This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 24, 2015
The proposal is to develop and operate the Baby Hope iron ore deposit, located 75 km north-west of Newman in the Pilbara region of WA. The Baby Hope proposal includes above water table open pits, waste rock dumps and supporting transport infrastructure. Clearing of up to 1,000 ha within the existing Hope Downs 1 development envelope would be required for the proposal. Product from the Baby Hope deposit would be processed at the at the existing Hope Downs processing facilities. Read more...Last updated: November 17, 2015
To extend the Argyle Diamond Mine operations to develop an underground diamond mine and associated infrastructure 110 km south of Kununurra in the Shire of Wyndham-East Kimberley. This inquiry relates to Ministerial Statement 711, the subject of EPA Report 1205 . Read more...Last updated: November 12, 2015
The proposal is to construct and operate an open-cut iron ore mine, and associated infrastructure, approximately 40 kilometres (km) east of Newman. Read more...Last updated: November 11, 2015
The proposal is to extend the mining of the existing approved above watertable Orebody 29, 30, and 35 mines located approximately 7 km west-south-west of Newman, in the Shire of East Pilbara, to below the watertable and discharge any excess dewatering from these three orebodies into Ophthalmia Dam. Read more...Last updated: October 28, 2015
Hamersley Iron Pty Limited proposes to revise the Marandoo project located approximately 37 kilometres east of Tom Price. The proposal involves additional clearing of 400 hectares and the amalgamation of the three existing Ministerial Statements 286, 598 and 833. Read more...Last updated: October 22, 2015
The proposal is to extend the existing Wheelarra Hill open pits, develop the South Jimblebar and Hashimoto deposits, and to increase the ore processing capacity by 30 million tonnes per annum (mtpa) to 75 mtpa. Open pit mining will occur above and below ground and will involve dewatering. Excess water will be discharged into the Ophthalmia Dam. Read more...Last updated: October 22, 2015
The Port Kennedy Regional Recreation Centre – Becher Point, Stage 1 proposal is for the creation of a major public recreation area and conservation park at Port Kennedy. Stage 1 of the proposal included a hotel, marina, holiday accommodation, two golf courses, and conservation areas. This inquiry under s46 is in regard to changing and consolidating the conditions of Ministerial Statements 105 and 359 . Read more...Last updated: October 15, 2015
BHP Billiton Iron Ore is proposing to develop and operate the Orebody 32 deposit, located approximately 10 kilometres north-east of the Newman Township in the Shire of East Pilbara. The Proposal is known as the Orebody 32 East Above Water Table Mine Project. Read more...Last updated: September 21, 2015
The proposal is to upgrade the Pinjarra Alumina Refinery. The proposal involves an upgrading of the seed filtration facility to improve its efficiency in order to increase the alumina production by approximately 17% to approximately 4.2 million tonnes per annum. This will require an increase in the bauxite mining rate at Alcoa’s Huntly bauxite mine and additional bauxite grinding, slurry storage and calcination facilities. Read more...Last updated: August 21, 2015
Robe River Mining Co. Pty Ltd proposes to revise the West Angelas Iron Ore Mine to include mining above and below the water table of Deposit A west and Deposit F, as satellite deposits to the existing operation. The project is located 130 kilometres northwest of Newman in the Pilbara. The proposal includes additional clearing up to 3,223 hectares (ha), an extension of the development envelope of up to 2,750 ha and an increase in abstraction of groundwater of up to 1 gigalitre per annum. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 5, 2015
The proposal is to construct and operate an ammonia plant on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay-Hearson Cove Industrial Area and is approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. The site covers an area of about 72 hectares and the actual plant footprint and infrastructure (including a thermal desalination plant) will occupy an area of approximately 20 hectares. Read more...Last updated: August 4, 2015
The proposal is for an exploration drilling program which involves disturbance and clearing for access tracks and drill pads, and fencing, on banded iron formation ranges of the Perenjori Hills. Read more...Last updated: July 10, 2015
The proposal involves the expansion of existing operations of the Nammuldi-Silvergrass Iron Ore Project and is therefore a Revised Proposal.The proposal includes the additional clearing of approximately 3,900 ha of vegetation for mine pits, waste dumps and associated mine infrastructure and facilities, and approximately 2,500 ha for the IAA. Read more...Last updated: July 7, 2015
Inquiry under section 46 to change condition 4-1 - Ministerial Statement 901. Read more...Last updated: June 17, 2015
This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the proposal by Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) to expand their Fimiston operations in Kalgoorlie by widening and deepening the Superpit by means of the Golden Pike Cutback, and to plan for mine closure. Read more...Last updated: June 17, 2015
To rehabilitate the BHP Titanium Minerals Beenup Project Area located 17 km north-east of Augusta in the Shire of Augusta-Margaret River. Read more...Last updated: June 15, 2015
The proposal is to construct and operate a combination railway and conveyor line, and associated infrastructure to connect the Flinders Pilbara Iron Ore Project to the Balla Balla Export Facilities in the Pilbara region of Western Australia. Read more...Last updated: May 25, 2015
The proposal is to recommence quarrying at Pivot Hill (M80/618(P) & L80/63(P)). It involves the extraction of up to 45,000 tonnes per year of basalt for use as aggregates in civil works. This would require 4.4 hectares (ha) of clearing of native vegetation in addition to the existing 2.45 hectares of previously disturbed land, within a Mining Lease covering 45 ha. Crushing and screening of aggregates would be undertaken at the site. The proponent has proposed a duration of 10 years... Read more...Last updated: May 20, 2015
The proposal is for the extension of an existing quarry at The Lakes, approximately 16 kilometres east of Mundaring and 47 kilometres south-west of Northam on the Great Southern Highway. The proponent has been operating the existing quarry since 1990. The quarry provides crushed granite for a variety of uses, including concrete, road base and building products. The current quarry comprises an open pit, a crushing plant, noise attenuation bunds, product stockpiles, a water supply dam, a workshop... Read more...