Cape Lambert Port B development

Project
Proposal description

The proposal is to construct and operate a second port (Port B) at Cape Lambert to process and export up to 130 million tonnes of ore per annum.

Assessment Number
1717
Region
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Chair's Determination
Date published
3. Assessment
4. EPA Report on assessment
EPA Report Number
1357
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Note: A change to condition 8-1 of Ministerial Statement 840 was approved by the Minister for Environment on 31 October 2011 in Ministerial Statement 876.

Date of approval
Post-assessment changes
Notice of Interim Implementation Conditions under Section 46A
Date of approval (46a)
s. 45C amendments

Attachment 1 – Change to the Tug Harbour Extension dredging footprint area (i.e. updated Table 4 and Figures 2, 4b and 4c) – change to proposal approved under s45C on 12 May 2011.

Attachment 3 – Additional dredging – increase in “large dredge area” and “tug harbour dredge area” (replaced Figure 5, Table 4 and Key Characteristics Table – change to proposal approved under s45C on 22 December 2011.

Attachment 4 – Additional clearing – additional 46 ha of terrestrial clearing. Inclusion of figure 7 depicting Terrestrial Component of the Proposed Footprint – change to proposal approved under s45C on 28 March 2012.

Date of approval s. 45C