This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 17, 2005
Proposal by Wambo Power Ventures Pty Ltd (WPV) to construct and operate a 320 megawatt (MW) continuous base load, combined cycle gas turbine (CCGT) power station situated in Kwinana. Read more...Last updated: October 5, 2005
CSBP Limited propose to remediate the former Cresco site in Bayswater. There is up to 280,000 m 3 of contaminated soil present on site. The contamination was caused by the disposal of pyritic wastes or cinders, lead chamber washings, sodium bisulphate, den-scrubber effluent, superphosphate and other building wastes during the site’s history. The cinders, sodium bisulphate and den-scrubber effluent were deposited in excavated pits while the other wastes were disposed of on a more random basis.... Read more...Last updated: September 21, 2005
CSBP currently produces approximately 235,000 tpa of ammonium nitrate at its Kwinana operations which are located within the Kwinana Industrial Area. This proposal is to expand the ammonium nitrate production capacity to approximately 580,000 tpa by debottlenecking and duplicating its existing facilities. The expansion includes: duplication and/or debottlenecking of the existing 500 tpd nitric acid plant; duplication and/or debottlenecking of the existing 635 tpd ammonium nitrate reaction plant... Read more...Last updated: June 23, 2005
The proposal is to install improved pollution control equipment on the Liquor Burner at Kwinana in order to reduce emissions. The existing pollution control equipment on the Liquor Burner consists of a primary and secondary cyclone with water scrubbing. The proposed pollution control equipment consists of a primary cyclone, filter, wet scrubber and a regenerative thermal oxidiser (RTO). The stack height would also be increased. Alcoa predicts the proposed equipment will result in reductions of... Read more...Last updated: January 4, 2005
Proposal by Western Power Corporation (Western Power) to construct and operate a second 240MW combined cycle gas turbine (CCGT) unit (known as Cockburn 2) on its site located in Kwinana, Western Australia. Read more...