Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Iron Ore filter Iron Ore
  • Infrastructure (41) Apply Infrastructure filter
  • Industrial (2) Apply Industrial filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • Flora and Vegetation (84) Apply Flora and Vegetation filter
  • Terrestrial Fauna (60) Apply Terrestrial Fauna filter
  • Hydrological Processes (53) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (42) Apply Inland Waters Environmental Quality filter
  • Subterranean Fauna (42) Apply Subterranean Fauna filter
  • Social Surroundings (29) Apply Social Surroundings filter
  • 37 (21) Apply 37 filter
  • Inland Waters (8) Apply Inland Waters filter
  • Landforms (8) Apply Landforms filter
  • Marine Environmental Quality (8) Apply Marine Environmental Quality filter
  • Terrestrial Environmental Quality (7) Apply Terrestrial Environmental Quality filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • Benthic Communities and Habitats (4) Apply Benthic Communities and Habitats filter
  • People (3) Apply People filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • 3144 (1) Apply 3144 filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (19) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (13) Apply Hamersley Iron Pty Limited filter
  • Fortescue Metals Group Limited (6) Apply Fortescue Metals Group Limited filter
  • Hamersley Iron Pty Ltd (6) Apply Hamersley Iron Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (6) Apply Roy Hill Iron Ore Pty Ltd filter
  • BHP Iron Ore Pty Ltd (5) Apply BHP Iron Ore Pty Ltd filter
  • Forge Resources Swan Pty Ltd (4) Apply Forge Resources Swan Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (4) Apply Robe River Mining Co. Pty. Ltd filter
  • API Management Pty Limited (3) Apply API Management Pty Limited filter
  • Fortescue Metals Group Ltd (3) Apply Fortescue Metals Group Ltd filter
  • Robe River Mining Company Pty Ltd (3) Apply Robe River Mining Company Pty Ltd filter
  • Atlas Iron Pty. Ltd. (2) Apply Atlas Iron Pty. Ltd. filter
  • Australian United Steel Industry Pty Limited (2) Apply Australian United Steel Industry Pty Limited filter
  • BHP Iron Ore (Jimblebar) Pty Ltd (2) Apply BHP Iron Ore (Jimblebar) Pty Ltd filter
  • Brockman Iron Pty Ltd (2) Apply Brockman Iron Pty Ltd filter
  • Bungaroo South Pty Ltd (2) Apply Bungaroo South Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (2) Apply Hope Downs Management Services Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Mineralogy Pty Ltd (2) Apply Mineralogy Pty Ltd filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (2) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • PIOP Mine Co NL (2) Apply PIOP Mine Co NL filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (2) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • Atlas Iron Limited (1) Apply Atlas Iron Limited filter
  • Atlas Iron Ltd (1) Apply Atlas Iron Ltd filter
  • Australian Aboriginal Mining Corporation Pty Ltd (1) Apply Australian Aboriginal Mining Corporation Pty Ltd filter
  • BHP Direct Reduced Iron Pty Ltd (1) Apply BHP Direct Reduced Iron Pty Ltd filter
  • BHP Iron Ore (Goldsworthy) Limited (1) Apply BHP Iron Ore (Goldsworthy) Limited filter
  • BHP Iron Ore limited (1) Apply BHP Iron Ore limited filter
  • BHP Iron Ore Pty Ltd. (1) Apply BHP Iron Ore Pty Ltd. filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • Channar Mining Pty Ltd (1) Apply Channar Mining Pty Ltd filter
  • FerrAus Pty Limited (1) Apply FerrAus Pty Limited filter
  • Ferro Metals Australia Pty Ltd (1) Apply Ferro Metals Australia Pty Ltd filter
  • FMG (1) Apply FMG filter
  • Fortescue Metals Group (1) Apply Fortescue Metals Group filter
  • Hamersley HMS Pty Limited (1) Apply Hamersley HMS Pty Limited filter
  • Hamersley HMS Pty Ltd (1) Apply Hamersley HMS Pty Ltd filter
  • Hamersley Hope Management Services Pty Ltd (1) Apply Hamersley Hope Management Services Pty Ltd filter
  • Hamersley Iron – Yandi Pty Limited (1) Apply Hamersley Iron – Yandi Pty Limited filter
  • Hamersley Iron Pty. Limited (1) Apply Hamersley Iron Pty. Limited filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Korean Steel Pty Ltd (1) Apply Korean Steel Pty Ltd filter
  • Mineral Resources Limited (1) Apply Mineral Resources Limited filter
  • Mount Bruce Mining Pty Ltd (1) Apply Mount Bruce Mining Pty Ltd filter
  • Pilbara Iron Pty Ltd (1) Apply Pilbara Iron Pty Ltd filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Rio Tinto Pty Ltd (1) Apply Rio Tinto Pty Ltd filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Robe River Mining Company Pty. Ltd. (1) Apply Robe River Mining Company Pty. Ltd. filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2024 (7) Apply 2024 filter
  • 2023 (4) Apply 2023 filter
  • 2022 (2) Apply 2022 filter
  • 2021 (5) Apply 2021 filter
  • 2020 (17) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2017 (3) Apply 2017 filter
  • 2016 (10) Apply 2016 filter
  • 2015 (11) Apply 2015 filter
  • 2014 (8) Apply 2014 filter
  • 2013 (15) Apply 2013 filter
  • 2012 (6) Apply 2012 filter
  • 2011 (4) Apply 2011 filter
  • 2010 (1) Apply 2010 filter
  • 2009 (5) Apply 2009 filter
  • 2008 (3) Apply 2008 filter
  • 2007 (1) Apply 2007 filter
  • 2006 (3) Apply 2006 filter
  • 2005 (1) Apply 2005 filter
  • 2003 (1) Apply 2003 filter
  • 2000 (1) Apply 2000 filter
  • 1998 (1) Apply 1998 filter
  • 1997 (1) Apply 1997 filter
  • 1996 (4) Apply 1996 filter
  • 1995 (2) Apply 1995 filter
  • 1994 (1) Apply 1994 filter
  • 1993 (1) Apply 1993 filter
  • 1992 (2) Apply 1992 filter
  • 1988 (2) Apply 1988 filter
  1. Home
  2. Proposal search
  3. Iron Ore
  4. Pilbara
  5. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Revised Proposal for the Roy Hill Iron Ore Mine

Last updated: May 7, 2025

The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...

Greater Paraburdoo Iron Ore Hub Proposal

Last updated: November 25, 2024

Hamersley Iron Pty Limited (the proponent) propose to develop the Greater Paraburdoo Iron Ore Hub. The proposal is an expansion of the existing operations at Paraburdoo and Eastern Range which is not subject to a Ministerial Statement issued under Part IV of the, Environmental Protection Act 1986, (EP Act). The proposal area is located approximately six kilometres south of the town of Paraburdoo in the Pilbara region of Western Australia. Existing operations at Paraburdoo and Eastern Range are... Read more...

West Pilbara Iron Ore Project Stage 1 - Mine and Rail

Last updated: November 25, 2024

The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016. Read more...

McPhee Creek Iron Ore Project

Last updated: November 25, 2024

The Proposal is for the above and below water table mining of iron ore from five open cut pits, located approximately 30 km north of Nullagine. The Proposal includes the development of mine pits and associated infrastructure including but not limited to crushing and screening facilities, waste landforms, run of mine pad, access roads, solar field, administration, accommodation camp, stockpile and laydown areas, borrow pits, groundwater bores and transfer infrastructure, explosives magazine,... Read more...

Koodaideri Iron Ore Mine and Infrastructure Project

Last updated: March 7, 2024

Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...

Cloudbreak Life of Mine Expansion

Last updated: February 9, 2024

The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...

Increase in abstraction and reinjection at Cloudbreak Mine

Last updated: February 9, 2024

Fortescue Metals Group Limited proposes to increase the volume of groundwater abstraction and injection limits at the existing Cloudbreak Mine to 150 gigalitres per annum. Read more...

BHP Billiton Iron Ore - Pilbara Strategic Proposal

Last updated: February 5, 2024

BHP Billiton Iron Ore has prepared a Strategic Proposal of its future operations in the Pilbara for the next 50 to 100 years. The Strategic Proposal will facilitate a more holistic and longer term view of mining activities in the Pilbara region by identifying and assessing how impacts to the environment at a landscape scale will be managed. Read more...

Eliwana Iron Ore Mine

Last updated: November 6, 2023

Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...

Sanjiv Ridge Project - Stage 2

Last updated: September 29, 2023

Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...

Roy Hill 1 Iron Ore Project, Port Infrastructure – Ministerial Statement 858 (s46) [2145]

Last updated: July 31, 2023

This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

West Pilbara Iron Ore Project – Stage 1 Mine Area (S46) [2351 ]

Last updated: June 16, 2023

The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...

Brockman Syncline 4 Iron Ore - Revised Proposal

Last updated: September 1, 2022

Hamersley Iron Pty Limited have submitted a revised proposal for Brockman IV. This proposal provides for the expansion of the existing mine including additional clearing and the release of excess water, as well as some other minor changes. Read more...

Balla Balla Export Facilities

Last updated: July 1, 2022

The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...

North Star Magnetite Project

Last updated: December 24, 2021

The Proponent, FMG Iron Bridge Ltd, proposes to construct and operate the North Star Magnetite Iron Ore Mine, located approximately 110km south of Port Hedland, WA. The Project also includes a borefield in the Canning Basin and a slurry pipeline to transport the ore product to Port Hedland for export. Read more...

Sino Iron Mine Continuation Proposal

Last updated: September 1, 2021

The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...

Sino Iron Mine Continuation (S46) [2271]

Last updated: June 10, 2021

Delete conditions 8-4, 8-5, 8-6, 8-7 (Marine Wastewater Outfall) relating to the management of the marine wastewater outfall for the desalination plant. Amend condition 8-8 to remove reference to conditions 8-4 and 8-5. Read more...

West Angelas Iron Ore Project Deposits C, D and G

Last updated: April 16, 2021

Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman.   Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional  ... Read more...

Western Turner Syncline Iron Ore Project - Revised Proposal

Last updated: January 4, 2021

Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...

Miralga Creek DSO Project

Last updated: November 23, 2020

Atlas Iron Pty. Ltd (the proponent) propose to develop the Miralga Creek DSO Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 8 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of four to five years. Associated infrastructure will include waste rock dumps. Existing borefield and accommodation... Read more...

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.