This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 16, 2022
The Order of the Servants of Mary Incorporated proposes to develop Lot 9000 Wanneroo Road Sinagra for urban development. The urban development will include residential and commercial development, internal public road network, public open space, and drainage infrastructure. The development envelope for the proposal is 29.33 hectares, which includes 2.02 hectares conservation public open space. Read more...Last updated: October 31, 2022
The requested change relates to condition 3 of Statement 1055 for an extension to the time limit for proposal implementation. Read more...Last updated: August 29, 2022
TRECAP Pty Ltd proposes to amalgamate, clear and provide servicing of Lots 802, 804 and 4640 on Mandurah Road, East Rockingham to facilitate future industrial development, forming 4.0157 hectares (ha) in area. These lots are adjacent to the proponent’s Lot 850 (31.0840 ha) which is already used for industrial purposes. The site is within the Rockingham Industrial Zone strategic proposal area. The proponent has requested the EPA declare the proposal to be ‘derived proposal’; a proposal derived... Read more...Last updated: August 22, 2022
Synergy Renewable Energy Developments Pty Ltd proposes to develop a wind farm approximately 35 kilometres north-east of Hyden townsite in the Western Australian Wheatbelt. The proposal consists of up to 30 wind turbines generating up to 150 MW, electrical substations and switchyards. The turbines will be installed on towers up to 150 m tall with blades up to 90 m long for a total height of up to 240 m. All turbines are proposed to be located at least 100 m from remnant vegetation. The proposal... Read more...Last updated: August 1, 2022
Resource Group (WA) Pty Ltd proposes to construct and operate a hard rock quarry at the location of Grass Valley, 17 kilometres east of Northam WA. The project will process blasted rock from the quarry into smaller sized proportions suitable for use in concrete, roadworks and other civil works. The operation will produce no more than 70,000 tonnes of saleable product per annum. Products will be transported from the quarry by road using truck and semi-trailers, both locally and to various sites... Read more...Last updated: August 1, 2022
Australian Vanadium Limited (AVL) propose to construct and operate a vanadium processing facility in the Midwest region, approximately 80 km east of Geraldton and 27 km west of Mullewa on the Geraldton-Mount Magnet Road in the City of Greater Geraldton. The proposal will include a processing facility which includes a processing plant, evaporation ponds, support facilities, heavy and light vehicle access roads, water production bores, reverse osmosis plant and ancillary office. The processing... Read more...Last updated: July 15, 2022
The proposal is for above and below water table mining and beneficiation of vanadium ore to produce an enriched vanadium-iron concentrate. The proposal is located 40 km south-southeast of Meekatharra and includes the development of open mine pits and associated infrastructure including but not limited to access roads, accommodation camp, a crushing, milling, flotation, and magnetic separation (beneficiation) plant, waste rock and tailings storage, and support infrastructure. Read more...Last updated: July 11, 2022
The Proposal is located in the east Pilbara region of Western Australia within a development envelope of 718 ha and clearing no more than 270 ha. The Beatons Creek Gold Project is currently operating under relevant approvals and permits of the Environmental Protection Act (Part V) and Mining Act 1978 (Mining Act). The Fresh Rock Expansion proposes to mine deeper into the fresh rock resource including below the water table, enabling mining to continue at Beatons Creek. The proposal includes: •... Read more...Last updated: July 11, 2022
Strike South West Pty Ltd propose to construct and operate the Walyering Conventional Gas Development. The proposal will comprise two free-flowing conventional gas wells, a gathering system of flowlines, a production facility and a tie-in point to the third-party operated Parmelia Gas Pipeline. The proposal is located within an agricultural area approximately 6.5 kilometres (km) northwest of Cataby and 21 km west of Dandaragan (Shire of Dandaragan). The proposal would include a total... Read more...Last updated: July 11, 2022
AWE Perth Pty Ltd proposes to undertake a conventional exploration drilling program located south-east of Dongara, Western Australia (WA). The Proposal includes the construction of a single deviated well, immediately adjacent (extending beneath) the Yardanogo Nature Reserve, and within MEPAU’s Production Licence L1. The intent of the Proposal is to evaluate the gas-bearing potential of the Gynatrix prospect by measuring the properties of the Kingia Sandstone and High Cliff Sandstone formations... Read more...Last updated: July 11, 2022
Australian Garnet Pty Ltd is seeking to develop a greenfields mineral sands mine located 35 kilometres south of Kalbarri, in the Mid-West region of Western Australia, within the Shire of Northampton. The proposal would include the progressive development of above-groundwater mine pits, and associated processing facilities and infrastructure. The proposal would require the clearing of up 161 hectares of native vegetation and mined sections would be progressively backfilled and rehabilitated. The... Read more...Last updated: June 27, 2022
Marda Operations Pty Ltd propose to develop a gold mining project, approximately 140 kilometres north of the town of Southern Cross within the Shire of Yilgarn. The proposal will include mining below the groundwater table by conventional open cut methods and ore will be transported offsite for processing. The proposal also includes a waste rock landform, mine ore pad, topsoil and low grade stockpiles and supporting infrastructure. The proposal is adjacent to the proposed Die Hardy Range... Read more...Last updated: June 7, 2022
Alinta Energy Development Pty Ltd proposes to develop a 90 Mega Watts (MW) AC solar facility situated on Unallocated Crown Land near Alinta Energy’s existing Port Hedland Power Station located within the Boodarie Strategic Industrial Area. The proposal is located approximately 5 km south-west of South Hedland, adjacent to Great Northern Highway, within the Town of Port Hedland. The proposal consists of a 90 MW AC solar farm and a short (~2 km) transmission connection to the existing Port... Read more...Last updated: June 7, 2022
DevelopmentWA proposes to subdivide Lot 40 (No. 217) Devlin Road, Wellesley (Shire of Harvey) into approximately 34 lots to facilitate future industrial development. Areas of the Marriott Road reserve (Lots 41 & 42) are also proposed to be cleared to facilitate the safe movement of vehicles to and from the site and for upgrading of electrical services. The proposal would include a total development envelope of 119 hectares, including proposed clearing of up to 27.1 hectares of native... Read more...Last updated: May 30, 2022
The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...Last updated: May 30, 2022
The Bellevue Gold Project is a historic gold mining operation located approximately 40 kilometres north of Leinster in the Northern Goldfields region. The proposal is for the recommencement of operations at the Bellevue Gold Project and involves extensions to existing mines and excavation of new open pits, associated mine dewatering, onsite processing and waste disposal. The proposal requires a disturbance of 363.2 hectares (ha) within a development envelope of 1,030 ha. The proposed life of... Read more...Last updated: April 13, 2022
Main Roads proposes to upgrade and widen a 2 km section of Tonkin Highway from four lanes to six lanes from approximately 1 km north of Kelvin Road extending south to Maddington Road. The Proposal will include construction of a grade separated interchange at Tonkin Highway and Kelvin Road and associated works such as PSP upgrade, installation of noise and retaining walls, drainage improvements and landscaping. Read more...Last updated: April 11, 2022
Change existing Condition 7 of Ministerial Statement 586 so that it is adequate with respect to avoiding, reducing, and offsetting greenhouse gas emissions. Read more...Last updated: March 28, 2022
The City of Fremantle and Fremantle Ports propose to undertake up to 150,000 cubic metres of maintenance and capital dredging from a portion of Fremantle Ports deep water entrance channel and nourish Port Beach with the dredged material. The proposal footprint is 60.27 hectares, located 1.6 kilometres from the Cottesloe Reef Fish Habitat Protection Area. The proposal could impact on the environmental factors of benthic communities and habitats, marine environmental quality, coastal processes... Read more...Last updated: March 21, 2022
The City of Stirling proposes to redevelop its existing Recycling Centre Balcatta to establish an update Community Recycling Centre (CRC) and Waste Transfer Station (WTS) Facility located at 238 Balcatta Road, Balcatta, Western Australia. The site is located within an industrial and business area and under the City’s Local Planning Scheme No. 3 has been designated as a ‘Special Control Area’ zoned as ‘Industry’. The CRC will encourage the reuse and recovery of materials and diversion of waste... Read more...