This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 5, 2019
Pilbara Energy Company Pty Ltd (a wholly owned subsidiary of Fortescue Metals Group Limited (FMG)) is seeking to develop the Pilbara Transmission Project (the proposal), a high voltage power transmission network in the Pilbara region of Western Australia. The proposal is comprised of approximately 375 kilometres of 220 kilo-volt overhead transmission lines with terminal and substation infrastructure. The proposal is to be located within a 4780 hectare (ha) development envelope. The proposal... Read more...Last updated: November 12, 2018
The proposal is to develop and operate an iron ore mine approximately 50 km west-northwest of Paraburdoo, Western Australia, a 20 km long gas pipeline corridor, and a 150 km long rail transport corridor that would connect the proposed mine to the West Pilbara Iron Ore Project Stage 1 infrastructure. Read more...Last updated: November 12, 2018
The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...Last updated: June 21, 2018
Main Roads Western Australia (MRWA) proposes to construct and maintain a new road from Northwest Coastal Highway (near Karratha), through the Millstream-Chichester National Park (NP), to the Nanutarra-Munjina Road intersection (north of Tom Price). Read more...Last updated: May 14, 2018
Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...Last updated: April 16, 2018
Johns Creek Boat Harbour is a small facility located at Point Samson, 40 km east of Karratha. Dredging of the Boat Harbour and Entrance Channel is required to restore navigable depths, and is planned for autumn 2018. Maintenance dredging is proposed to occur within the Boat Harbour and Entrance Channel, with disposal to a sandbank about 1 km south of the Boat Harbour (Western Disposal area). Read more...Last updated: March 19, 2018
The Cape Lambert to Emu Siding Rail Duplication and Borrow Pits in Millstream Chichester National Park proposal (the proposal) includes the approved rail line and eastern deviation and associated infrastructure adjacent to the existing rail line from Cape Lambert to Emu Siding. The seven borrow pits within the Millstream Chichester National Park are for use in the construction and maintenance of rail lines and associated infrastructure. The Minister for Environment has requested that the... Read more...Last updated: December 8, 2016
In September 2011 Chevron Australia Propriety Limited (CAPL) and the Department of State Development (DSD) executed an agreement (Ashburton North State Development Agreement (Wheatstone Project) (SDA)) that required CAPL, to develop and execute a project that increased potable water supply to Onslow by 2 ML/day. This project is referred to as the Onslow Water Infrastructure Upgrade Project. After completion of the works the assets will be handed-over to the Water Corporation for ongoing... Read more...Last updated: December 7, 2016
Skircon OPCO Pty Ltd (the proponent) proposes to construct and operate an offshore submarine fibre optic cable to service the iron ore and oil and gas industry. The fibre optic cable would extend from Darwin, Northern Territory to Port Hedland, Western Australia. The Environmental Protection Authority (EPA) has reviewed and considered the potential impacts of the portion of the proposal which coincides with State waters and lands. Read more...Last updated: November 29, 2016
The proponent, Iron Bridge Operations Pty Ltd (a Joint Venture between FMG Iron Bridge Pty Ltd and Formosa Steel IB Pty Ltd), proposes to construct and operate new infrastructure within the existing Herb Elliot Port Facility, Fortescue Metals Group, Port Hedland. The proposal, Iron Bridge Port Facility, is designed to accept 10 Mtpa of magnetite concentrate slurry from the North Star Magnetite Project, whereupon the slurry would be dewatered and the concentrate product stored within a shed that... Read more...Last updated: November 23, 2016
The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions of Ministerial Statement 741 and Ministerial Statement 840 relating to dust and noise regulation for Cape Lambert Port A and B development proposals under s46 of the EP Act. Read more...Last updated: August 24, 2016
The proposal involves establishing an agricultural scheme that comprises a series of irrigated pivot cells for hay production, and will aim to increase productivity and sustainability of pastoral operations in the Pilbara. The proposal will utilise mine water, surplus to other MMP2 requirements, and forms an important component of the integrated MMP2 water management strategy. The Project area is approximately 2,800 hectares of which a maximum of 1,815 hectares is to be disturbed. This includes... Read more...Last updated: March 3, 2016
The proposal includes the existing Hamersley Yandicoogina iron ore project and proposed expansion. The existing project includes open pit mining at the Junction Central and Junction South East operations and associated infrastructure, dewatering activities, closure and rehabilitation. The expansion includes the development of new pits at Junction South West and Oxbow, temporary waste landforms, the development of new infrastructure, additional dewatering and water disposal activities. The... Read more...Last updated: February 4, 2016
The West Pilbara Iron Ore Project Stage 1 – Mine and Rail proposal is to develop and operate eight iron ore deposits 35 to 85 km south of Pannawonica and a heavy-haulage railway that connects the mine area to the Anketell Point Port precinct. The EPA's assessment report (Report 1409) was released on 3 August 2011. The Minister for Environment approved the proposal for implementation, subject to the implementation conditions of Ministerial Statement 881 (30 November 2011). In August 2015,... Read more...Last updated: February 4, 2016
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. Read more...Last updated: December 14, 2015
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: October 28, 2015
Hamersley Iron Pty Limited proposes to revise the Marandoo project located approximately 37 kilometres east of Tom Price. The proposal involves additional clearing of 400 hectares and the amalgamation of the three existing Ministerial Statements 286, 598 and 833. Read more...Last updated: August 21, 2015
Robe River Mining Co. Pty Ltd proposes to revise the West Angelas Iron Ore Mine to include mining above and below the water table of Deposit A west and Deposit F, as satellite deposits to the existing operation. The project is located 130 kilometres northwest of Newman in the Pilbara. The proposal includes additional clearing up to 3,223 hectares (ha), an extension of the development envelope of up to 2,750 ha and an increase in abstraction of groundwater of up to 1 gigalitre per annum. Read more...Last updated: August 7, 2015
The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...Last updated: August 5, 2015
The proposal is to construct and operate an ammonia plant on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay-Hearson Cove Industrial Area and is approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. The site covers an area of about 72 hectares and the actual plant footprint and infrastructure (including a thermal desalination plant) will occupy an area of approximately 20 hectares. Read more...