1) Apply Alcoa of Australia Limited filter
  • Alkina Holdings Pty Ltd (1) Apply Alkina Holdings Pty Ltd filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • Beach Energy Limited (1) Apply Beach Energy Limited filter
  • BHP Iron Ore Pty Ltd (1) Apply BHP Iron Ore Pty Ltd filter
  • Chevron Australia Pty Ltd (1) Apply Chevron Australia Pty Ltd filter
  • Conservation and Parks Commission (1) Apply Conservation and Parks Commission filter
  • Forest Products Commission of Western Australia (1) Apply Forest Products Commission of Western Australia filter
  • Fortescue Metals Group Limited (1) Apply Fortescue Metals Group Limited filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • K + S Salt Australia Pty Ltd (1) Apply K + S Salt Australia Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Keysbrook Leucoxene Pty Ltd (1) Apply Keysbrook Leucoxene Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • Lost Sands Pty Ltd (1) Apply Lost Sands Pty Ltd filter
  • Main Roads (1) Apply Main Roads filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (1) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Public Transport Authority of Western Australia (1) Apply Public Transport Authority of Western Australia filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • The University of Western Australia (1) Apply The University of Western Australia filter
  • Woodside Energy Technologies Pty Ltd (1) Apply Woodside Energy Technologies Pty Ltd filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter
  • Z1Z Resorts Pty Ltd (1) Apply Z1Z Resorts Pty Ltd filter

Filter by region:

  • Pilbara (14) Apply Pilbara filter
  • Perth (9) Apply Perth filter
  • South West (4) Apply South West filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Mid West (2) Apply Mid West filter
  • Gascoyne (1) Apply Gascoyne filter
  • Peel (1) Apply Peel filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 2023 filter 2023
  1. Home
  2. Proposal search
  3. Terrestrial Fauna
  4. 2023

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Winu Project

Last updated: December 22, 2023

Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...

Mulga Downs Hub and Rail Spur

Last updated: December 22, 2023

The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...

Ningaloo Lighthouse Resort Project

Last updated: December 15, 2023

Z1Z Resorts Pty Ltd proposes to redevelop the Ningaloo Lighthouse Holiday Park, located along Yardie Creek Road, North West Cape. The Proposal comprises the construction of new visitor accommodation; the construction of associated ancillary facilities (i.e., staff accommodation, power supply infrastructure, water supply and treatment, wastewater treatment and reuse, and replacement service station (vehicle refuelling) etc.); refurbishment of the Vlamingh Head Lighthouse Quarters (a part of... Read more...

Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Last updated: December 15, 2023

The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...

Change of land use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations (Gnangara-Moore River State Forest, State Forest 65)

Last updated: December 12, 2023

The referred proposal is for a change in the use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations from commercial pine plantation managed for the purpose of timber production to a combination of new uses, purposes and conditions other than pine plantations. The change in the use, purpose and condition of land occurs through the progressive harvesting of pine without replacement and post-harvesting land management. The change in the use, purpose and... Read more...

Forest Management Plan 2024-2033

Last updated: November 30, 2023

The Forest Management Plan 2024-2033 (FMP 2024-2033) is a statutory plan for the management of approximately 2,522,000 hectares of land and waters vested in the Conservation and Parks Commission in the south-west of Western Australia, in accordance with the, Conservation and Land Management Act 1984, (CALM Act) to fulfil the statutory purposes for which that land is reserved. The proposal is to undertake a range of management activities, the most significant being conservation reserve creation... Read more...

Pinjarra Alumina Refinery Revised Proposal

Last updated: November 27, 2023

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Eliwana Iron Ore Mine

Last updated: November 6, 2023

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...

Western Extension to the Keysbrook Mineral Sands Project

Last updated: November 6, 2023

Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. Read more...

Optimised Mardie Project

Last updated: October 19, 2023

Mardie Minerals Pty Ltd has approval to develop a greenfields high quality salt and SoP project and associated export facility at Mardie, approximately 80 km south-west of Karratha, in the Pilbara region of WA. The project will produce a high purity salt product, Sulphate of Potash (SoP) and other products that can be derived from sea water. The Proposal includes the expansion of the approved Mardie Project (Ministerial Statement [MS] 1175) including expanded concentrator and crystalliser ponds... Read more...

Uaroo Renewable Energy Hub

Last updated: October 18, 2023

Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...

Karara Iron Ore Project – Mine Life Extension

Last updated: October 16, 2023

Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...

Sanjiv Ridge Project - Stage 2

Last updated: September 29, 2023

Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...

Newman Hub (Western Ridge) Derived Proposal

Last updated: September 8, 2023

BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...

Ashburton Salt Project

Last updated: September 4, 2023

K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...

Cyclone Mineral Sands Project (S46) [2319]

Last updated: July 5, 2023

Change to condition 3 to extend the time limit for proposal implementation Read more...

Manuwarra Red Dog Highway – Revised Proposal

Last updated: July 4, 2023

In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...

Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (S46) [2368]

Last updated: June 26, 2023

Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...

Great Northern Highway – Bindoon Bypass

Last updated: June 26, 2023

The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...

Thornlie-Cockburn Link

Last updated: June 22, 2023

The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.