This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: November 25, 2024
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016. Read more...Last updated: April 24, 2024
Re-opening of an iron ore mine; construction of associated infrastructure and a port facility on Koolan Island; and subsequent rehabilitation and decommissioning of the site. Read more...Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: July 1, 2022
The proposal is to construct and operate an iron ore export facility at Balla Balla midway between Port Hedland and Karratha, northwest of Whim Creek in the Pilbara region of WA. Read more...Last updated: October 5, 2020
Flinders Mines Ltd proposes to revise the already approved Pilbara Iron Ore Project located approximately 70 kilometres north-west of Tom Price in the Hamersley sub-region. The revised proposal includes additional clearing up to 300 hectares (ha) to include the Paragon ore deposit and external infrastructure (including haul roads, airstrip and accommodation camp), as well as an increase in abstraction of groundwater of up to 2 Gigalitre per annum. Read more...Last updated: July 23, 2020
Changes to Condition 3 in order to extend the Time Limit of Authorisation for commencement of the proposal. Read more...Last updated: July 23, 2020
Change to condition 3 to extend the authorised timeframe for substantial commencement of the proposal by five years, to 12 February 2024. Read more...Last updated: April 28, 2020
To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...Last updated: March 17, 2020
Changes to conditions 3-1 and 3-2 in order to extend the Time Limit for Proposal Implementation. Read more...Last updated: January 20, 2020
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...Last updated: July 8, 2019
The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The West Pilbara Iron Ore Project Stage 1 – Mine and Rail proposal is to develop and operate eight iron ore deposits 35 to 85 km south of Pannawonica and a heavy-haulage railway that connects the mine area to the Anketell Point Port precinct. The EPA's assessment report (Report 1409) was released on 3 August 2011. The Minister for Environment approved the proposal for implementation, subject to the implementation conditions of Ministerial Statement 881 (30 November 2011). In August 2015,... Read more...Last updated: October 28, 2015
Hamersley Iron Pty Limited proposes to revise the Marandoo project located approximately 37 kilometres east of Tom Price. The proposal involves additional clearing of 400 hectares and the amalgamation of the three existing Ministerial Statements 286, 598 and 833. Read more...Last updated: August 21, 2015
Robe River Mining Co. Pty Ltd proposes to revise the West Angelas Iron Ore Mine to include mining above and below the water table of Deposit A west and Deposit F, as satellite deposits to the existing operation. The project is located 130 kilometres northwest of Newman in the Pilbara. The proposal includes additional clearing up to 3,223 hectares (ha), an extension of the development envelope of up to 2,750 ha and an increase in abstraction of groundwater of up to 1 gigalitre per annum. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: May 14, 2015
The proposal is to construct and operate an open cut iron ore mine and associated infrastructure for the extraction, processing and transport of iron ore. The proposal is located approximately 70 km north-west of Newman in the Pilbara region of Western Australia. Read more...Last updated: October 24, 2014
The construction and operation of an open pit magnetite mine located approximately 90 kilometres east-north-east of Albany, and pipelines for ore slurry transport and return water, connecting the mine site and new port loading facilities in the Port of Albany. Inquiry into amending the conditions of Ministerial Statement 816 (extension of term). Read more...