This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: October 14, 2024
The Proposal occurs approximately 20 kilometres north of Karratha within an existing industrial area designated as a service corridor within the Burrup Strategic Industrial Area of the Burrup Peninsula. The Project involves the construction of a 550 meter pipeline and associated supporting infrastructure to transport a maximum of 150 TJ of natural gas per day from the Dampier to Bunbury Natural Gas Pipeline to the proposed Perdaman Urea Plant development. The key components of the Proposal... Read more...Last updated: June 4, 2024
Changes to condition 9 in order to remove prescriptive rehabilitation criteria related to the rehabilitation of the proposal. Read more...Last updated: April 29, 2024
Energy Resources Ltd proposes a conventional gas project, to construct and operate a gas processing plant and pipeline in the Mid-West region of Western Australia, approximately 350 km north of Perth, 25 km east of Dongara and 15 km west of Mingenew. The proposal comprises the construction and operation of a natural gas processing facility with a nominal production capacity of 250 terajoules per day, up to six (6) natural gas production wellheads, and an infield gathering system and... Read more...Last updated: November 13, 2023
Strike South Pty Ltd proposes to construct and operate the South Erregulla Conventional Gas Development, located approximately 280 km north of Perth and 45 km southeast of Dongara in the Shire of Three Springs and the Shire of Irwin. The proposal comprises a natural gas processing facility, gas gathering network and pipeline to connect to the Dampier to Bunbury Natural Gas Pipeline. The development envelope is 283.46 ha with a disturbance footprint of 111.82 ha. No native vegetation clearing is... Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: February 23, 2023
Buru Energy Ltd propose to undertake a 2D an d 3D geological survey at one site (Rafael patch) in the west Kimberley district, approximately 80 kilometres south of Derby. The proposal would include total disturbance of up to 438 hectares by raised blade clearing of 1147 km of seismic lines and construction of a temporary workers camp within an existing cleared well site. Read more...Last updated: July 11, 2022
Strike South West Pty Ltd propose to construct and operate the Walyering Conventional Gas Development. The proposal will comprise two free-flowing conventional gas wells, a gathering system of flowlines, a production facility and a tie-in point to the third-party operated Parmelia Gas Pipeline. The proposal is located within an agricultural area approximately 6.5 kilometres (km) northwest of Cataby and 21 km west of Dandaragan (Shire of Dandaragan). The proposal would include a total... Read more...Last updated: July 11, 2022
AWE Perth Pty Ltd proposes to undertake a conventional exploration drilling program located south-east of Dongara, Western Australia (WA). The Proposal includes the construction of a single deviated well, immediately adjacent (extending beneath) the Yardanogo Nature Reserve, and within MEPAU’s Production Licence L1. The intent of the Proposal is to evaluate the gas-bearing potential of the Gynatrix prospect by measuring the properties of the Kingia Sandstone and High Cliff Sandstone formations... Read more...Last updated: May 22, 2017
In response to matters raised in the 7-day public comments on the referral, the proponent provided the following clarifying information: 1. Proponent consultation with the Shire of Irwin; 2. Rehabilitation Monitoring Report for the Redhill South 01 well site; 3. Proponent response to 7-day public comments. Read more...Last updated: December 7, 2016
Warrego Energy Pty Ltd proposes to develop the West Erregulla-2 Exploration Well located approximately 50 kilometres south - east of Dongara. The proposal is a proof of concept (single well). The exploration targets are at depths of 2,000 metres (m) to 5,000m and include geological structures that may yield natural gas. This includes the Dongara tight sandstone which is found below 3,900m and is expected to require hydraulic fracturing. Read more...Last updated: February 16, 2015
Woodside Energy Limited proposes to develop approximately 17 wells from three drill centres on the sea bed near Scott Reef. The proposal includes supporting subsea infrastructure, including wellheads, manifolds, flowlines and umbilicals. The drill centres and associated infrastructure are proposed to be located in water greater than 350 metres deep, with two of the drill centres between North and South Scott Reef and one north east of North Scott Reef. Scott Reef is located approximately 425... Read more...Last updated: January 13, 2014
The Environmental Protection Authority has received a referral from Buru Energy Ltd for a proposal to carry out tight gas stimulation using hydraulic fracturing of four existing exploration wells in the Canning Basin area of Western Australia. The four wells to undergo hydraulic fracturing are Yulleroo 3, Yulleroo 4, Valhalla North 1 and Asgard 1. The proposal does not involve any clearing of vegetation as it is utilising existing wells approved by the Department of Mines and Petroleum. The... Read more...Last updated: November 18, 2013
The proposal is to carry out test drilling for hydrocarbons near the boundary of Lesueur National Park, inland from Jurien Bay. The proposal would be situated on farmland adjacent to the National Park and the well would be drilled vertically (no deviated or horizontal drilling is proposed) with the surface location of the well approximately 200 metres from the National Park boundary and bottom hole location approximately 350 metres from the National Park boundary. The drilling would be a depth... Read more...Last updated: December 17, 2012
Empire is proposing to conduct a 3D seismic survey over the Gingin Gas Fields including parts of the Boonanarring and Bartlett's Well nature reserves, utilising a helicopter assisted or 'heliportable' technique, transporting drilling and seismic receiver equipment by a long-line, suspended beneath a helicopter. The equipment is lowered into position and released at pre-programmed points. Charges are detonated one at a time and seismic data is recorded. Site remediation and site... Read more...