This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: January 24, 2025
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...Last updated: January 21, 2025
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: April 16, 2024
Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...Last updated: February 19, 2024
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...Last updated: September 4, 2023
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: July 31, 2023
The proposal will provide additional port facilities at Port Hedland to receive and stockpile the product from emerging miners, specifically the various mines owned by the proponent’s shareholders, and load this product onto ships for export. Each of the shareholders is exploring and developing new iron ore projects in the Pilbara, with one company actively mining ore and exporting through the existing facilities in the Port of Port Hedland. The current shareholders of the proponent are Atlas... Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: July 31, 2023
The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 regarding amending the conditions of Ministerial Statement 858 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: August 12, 2020
The proposal is for dredging of not more than 3,500,000 cubic metres off Anderson Point, for a third ship berth; disposal of dredge spoil on preexisting and previously approved land at Anderson Point; and extension of the approved open-pile wharf. Read more...Last updated: May 15, 2019
Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...Last updated: March 6, 2019
Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...Last updated: June 11, 2018
The proposal is for the construction and operation of a technical ammonium nitrate production facility (TANPF) on Site D within the King Bay/Hearson Cove Industrial Estate on the Burrup Peninsula. The proposal is located approximately 13 kilometres north-west of Karratha. Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...Last updated: August 31, 2016
Austeel Pty Ltd proposes to mine iron ore from the George Palmer Orebody on a pastoral lease about 25km south of Cape Preston. Ore will be fed to a purpose-built process plant to produce up to 13.8 million tonnes per annum of pellet iron and 4.7 million tonnes per annum of direct reduced iron (DRI) and/or hot briquetted iron (HBI). The products will be exported via a new port to be built at Cape Preston and Preston Island. Associated components comprise waste dumps, tailings storage facility,... Read more...Last updated: April 30, 2015
To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...Last updated: February 6, 2014
The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...Last updated: June 8, 1998
Proposal to develop a land-based marine shell breeding facility and residence on Downes Island approximately seven kilometres west of Port Hedland. Trochus shells (, Trochus niloticu, ), Pearl oysters (, Pteria penguin, ,, Pinctada margaritifera, ,, P. albina, ) and a range of other native Australian shells will be bred at the facility. Trochus and pearl oysters will be grown-out off-site. Read more...