Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Sand, rock, gravel and clay (4) Apply Sand, rock, gravel and clay filter
  • Industrial (2) Apply Industrial filter
  • Iron Ore (2) Apply Iron Ore filter
  • Oil and gas (2) Apply Oil and gas filter
  • Utilities (2) Apply Utilities filter
  • Mineral sands (1) Apply Mineral sands filter
  • Rare earth elements (1) Apply Rare earth elements filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (8) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (2) Apply Decision on whether to assess has been published filter
  • Public Environmental Review period closed (2) Apply Public Environmental Review period closed filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter

Filter by relevant environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (11) Apply Flora and Vegetation filter
  • Terrestrial Fauna (10) Apply Terrestrial Fauna filter
  • 37 (6) Apply 37 filter
  • Inland Waters (5) Apply Inland Waters filter
  • Marine Environmental Quality (3) Apply Marine Environmental Quality filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • 3144 (2) Apply 3144 filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (2) Apply Inland Waters Environmental Quality filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Human Health (1) Apply Human Health filter
  • Landforms (1) Apply Landforms filter
  • Marine Fauna (1) Apply Marine Fauna filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter

Filter by Proponent:

  • Woodside Energy Ltd (2) Apply Woodside Energy Ltd filter
  • APA Northern Goldfields Interconnect Pty Ltd (1) Apply APA Northern Goldfields Interconnect Pty Ltd filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • Doyles Lime Services Pty Ltd (1) Apply Doyles Lime Services Pty Ltd filter
  • Hanson Construction Materials Pty Ltd (1) Apply Hanson Construction Materials Pty Ltd filter
  • Kwinana WTE Project Co Pty Ltd (1) Apply Kwinana WTE Project Co Pty Ltd filter
  • Lynas Kalgoorlie Pty Ltd (1) Apply Lynas Kalgoorlie Pty Ltd filter
  • McDougall Quarries Pty Ltd (1) Apply McDougall Quarries Pty Ltd filter
  • Phoenix Energy Australia Pty Ltd (1) Apply Phoenix Energy Australia Pty Ltd filter
  • Public Transport Authority (1) Apply Public Transport Authority filter
  • Questdale Holdings Pty Ltd (1) Apply Questdale Holdings Pty Ltd filter
  • Sheffield Resources (1) Apply Sheffield Resources filter
  • Wasterock Pty Ltd; Hazelland Pty Ltd (1) Apply Wasterock Pty Ltd; Hazelland Pty Ltd filter
  • Westralian Iron Pty Ltd (1) Apply Westralian Iron Pty Ltd filter
  • Yara Pilbara Fertilisers Pty Ltd (1) Apply Yara Pilbara Fertilisers Pty Ltd filter

Filter by region:

  • Perth (5) Apply Perth filter
  • Pilbara (4) Apply Pilbara filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Mid West (2) Apply Mid West filter
  • South West (2) Apply South West filter
  • Kimberley (1) Apply Kimberley filter
  • Peel (1) Apply Peel filter

Filter by last updated:

  • (-) Remove 2022 filter 2022
  1. Home
  2. Proposal search
  3. 2022
  4. Social Surroundings

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Remediation of Lot 20 Adelaide Street Hazelmere

Last updated: December 19, 2022

Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...

Thunderbird Mineral Sands Project

Last updated: November 8, 2022

Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...

Marillana Iron Ore Project, Shire of East Pilbara (S46) [2352]

Last updated: October 31, 2022

The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...

Lots 2 and 10 Rowley Road, Mandogalup

Last updated: September 6, 2022

Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...

Koolanooka Hills – Exploration Proposal

Last updated: August 11, 2022

Westralian Iron Pty Ltd (the Proponent) is proposing to undertake an exploration drilling program at the Koolanooka Hills, located in the Shire of Morawa, approximately 20 km east-south-east of the township of Morawa. The purpose of the Proposal is mineral exploration drilling for iron ore and would include the clearing of no more than 2.95 hectares of native vegetation within a 3.80 ha disturbance footprint. The proposal would involve earthworks to establish (25) drill pads and access tracks,... Read more...

Ammonia Plant, Murujuga (Burrup Peninsula), Renewable Hydrogen Project

Last updated: August 4, 2022

Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...

North West Shelf Project Extension

Last updated: July 21, 2022

Ongoing operation of the North West Shelf Project to enable the long-term processing of third party gas and fluids and North West Shelf Joint Venture field resources through the North West Shelf Project facilities until around 2070. Read more...

Scarborough Project Nearshore Component

Last updated: June 14, 2022

The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...

Northern Goldfields Interconnect Pipeline

Last updated: June 14, 2022

APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...

Gidgegannup Granite Quarry (S46) [2342]

Last updated: May 30, 2022

The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...

Limestone and Sand Quarry Lot 1002 Preston Beach

Last updated: April 5, 2022

Doyles Lime Service Pty Ltd proposes limestone and sand excavation approximately 4.5 km north of the Preston Beach townsite, Shire of Waroona. Read more...

Malaga to Ellenbrook Rail Works

Last updated: March 14, 2022

The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...

Lynas Kalgoorlie Rare Earths Processing Facility

Last updated: February 1, 2022

Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...

Kwinana Waste to Energy Project

Last updated: January 31, 2022

To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...

Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel

Last updated: January 31, 2022

APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.