Strike South West Pty Ltd propose to construct and operate the Walyering Conventional Gas Development. The proposal will comprise two free-flowing conventional gas wells, a gathering system of flowlines, a production facility and a tie-in point to the third-party operated Parmelia Gas Pipeline.
The proposal is located within an agricultural area approximately 6.5 kilometres (km) northwest of Cataby and 21 km west of Dandaragan (Shire of Dandaragan).
The proposal would include a total disturbance area of 15.31 hectares (ha) within a development envelope of 91.41 ha. No clearing of native vegetation is required. The maximum life of the project is 10 year