This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 4, 2012
The proposal is to increase the throughput of iron ore to 85 million tonnes per annum at the Cape Lambert Port operations. Read more...Last updated: April 2, 2012
The proposal is to expand Fortescue Metals' current operations within the Pilbara region, Western Australia to include the development of a new iron ore project, known as the Io Project, which is located within the Nyidinghu Study Area. The Project is located on Marillana Station approximately 40 kilometres (km) south of Fortescue’s Cloudbreak operations and approximately 100 km north-west of Newman. The major components of the Project are: An iron ore mine and resource comprising Brockman... Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: March 28, 2012
The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum. Read more...Last updated: March 12, 2012
The proposal is for the mining of a 53-hectare area and processing of approximately 1.3 million tonnes of gypsum recovered from Mining Lease 70/1161 using the facilities currently employed for operations in the adjacent Mining Lease 70/750. The proposal involves dredging and will form a permanent hypersaline water body of approximately four metres maximum depth. Dredging operations are proposed to be undertaken every second year over a 2 to 4 week period to excavate approximately 100,000 tonnes... Read more...Last updated: February 28, 2012
The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...Last updated: January 17, 2012
The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: November 22, 2011
The proposal involves the construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Read more...Last updated: October 24, 2011
The proposal is to develop and operate an open pit nickel mine and associated infrastructure on Mining Lease 77/00583 and haulage road on Mining Lease 77/00545 within the Shire of Kondinin. Read more...Last updated: August 5, 2011
The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: June 30, 2011
The proposal is to expand existing wharf facilities to increase storage capacity and improve the efficiency of Dampier's port in general. The expansion involves the construction of a land-backed wharf, 300m jetty, lay down areas, access road and associated infrastructure. The wharf and lay down area would be constructed using reclaimed material from the dredging required to improve the approach and berthing channels. Read more...Last updated: May 30, 2011
The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...Last updated: April 21, 2011
The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. Read more...Last updated: March 14, 2011
Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...Last updated: March 14, 2011
The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...Last updated: March 11, 2011
The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...Last updated: March 10, 2011
The proposal is to develop a wellfield on the Blackwood Plateau near Jarrahwood and to supply the groundwater from the South West Yarragadee aquifers into the Integrated Water Supply Scheme (IWSS). The proposed wellfield would comprise five well sites with two wells at each site drawing from the Yarragadee Formation Unit 1 and Unit 3 aquifers, approximately 400m and 700m respectively from the surface (termed the eastern split wellfield), providing a maximum of 45 GL/yr into the IWSS through a... Read more...