This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 3, 2020
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: May 29, 2020
Section 46 - request for a change to Environmental Conditions: Inquire into the commencement of Condition 26 (Reservoir Carbon Dioxide Injection System) of Ministerial Statement 800. Read more...Last updated: May 27, 2020
Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...Last updated: May 20, 2020
Venturex Resources Limited propose to develop the Sulphur Springs Zinc-Copper Project located approximately 144 kilometres (km) south-east of Port Hedland and 57 km west of Marble Bar. The project includes an open pit mine to extract the upper portion of the orebody and an underground mine to extract the lower portion of the orebody. The project has a disturbance footprint of 313.6 hectares (ha) within an 889.2 ha development envelope and consists of the following physical and operational... Read more...Last updated: April 28, 2020
To develop and operate an iron ore mine, processing facilities and supporting infrastructure, 45 km south-south-east of Pannawonica in the Shire of Ashburton, and a 176 km haul road from the mine site to the customer delivery point near Cape Preston. Read more...Last updated: April 3, 2020
The construction of facilities for the development of the Greater Gorgon Gas Fields on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on Barrow Island. Read more...Last updated: March 17, 2020
Changes to conditions 3-1 and 3-2 in order to extend the Time Limit for Proposal Implementation. Read more...Last updated: March 17, 2020
The Jimblebar Optimisation Project is a revision of the existing Jimblebar Iron Ore Mine approved under Ministerial Statements 683, 809 and 857. The Revised Proposal is for mining operations at Jimblebar, located approximately 40 km east of the town of Newman. Mining of iron ore deposits will be undertaken above and below the water table. Mining operations will include open pits, overburden storage areas and the construction and operation of associated mine, processing and rail infrastructure.... Read more...Last updated: March 12, 2020
Atlas Iron Pty. Ltd (the proponent) propose to develop the Corunna Downs Project (the proposal), an iron ore project located in the Pilbara region of Western Australia. The proposal includes the development of five open pits using conventional drill and blast, load and haul methods. 23.3 million tonnes of iron ore will be mined above the watertable over an approximate timeframe of 6 years. Associated infrastructure will include waste rock dumps, a mine operation centre, borefield and... Read more...Last updated: January 20, 2020
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...Last updated: January 15, 2020
The proposal is to revise the Mining Area C operation (located approximately 90km WNW of Newman) to include a new satellite ore body which is located approximately 8 km to the south of the existing approved Mining Area C operations. The revised proposal would require the additional clearing of approximately 19,850 hectares of vegetation and mining below the water table. Read more...Last updated: November 26, 2019
The Proposal is located within the Pilbara Interim Biogeographic Regionalisation for Australia (IBRA) region and is located within the Fortescue and Hamersley IBRA subregions. The Approved Project (authorised by Ministerial Statement 933 , 1 February 2013) is an above the water table open cut mine and associated infrastructure, located on mining tenement M470/1439. This proposal is to mine below the water table. Read more...Last updated: November 21, 2019
The Proposal is to construct and operate the Pluto to Northwest Shelf Interconnector, a 3.3 km long, steel buried natural gas pipeline, connecting the Pluto Interconnector Compressor Station to the Karratha Gas Plant which is operated by Woodside on behalf of the North West Shelf Project participants, located on the Burrup Peninsula in the North of Western Australia. The proposal will require the clearing of an estimated 10.69 ha.3.26 ha within the Karratha Gas Plant Lease and Buffer Zone Lease... Read more...Last updated: September 16, 2019
The proposal is to develop the Griffin oilfield which is located 68km offshore from Onslow. The oilfield will be developed using a floating production, storage and offloading facility and both oil and gas will be produced. The gas will be recovered and transported to the mainland via a submarine and onshore pipeline to a gas treatment plant and then on to the Dampier-Perth gas pipeline. This assessment comprises the portion of the offshore pipeline in State waters, bringing gas onshore to the... Read more...Last updated: August 14, 2019
Fortescue Metals Group Limited proposes to build a 120 km railway linking their existing Solomon Mine with their proposed Eliwana Iron Ore Mine, located 90 km west-northwest of Tom Price (Shire of Ashburton). The eastern section of the proposed Eliwana Railway Project development envelope is adjacent to Karijini National Park. Proposed Infrastructure within the Rail Development Envelope includes: Railway and associated embankment; Rail loop; Crossing/passing loops; Railway overpass; Train... Read more...Last updated: July 8, 2019
The proposal is to revise the existing Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites Stage B located approximately 70 to 100 km north of Newman in the Pilbara region of Western Australia. The proposal includes mines and associated infrastructure at Christmas Creek and Mindy Mindy, and an east-west railway to link the Stage A north-south railway (to Port Hedland) to the Christmas Creek Mine. The revision includes modification/expansion or development of additional... Read more...Last updated: July 1, 2019
The construction of facilities for the development of the Pluto Gas Field on the North-West Shelf, and the processing and export of the gas at a liquefied natural gas plant to be constructed on the Burrup Peninsula. Extensive dredging will be undertaken adjacent to the export facility. Read more...Last updated: June 7, 2019
Kalium Lakes Potash Pty Ltd is seeking to develop a sub-surface brine deposit to produce approximately 150 kilotonne per annum of Sulphate of Potash product and by-products. The process will involve evaporation and processing operations at the Beyondie, 10-Mile and Sunshine Lakes area. The Project is located approximately 160 kilometres south east of Newman, and 75 km east of the Kumarina Roadhouse, in the eastern Pilbara region of Western Australia. The proposal includes the development of... Read more...