EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > The Walyering Conventional Gas Development

The Walyering Conventional Gas Development

Project
Proponent: 
Strike South West Pty Ltd
Proposal description: 

Strike South West Pty Ltd propose to construct and operate the Walyering Conventional Gas Development. The proposal will comprise two free-flowing conventional gas wells, a gathering system of flowlines, a production facility and a tie-in point to the third-party operated Parmelia Gas Pipeline.  

The proposal is located within an agricultural area approximately 6.5 kilometres (km) northwest of Cataby and 21 km west of Dandaragan (Shire of Dandaragan). 

The proposal would include a total disturbance area of 15.31 hectares (ha) within a development envelope of 91.41 ha. No clearing of native vegetation is required. The maximum life of the project is 10 year

Region: 
Wheatbelt
Referred under EP Act: 
s38
Industry sector: 
Oil and gas
Last updated: 
July 11, 2022
Current Status: 
Decision on whether to assess has been published
Decision on whether to assess has been published
1. Referral
Comment on this referral: 
The Walyering Conventional Gas Development
Comment period: 
Monday, 30 May, 2022 to Sunday, 5 June, 2022
Referral documentation: 
PDF icon Referral Form
PDF icon Proposal Content Document
PDF icon s38 Referral Document Rev 2 - The Walyering Conventional Gas Development - Strike South West Pty Ltd.PDF
2. Decision on whether to assess this proposal
Chair's Determination: 
Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. No advice given (Appealable)
Extract of determination: 
PDF icon The Walyering Conventional Gas Development
Date published: 
Monday, 11 July, 2022

Source URL:https://www.epa.wa.gov.au/proposals/walyering-conventional-gas-development