Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Sand, rock, gravel and clay filter Sand, rock, gravel and clay
  • Waste management (2) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (13) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (8) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (4) Apply Assessment has been terminated under s40A of the EP Act filter
  • Public Environmental Review period closed (2) Apply Public Environmental Review period closed filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • EPA Report and Recommendations released - appeals closed (1) Apply EPA Report and Recommendations released - appeals closed filter
  • EPA Report and Recommendations released - appeals open (1) Apply EPA Report and Recommendations released - appeals open filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Seven-day public comment period closed (1) Apply Seven-day public comment period closed filter

Filter by relevant environmental factors:

  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (29) Apply Flora and Vegetation filter
  • Social Surroundings (17) Apply Social Surroundings filter
  • Hydrological Processes (13) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (13) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (9) Apply Terrestrial Environmental Quality filter
  • Inland Waters (6) Apply Inland Waters filter
  • 37 (5) Apply 37 filter
  • Human Health (3) Apply Human Health filter
  • Landforms (3) Apply Landforms filter
  • 3144 (1) Apply 3144 filter
  • People (1) Apply People filter

Filter by Proponent:

  • Hanson Construction Materials Pty Ltd (3) Apply Hanson Construction Materials Pty Ltd filter
  • Kemerton Silica Sand Pty Ltd (2) Apply Kemerton Silica Sand Pty Ltd filter
  • McDougall Quarries Pty Ltd (2) Apply McDougall Quarries Pty Ltd filter
  • Tellus Holdings Ltd (2) Apply Tellus Holdings Ltd filter
  • Aurex Pty Ltd (1) Apply Aurex Pty Ltd filter
  • BGC (Australia) Pty Ltd (1) Apply BGC (Australia) Pty Ltd filter
  • Boral Resources (WA) Ltd (1) Apply Boral Resources (WA) Ltd filter
  • Brikmakers (1) Apply Brikmakers filter
  • Brikmakers (BGC Australia Pty Ltd) (1) Apply Brikmakers (BGC Australia Pty Ltd) filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • Capitary No. 3 Pty Ltd (1) Apply Capitary No. 3 Pty Ltd filter
  • Doyles Lime Services Pty Ltd (1) Apply Doyles Lime Services Pty Ltd filter
  • Hanson Australia Pty Ltd (1) Apply Hanson Australia Pty Ltd filter
  • Ietto Farms Pty Ltd (1) Apply Ietto Farms Pty Ltd filter
  • JAB Industries (1) Apply JAB Industries filter
  • Midland Brick Company Pty Ltd (1) Apply Midland Brick Company Pty Ltd filter
  • Mr P Gangemi (1) Apply Mr P Gangemi filter
  • Perpetual Resources Limited (1) Apply Perpetual Resources Limited filter
  • PMR Quarries Pty Ltd (1) Apply PMR Quarries Pty Ltd filter
  • Questdale Holdings Pty Ltd (1) Apply Questdale Holdings Pty Ltd filter
  • Robe River Mining Co Pty Ltd (1) Apply Robe River Mining Co Pty Ltd filter
  • Shire of Denmark (1) Apply Shire of Denmark filter
  • Shire of Serpentine Jarrahdale (1) Apply Shire of Serpentine Jarrahdale filter
  • Simcoa Operations Pty Ltd (1) Apply Simcoa Operations Pty Ltd filter
  • Urban Resources Pty Ltd (1) Apply Urban Resources Pty Ltd filter
  • VRX Silica Limited (1) Apply VRX Silica Limited filter
  • VRX Silica Ltd (1) Apply VRX Silica Ltd filter

Filter by region:

  • Perth (12) Apply Perth filter
  • South West (7) Apply South West filter
  • Wheatbelt (4) Apply Wheatbelt filter
  • Mid West (3) Apply Mid West filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Peel (2) Apply Peel filter
  • Great Southern (1) Apply Great Southern filter
  • Kimberley (1) Apply Kimberley filter
  • Pilbara (1) Apply Pilbara filter

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2024 (5) Apply 2024 filter
  • 2022 (4) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2019 (2) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2017 (2) Apply 2017 filter
  • 2016 (4) Apply 2016 filter
  • 2015 (2) Apply 2015 filter
  • 2014 (1) Apply 2014 filter
  • 2013 (1) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (1) Apply 2011 filter
  • 2009 (1) Apply 2009 filter
  • 2003 (1) Apply 2003 filter
  • 2000 (1) Apply 2000 filter
  • 1992 (1) Apply 1992 filter
  • 1991 (1) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Sand, rock, gravel and clay
  4. Terrestrial Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Arrowsmith North Silica Sand Project

Last updated: January 9, 2025

VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...

Beharra Silica Sand Project

Last updated: October 14, 2024

Perpetual Resources Limited propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 300 km north of Perth. The proposal would include a total disturbance of 590 hectares of native vegetation and will involve sequential mining of sand above the water table. 100 ha will be cleared within the first two years followed by annual clearing of 20 ha cells and progressive rehabilitation of mined cells. Vegetation and topsoil will be stockpiled for... Read more...

Gravel Mining at Scrivener Road Reserve Serpentine

Last updated: September 13, 2024

The Shire of Serpentine Jarrahdale proposes to extract gravel from a twelve hectare area known as the Scrivener Road Gravel Reserves. The reserves are located at the top of the scarp south of Serpentine and contain nesting habitat for all three protected black cockatoo species. Extraction is proposed in two hectare stages over a period of thirteen years. Read more...

Sandy Ridge Facility – Alignment of Gate Waste Acceptance Tonnage

Last updated: June 25, 2024

Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...

Arrowsmith Central Silica Sand Project

Last updated: May 27, 2024

The proponent (VRX Silica Ltd) proposes to develop a high-grade silica sand mine in the Geraldton Sandplain bioregion of WA, approximately 260 km north of Perth and 20km North-West of Eneabba. The proposal would include a total disturbance of 334 hectares of native vegetation. Vegetation and topsoil would be relocated to rehabilitation areas using a Vegetation Direct Transfer method (VDT). Mining is proposed to occur in blocks (150m x 150m), with up to five blocks being mined each year. The... Read more...

North Kiaka Quartzite Mine

Last updated: April 24, 2024

Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine. The proposal will include the establishment of an above groundwater mine pit, waste rock landform, infrastructure corridor and associated infrastructure. Quartzite would be trucked to Simcoa’s existing smelter in the Kemerton Strategic Industrial Area 17 km north-east of Bunbury. It is anticipated the... Read more...

Lots 2 and 10 Rowley Road, Mandogalup

Last updated: September 6, 2022

Questdale Holdings Pty. Ltd. (the proponent) are proposing to clear vegetation for bushfire fuel reduction and to extend an existing sand quarry extraction operation within Lots 2 and 10 Rowley Road, Mandogalup. The proposal area consists of 43.67 hectares (ha) and is located on freehold land. The proponent proposes to extract sand at a rate of 195,000 tonnes per annum for a period of 10 years. Excavated material will be screened prior to loading. The proponent proposes to clear approximately... Read more...

Gidgegannup Granite Quarry (S46) [2342]

Last updated: May 30, 2022

The requested change relates to condition 3 of Statement 1035 (as relevant to Statement 861) for an extension to the Time Limit for Proposal Implementation. Read more...

Limestone and Sand Quarry Lot 1002 Preston Beach

Last updated: April 5, 2022

Doyles Lime Service Pty Ltd proposes limestone and sand excavation approximately 4.5 km north of the Preston Beach townsite, Shire of Waroona. Read more...

Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel (S46) [2264]

Last updated: February 2, 2022

Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...

Sand and Limestone Extraction, Lots 1498 and 1504 Finn Road, Myalup

Last updated: September 28, 2021

Ietto Farms proposes to extract sand and limestone from Lots 1498 and 1504 Finn Road, Myalup in the Shire of Harvey. The original extractive industry licence for this proposal expired in July 2014. The proposal would extract sand and limestone from the site, to facilitate road construction projects throughout the southwest of Western Australia. The proposal is located adjacent to Lake Preston, a conservation category wetland and RAMSAR listed wetland. The proposal would require the clearing of... Read more...

Warton Road Mining Proposal

Last updated: July 28, 2021

Hanson Australia Pty Ltd (formerly Rocla Pty Ltd) proposes to extract sand within Bush Forever Site 390, on mining tenements M70/1142 and M70/1088 approximately 20km South of Perth at Lot 467 Jandakot Road, Banjup (City of Cockburn). The proposal would include: - a development envelope of 9.56 hectares (ha), including 5.63 ha that has been historically cleared; - clearing of 3.93 ha of native vegetation; - sand extraction of 300,000 tonnes over a period of approximately three years; - dry... Read more...

Sand and Clay Extraction, 1728 Great Northern Highway, Bullsbrook

Last updated: September 2, 2019

Brikmakers (BGC Australia Pty Ltd) propose to extract clay and sand at Lots 5 and 6 (1728) Great Northern Highway, Bullsbrook. The site was historically used for the grazing of cattle. Therefore, the majority of the site has been previously cleared of vegetation. Several stands of native trees are located mostly to the west of Lot 5 and to the north of Lot 6. The proposal would include the clearing of 7 hectares of native vegetation and excavation of up to 26 metres in depth. Read more...

Sandy Ridge Project

Last updated: February 5, 2019

The proposal is to construct and operate a dual kaolin (clay) mine and a waste facility, accepting Class IV (Secure Landfill) and a V (Intractable Landfill) waste from all of Australia, including waste from offshore Oil and Gas facilities. The waste would include amongst other things low level radioactive wastes and persistent organic pollutants. The proposal would receive on average 100 000 tonnes of waste per annum for approximately 25 years. The proposal is located 140 kilometres west north... Read more...

Red Hill Quarry Development

Last updated: December 12, 2018

The proposal is to extend the existing Red Hill Quarry to the west (West Quarry Pit Extension Area A) and north-west (West Quarry Pit Extension Area B) of the current pit, and extend the existing stockpile and dispatch area, and install a quaternary crusher. Read more...

Continuation of Limestone Mining, Ocean Beach Quarry Portion of Reserve A24913, Ocean Beach Road, Denmark (s46)

Last updated: November 20, 2017

Read more...

Extension of Kemerton Silica Sand Dredge Mining (s46)

Last updated: November 13, 2017

Read more...

Sand and Limestone Extraction M70/1319 and M70/1320

Last updated: December 8, 2016

PMR Quarries Pty Ltd, trading as WA Limestone, proposes to develop a sand and limestone quarry in the McLarty State forest (pine plantation) at Myalup, 8 kilometres south east of Lake Clifton township. Read more...

Gidgegannup Granite Quarry, Gidgegannup, City of Swan (s46)

Last updated: September 6, 2016

The proposal is to develop a granite quarry in Gidgegannup, which is expected to yield up to 500,000 tonnes of rock per annum. The proposal is further documented in EPA Report 1375 and Ministerial Statement 861 . Read more...

Karnup Sand Mining Project

Last updated: July 4, 2016

Urban Resources Pty Ltd proposes to develop a sand quarry on tenement M70/1262, located in Karnup approximately 48 kilometres (km) south of the Perth Central Business District. The proposal would extract 1.5 million cubic metres over a project life of around five years with a total disturbance footprint of around 42 hectares including the mining area, stockpiles, a haul road and site compound. The proponent has advised that the overall post-mining land use is expected to be consistent with the... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.