ProjectProponent: Transfield Services Kemerton Pty LimitedProposal description: The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient temperature. Assessment Number: 1679Region: South WestReferred under EP Act: s38Industry sector: Power generationLast updated: August 9, 2007Current Status: Ministerial Statement published 1. ReferralReferral documentation: Kemerton Power Station Enhancement Project - Environmental Approval Supporting Documentation (PDF, 34.18 MB) 2. Decision on whether to assess this proposalChair's Determination: Assessment on referral information (ARI)Extract of determination: 1679-CD-280507.pdf (PDF, 44.76 KB)Preliminary Environmental Factors: Terrestrial Environmental QualityTerrestrial FaunaHydrological ProcessesInland Waters Environmental QualityDate published: Monday, 28 May, 2007 4. EPA Report on assessmentEPA Report Number: 1258EPA Report: Kemerton Power Station Enhancment project (PDF, 3.64 MB)Key Environmental Factors: Flora and VegetationWaterHydrological ProcessesDate published: Monday, 28 May, 2007Appeals close: Monday, 11 June, 2007 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Thursday, 9 August, 2007Ministerial Statement: Ministerial Statement 745 (PDF, 1.31 MB)