This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 6, 2012
FMG Iron Bridge Limited proposes to develop the North Star Hematite Project (the Project), located approximately 110 km south of Port Hedland in the Pilbara region of Western Australia. The Project includes a new mine with one open pit, one waste dump, processing area, accommodation camp, sewerage treatment, workshops, fuel storage and other associated mine infrastructure to enable extraction of oxide ore at a rate of up to 5.0 Mtpa for approximately 2.3 years. Ore will be processed through... Read more...Last updated: July 24, 2012
The proposal is to develop and operate a direct shipping iron ore project in the Pilbara. The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. Read more...Last updated: July 6, 2012
The proposal is to mine iron ore from the Stage 1 project area on the southern slopes of the Chichester Range and develop associated mining infrastructure. Inquiry under s46 into request to change condition 9 of Ministerial Statement 824 - Short-Range Endemic Invertebrates. Read more...Last updated: April 12, 2012
The assessment is an inquiry into conditions of Ministerial Statement 584 , and relates to discharge of water to Weeli Wolli Springs. The original proposal is for the establishment of an iron ore mine in the Hope Downs area, 75km north-west of Newman, including facilities for limited processing of the ore, and a rail connection from the mine to a rail network for the transport of iron ore product to the coast. Read more...Last updated: April 2, 2012
The proposal is to expand Fortescue Metals' current operations within the Pilbara region, Western Australia to include the development of a new iron ore project, known as the Io Project, which is located within the Nyidinghu Study Area. The Project is located on Marillana Station approximately 40 kilometres (km) south of Fortescue’s Cloudbreak operations and approximately 100 km north-west of Newman. The major components of the Project are: An iron ore mine and resource comprising Brockman... Read more...Last updated: March 28, 2012
The original proposal, as set out in the proponent’s PER, comprised four iron ore mines in the Pilbara region, an ore beneficiation plant, a borefield, an accommodation village and 160km of east-west railway connecting to the north-south link to Port Hedland. Since release of the PER, FMG has made several major modifications to the proposal: the proposed mines at Mt Lewin and Mt Nicholas have been excised; the connecting infrastructure to those minesites is not now needed, leading to a change... Read more...Last updated: March 28, 2012
The proposal is to mine high-grade detrital iron ore from Hamersley Iron's leases on Mt Brockman station. The deposits lie at the foot of the Brockman massif some 3km from Mt Brockman and 55 km north-west of Tom Price. Ore will be extracted from one pit 1500 metres long by 500 metres wide and up to three smaller pits of about 500 metres by 200 metres. Open cut mining methods would be used, involving the stockpiling of topsoil and about 5 million tonnes of waste overburden per year, then... Read more...Last updated: December 15, 2011
The currently approved Yandicoogina Iron Ore Mine and Railway (also known as "Yandi (HIY) Project") is located approximately 90 kilometres north west of the town of Newman. This currently approved project involves the construction and operation of: an open cut iron ore mine; facilities to crush and screen ore and convey it to the railloadout facility; and a 90 kilometre rail section which connects the mine to the Central Pilbara Railway. Compared with the approved project (... Read more...Last updated: November 1, 2011
Proposal under section 46 of the, Environmental Protection Act 1986, to change condition 8-1 of Ministerial Statement 840. Read more...Last updated: October 12, 2011
Channar Mining Pty Ltd has submitted a proposal to mine iron ore in the Channar Mining Area Hamersley Ranges of Western Australia. The proposal involves the establishment of primary and secondary crushers adjacent to the mine site to crush the ore. The crushed ore will then be transported by conveyor to Paraburdoo for further treatment. The initial output will be 3 million tonnes per annum (Mt/a) increasing to 10 Mt/a by the ninth year. The expected lifetime of the mine is 22 years and the... Read more...Last updated: June 10, 2011
The proposal encompasses an open pit iron ore mine at Cloud Break, approximately 100 kilometres north-north-west of Newman, and an accommodation village. Read more...Last updated: July 8, 2010
BHP Billiton Iron Ore is proposing to develop the Orebody 24 (OB24) deposit located north of Orebody 25 (OB25) Mine, and approximately 10 km north-east of the town of Newman in the Pilbara Region. New and existing OB25 infrastructure would be utilised. Read more...Last updated: December 23, 2009
The construction and operation of a 44.8 million tonnes per annum iron ore mine, power station, desalination plant, processing plant and accommodation and port facilities in the Cape Preston area as documented in Schedule 1 of Statement 635. The processing plant will produce pelletised, direct-reduced iron and hot-briquetted iron. Inquiry under s46 into changing the conditions of Ministerial Statement 635. Read more...Last updated: December 23, 2009
Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...Last updated: October 12, 2009
The proposal is for an increase in the mining rate from approximately 12 Mtpa to 45 Mtpa. The Wheelarra Hill Mine located approximately 40 km from Newman. The proposal includes clearing of an additional 580 ha of vegetation. The required water supply would increase from 3,750 kL per day to 11,800 kL per day. The proposal also involves the construction of a new rail spur and loop and Train Load-out facilities as well as the upgrading of existing 66 kV power line and installation of a second line. Read more...Last updated: July 20, 2009
The proposal is to develop and operate a direct shipping iron ore project in the Pilbara, as allowed in Ministerial Statement 775 . The project involves the open-cut mining of eight small pits approximately 70 kilometres east of Port Hedland to obtain direct shipping ore quality haematite. Annual ore production will be 1.5 million tonnes. This assessment is for the proposal under s46 of the EP Act to remove condition 8-1 related to troglofauna sampling. Read more...Last updated: April 28, 2009
The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: June 12, 2008
Proposal by Hamersley Iron Pty Limited (the proponent) to increase the throughput of iron ore at its Dampier Port operations from 120 million tonnes per annum (Mtpa) to 145Mtpa. Read more...Last updated: March 20, 2008
The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...