Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (9) Apply Iron Ore filter
  • Infrastructure (3) Apply Infrastructure filter
  • Land use (2) Apply Land use filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Industrial (1) Apply Industrial filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • Decision on whether to assess has been published (5) Apply Decision on whether to assess has been published filter
  • Ministerial Statement published (5) Apply Ministerial Statement published filter
  • Environmental Scoping Document approved (3) Apply Environmental Scoping Document approved filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by relevant environmental factors:

  • (-) Remove Landforms filter Landforms
  • (-) Remove Subterranean Fauna filter Subterranean Fauna
  • Flora and Vegetation (15) Apply Flora and Vegetation filter
  • Terrestrial Fauna (15) Apply Terrestrial Fauna filter
  • Social Surroundings (13) Apply Social Surroundings filter
  • Inland Waters (12) Apply Inland Waters filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • 3144 (4) Apply 3144 filter
  • Coastal Processes (3) Apply Coastal Processes filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (2) Apply Benthic Communities and Habitats filter
  • Greenhouse Gas Emissions (2) Apply Greenhouse Gas Emissions filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • 37 (1) Apply 37 filter
  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter

Filter by Proponent:

  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (2) Apply Robe River Mining Co. Pty. Ltd filter
  • Robe River Mining Company Pty Ltd (2) Apply Robe River Mining Company Pty Ltd filter
  • 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd. (1) Apply 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd. filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • Crosslands Resources Ltd (1) Apply Crosslands Resources Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Public Transport Authority (1) Apply Public Transport Authority filter
  • Rhodes Ridge Management Services Pty Ltd (1) Apply Rhodes Ridge Management Services Pty Ltd filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Smiths 2014 Pty Ltd (1) Apply Smiths 2014 Pty Ltd filter
  • The Pilbara Infrastructure Pty Ltd (1) Apply The Pilbara Infrastructure Pty Ltd filter
  • WGEH Pty Ltd (1) Apply WGEH Pty Ltd filter

Filter by region:

  • Pilbara (9) Apply Pilbara filter
  • Mid West (2) Apply Mid West filter
  • Perth (2) Apply Perth filter
  • South West (2) Apply South West filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter

Filter by last updated:

  • 2025 (6) Apply 2025 filter
  • 2024 (2) Apply 2024 filter
  • 2023 (3) Apply 2023 filter
  • 2022 (1) Apply 2022 filter
  • 2019 (1) Apply 2019 filter
  • 2013 (2) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  1. Home
  2. Proposal search
  3. Landforms
  4. Subterranean Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Nyidinghu Iron Ore Mine

Last updated: May 5, 2025

Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...

Robe Valley Iron Ore Mine

Last updated: April 7, 2025

Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...

East Hamersley Railway Project

Last updated: March 27, 2025

The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...

Mindy South Iron Ore Mine

Last updated: March 7, 2025

Chichester Metals Pty Ltd is proposing to construct and operate an iron ore mine approximately 55 km north-west of Newman, and 30 km south of Fortescue’s existing Nyidinghu project in the Pilbara region. The proposal would require a disturbance footprint of 12,487 ha and is located within a 42,331 ha mine development envelope. The proposal is located within the Nyiyaparli and Nyiyaparli #3 Native Title determination area (WCD 2018/008) The proposal includes both above and below water table open... Read more...

Smiths Beach Project, Yallingup – Coastal Tourism Village

Last updated: February 11, 2025

Smiths 2014 Pty Ltd proposes to develop Lot 4131 Smiths Beach Road, Yallingup (City of Busselton) into a coastal tourism village, including: Hotel accommodation and wellness centre Campground 61 holiday homes Community hub and café Surf Lifesaving Club facilities and beach ramp The proposal is located at the southern end of Smiths Beach, adjacent to the Leeuwin Naturaliste National Park. The total proposed development envelope is 40.53 hectares (ha). The major elements of the proposal include:... Read more...

Gnarabup Tourism Development – Resort and Beach Village

Last updated: February 7, 2025

Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and commercial premises. The proposal development envelope is 8.11 hectares. The proposal is located on the western side of Wallcliffe Road, Gnarabup Beach. Following the seven day public comment period and consideration... Read more...

Western Green Energy Hub

Last updated: November 25, 2024

The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...

Rhodes Ridge Iron Ore Project

Last updated: November 4, 2024

The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...

Winu Project

Last updated: December 22, 2023

Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...

Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Last updated: December 15, 2023

The Public Transport Authority (PTA) proposes to construct and operate an extension of the existing Joondalup railway line from a point north of the proposed future Eglinton Station. The proposal will extend the Joondalup railway line through to Yanchep in the City of Wanneroo and includes a new intermodal transit station within the Yanchep City Centre area. The development envelope is up to 73 hectares (ha) and the proposal will result in potential impacts to native vegetation that includes... Read more...

Karara Iron Ore Project – Mine Life Extension

Last updated: October 16, 2023

Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...

Marillana Iron Ore Project, Shire of East Pilbara (S46) [2352]

Last updated: October 31, 2022

The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...

Mesa A Hub Revised Proposal

Last updated: August 21, 2019

Robe River Mining Co Pty Ltd is seeking to extend the existing Mesa A / Warramboo Iron Ore Mining Project by extending the existing mining operation and developing four new nearby deposits. The proposal is 43 kilometres west of Pannawonica in the Pilbara Region. The proposal would require an additional 3000 hectares of clearing of native vegetation, with some below water table mining. A water supply would also be required and discharge of any excess water to Warramboo Creek. Read more...

Mesa A / Warramboo Iron Ore Project

Last updated: March 27, 2013

The proposal is to mine iron ore at Mesa A / Warramboo in the Robe Valley, Pilbara. The proposal involves the development of mine pits at Mesa A and Warramboo; a primary sizer processing plant; associated mine infrastructure; and the construction of a rail line to link into existing Mesa J mining operations., Note:, Also see Mesa A / Warramboo Iron Ore Project (s43) Read more...

Mesa A / Warramboo Iron Ore Project (s43)

Last updated: March 27, 2013

Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...

Jack Hills Expansion Project

Last updated: January 9, 2012

The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.