ProjectProponent: Wambo Power Ventures Pty LtdProposal description: Proposal by Wambo Power Ventures Pty Ltd (WPV) to construct and operate a 320 megawatt (MW) continuous base load, combined cycle gas turbine (CCGT) power station situated in Kwinana. Assessment Number: 1569Region: PerthReferred under EP Act: s38Industry sector: IndustrialLast updated: October 17, 2005Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Assessment on referral information (ARI)Preliminary Environmental Factors: PeopleDate published: Monday, 30 May, 2005 4. EPA Report on assessmentEPA Report Number: 1174EPA Report: EPA Report 1174 (PDF, 4.64 MB)Key Environmental Factors: PeopleDate published: Monday, 30 May, 2005Appeals close: Monday, 13 June, 2005 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Wednesday, 12 October, 2005Ministerial Statement: Ministerial Statement 0693 (PDF, 1.55 MB)