This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 7, 2025
The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup... Read more...Last updated: August 4, 2025
The proposal is for the continuation and expansion of existing operations at the Newmont Boddington Mine which is located approximately 12km northwest of Boddington and 130km southeast of Perth. The proposal is a significant amendment to the existing proposal approved under Ministerial Statement 971 and comprises additional footprint for the safe construction and operation of the future tailings dam RDA2. The proposal also includes a range of other activities including but not limited to... Read more...Last updated: August 4, 2025
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: August 4, 2025
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...Last updated: July 30, 2025
Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...Last updated: July 22, 2025
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: July 21, 2025
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: July 7, 2025
Horizon Power proposes to construct and operate the Derby Future Energy System (FES) for energy supply to the town of Derby within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 21 megawatts (MW), battery energy storage systems (BESS) up to 10 MW, a new thermal power station up to 8 MW, and a transmission network connection route. The thermal power station will be installed adjacent to the existing power station on Broome... Read more...Last updated: June 30, 2025
De Grey Mining Ltd proposes to construct and operate the Hemi Gold Project (the Project) located approximately 85 km south of Port Hedland, in the Pilbara Region of WA. The Project involves the excavation of open pits, mine dewatering, surplus water management including reinjection and controlled discharge. Associated supporting infrastructure includes an integrated waste landform tailings storage facility, waste rock landforms, low-grade stockpiles, airstrip, accommodation village, sealed... Read more...Last updated: June 30, 2025
Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine. The proposal will include the establishment of an above groundwater mine pit, waste rock landform, infrastructure corridor and associated infrastructure. Quartzite would be trucked to Simcoa’s existing smelter in the Kemerton Strategic Industrial Area 17 km north-east of Bunbury. It is anticipated the... Read more...Last updated: June 30, 2025
The Department of Transport is proposing to build a new boating facility about 300 metres south of Tantabiddi Creek, located in the Ningaloo Marine Park, the Jurabi Coastal Park and the Ningaloo Coast National and World Heritage Areas, near Exmouth. The proposed new facility would replace the existing boat ramp at Tantabiddi Creek, and involves: dredging of the harbour basin and entrance channel land reclamation and vegetation clearing construction of breakwaters, revetments, boat ramps,... Read more...Last updated: June 26, 2025
Smiths 2014 Pty Ltd proposes to develop Lot 4131 Smiths Beach Road, Yallingup (City of Busselton) into a coastal tourism village, including: Hotel accommodation and wellness centre Campground 61 holiday homes Community hub, café, bakery and general store Cape to Cape welcome centre Surf Lifesaving Club facilities The proposal is located at the southern end of Smiths Beach, adjacent to the Leeuwin-Naturaliste National Park. The total proposed development envelope is 41.79 hectares (ha). The... Read more...Last updated: June 25, 2025
Robe River Mining Co. Pty Ltd. (the proponent) propose to develop new above and below water table iron ore mine pits and associated infrastructure to sustain existing West Angelas operations. The proposal is located approximately 130 kilometres northwest of Newman in the Pilbara region of Western Australia. The proposal will involve clearing of an additional 7,200 hectares (ha) of native vegetation (in addition to the 12,205 ha currently authorised under Ministerial Statement 1113) within a... Read more...Last updated: June 21, 2025
Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. Read more...Last updated: June 19, 2025
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: June 19, 2025
The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry berth. Small craft landing facility. Fuel storage and... Read more...Last updated: June 17, 2025
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...Last updated: June 13, 2025
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: June 9, 2025
The Marillana Creek (Yandi) Life of Mine Proposal is a significant amendment located approximately 90 kilometres (km) northwest of the town of Newman. BHP Iron Ore Pty Ltd proposes to extend existing iron ore mining operations approved under, Ministerial Statement 679, and as amended by, Ministerial Statement 1039, . The proposal includes the expansion of operations at the approved Marillana Creek (Yandi) operation to mine the entire Yandi orebody within Mining Lease 270SA. This will include... Read more...Last updated: June 6, 2025
The proposal is to construct and operate a wind farm and linear infrastructure to provide renewable energy to Fortescue mining operations within the Pilbara. The proposal comprises of wind turbines, 220 kV transmission lines, substations and switchyards, 33 kV reticulation lines, a borefield, roads, pipelines, corridors of overhead lines, battery energy storage, accommodation camps, wastewater treatment plant, optional airstrip and supporting infrastructure. The Proposal is located... Read more...