Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Power generation filter Power generation

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • 37 (6) Apply 37 filter
  • Hydrological Processes (3) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Flora and Vegetation (2) Apply Flora and Vegetation filter
  • Social Surroundings (2) Apply Social Surroundings filter
  • Marine Environmental Quality (1) Apply Marine Environmental Quality filter
  • People (1) Apply People filter
  • Terrestrial Environmental Quality (1) Apply Terrestrial Environmental Quality filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • Griffin Power Pty Ltd (2) Apply Griffin Power Pty Ltd filter
  • State Energy Commission of Western Australia (2) Apply State Energy Commission of Western Australia filter
  • Western Australia Biomass Pty Ltd (2) Apply Western Australia Biomass Pty Ltd filter
  • Worsley Alumina Pty Ltd (2) Apply Worsley Alumina Pty Ltd filter
  • Bluewaters Power 1 Pty Ltd and Bluewaters Power 2 Pty Ltd (1) Apply Bluewaters Power 1 Pty Ltd and Bluewaters Power 2 Pty Ltd filter
  • Bluewaters Power 3 Pty Ltd (1) Apply Bluewaters Power 3 Pty Ltd filter
  • Griffin Energy Pty Ltd (1) Apply Griffin Energy Pty Ltd filter
  • Transfield Services Kemerton Pty Limited (1) Apply Transfield Services Kemerton Pty Limited filter
  • Western Power Corporation (1) Apply Western Power Corporation filter

Filter by region:

  • (-) Remove South West filter South West

Filter by last updated:

  • 2018 (3) Apply 2018 filter
  • 2015 (1) Apply 2015 filter
  • 2014 (1) Apply 2014 filter
  • 2009 (1) Apply 2009 filter
  • 2007 (1) Apply 2007 filter
  • 2005 (1) Apply 2005 filter
  • 2002 (1) Apply 2002 filter
  • 1995 (1) Apply 1995 filter
  • 1991 (2) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Ministerial Statement published
  4. South West
  5. Power generation

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Bluewaters Power Station Phase I

Last updated: April 4, 2018

Griffin Energy Pty Ltd, proposes to construct and operate the 200MW Bluewaters Power Station on a site located approximately 4km north-east of Collie. It will be a subcritical coal fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters Power Station will supply electricity to customers in the proposed Coolangatta Industrial Estate, or via the South West Interconnected System (SWIS). Read more...

Bluewaters Power Station Phase II

Last updated: April 4, 2018

Griffin Power Pty Ltd, proposes to construct and operate a 200MW coal-fired power station known as the Bluewaters Power Station Phase II (Bluewaters II) adjacent to the proposed Bluewaters Power Station (Bluewaters I) on a site located approximately 4km north-east of Collie. It would be a subcritical coal-fired base-load generation facility with a nominal generating capacity of up to 200MW. The Bluewaters II Power Station would supplement the Bluewaters I Power Station and supply electricity... Read more...

Bluewaters Power Station Phases I and II (s46) [1607]

Last updated: March 23, 2018

The Bluewaters Power Station Phase I and II proposals were to construct and operate a sub-critical coal-fired base-load power generating facility with a nominal generating capacity of 200 megawatts per phase, four kilometres north east of Collie. The previous Minister for Environment requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions relating to the Bluewaters Power Station proposal, with particular... Read more...

Bluewaters Power Station Expansion - Phase III and Phase IV (s46)

Last updated: May 1, 2015

The proposal is for the construction and operation of two nominal 229 Megawatt (208 Megawatt net sent-out) subcritical coal-fired base-load generation plants (i.e. Bluewaters Power Station Phases III and IV) on a site adjacent to the existing Bluewaters Phase I and Phase II generating plants located approximately 4.5 kilometres north-east of Collie. The proposal is further documented in Ministerial Statement 837 and EPA Report 1349 . This assessment deals with a request for a change to the Time... Read more...

40MW Biomass Power Plant, Manjimup (s. 46)

Last updated: October 2, 2014

The proposal involves the construction and operation of a 40 Megawatt power plant fueled by up to 380,000 tonnes (+/-10%) per annum of, Eucalyptus globulus, (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station. Inquiry under s46 in response to a request for extension of timeframe for substantial commencement, condition 3 of Ministerial Statement 791. Read more...

40MW Biomass Power Plant, Manjimup

Last updated: March 13, 2009

The proposal involves the construction and operation of a 40 Megawatt power plant fuelled by up to 380,000 tonnes (+/-10%) per annum of, Eucalyptus globulus, (Bluegum) and pine plantation wastes, a pipeline for water supply, and a power line connecting the power plant to the sub-station. Read more...

Kemerton Power Station Enhancement Project

Last updated: August 9, 2007

The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...

Gas Fired Co-generation Facility

Last updated: October 19, 2005

Worsley Alumina’s alumina refinery has existing approval for the production of 3.7 million tonnes per anum (Mtpa) of alumina. This proposal is for the construction and operation of a natural gas-fired, co-generation option. The proposal would be implemented in two stages, each consisting of a gas turbine with a nominal generation capacity of 120 MW electrical output and a heat recovery steam generator (HRSG) of nominally 210 MW steam output. The facility would be located at the Worsley alumina... Read more...

Gas-Fired Power Station and Natural Gas Pipeline, 12km NW of Boddington

Last updated: July 2, 2002

The construction and operation of a 110 MW gas-fired power station at the Boddington Gold Mine approximately 12 km north-west of Boddington and the construction of a natural gas pipeline to the power station, predominantly along the railway reserve between Pinjarra and Boddington. Read more...

Pinjar Gas Turbine Power Station (s46)

Last updated: July 17, 1995

Inquiry under s46 regarding a proposal to increase the generating capacity of the Pinjar station by a nominal 340MW. This increased capacity would be provided through the installation of: a fourth Frame 9 (nominally llOMW) gas turbine, together with; four waste heat boilers and two 115MW steam turbines with associated infrastructure. This proposal will increase the total potential generating capacity of the Pinjar station from a nominal 575MW (7 times 37MW plus 3 times 105MW) to 915MW (575MW... Read more...

Proposed Power Supply: Expansion of Pinjar Turbine Power Station

Last updated: August 21, 1991

SECWA proposes to expand the generating capacity of the approved Pinjar gas turbine power station site (eight 37MW units) by approximately 300 megawatts (MW). This represents a doubling in the power generating capacity of the power station. In SECWA's original proposal (approved under Ministerial Statement 61 ) the plant was proposed to be a peaking plant which can operate at times of high demand (1 to 8 hours per day) or in emergencies. In this expansion proposal the new gas turbines are... Read more...

Proposed Collie Power Station

Last updated: June 12, 1991

The proposal is to establish a second coal-fired base load power station 8km east-north-east of Collie. The proposal includes the construction of two 300 megawatt power generating units and associated infrastructure that will occupy 388 hectares of land. The proposed site is located on the edge of the Collie Coal Basin which is an area that contains the mineable coal reserves in the Collie region., The report:, An integral part of the environmental impact assessment process includes the need to... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.