Project Proponent IB Operations Pty Ltd Proposal description The proponent, Iron Bridge Operations Pty Ltd (a Joint Venture between FMG Iron Bridge Pty Ltd and Formosa Steel IB Pty Ltd), proposes to construct and operate new infrastructure within the existing Herb Elliot Port Facility, Fortescue Metals Group, Port Hedland. The proposal, Iron Bridge Port Facility, is designed to accept 10 Mtpa of magnetite concentrate slurry from the North Star Magnetite Project, whereupon the slurry would be dewatered and the concentrate product stored within a shed that would store up to 300 000 tonnes. Region Pilbara Referred under EP Act s38 Industry sector Infrastructure Last updated November 29, 2016 Current Status Decision on whether to assess has been published 1. Referral Comment on this referral North Star Stage 2 Port Facility Referral documentation CMS15074 Correct referral cover 23 September 2015 1.pdf (PDF, 469.47 KB) CMS15074 Referral.pdf (PDF, 36.26 MB) 2. Decision on whether to assess this proposal Chair's Determination Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable) Extract of determination Chairman's Determination - Iron Bridge Port Facility (PDF, 175.65 KB) Preliminary Environmental Factors Social Surroundings Benthic Communities and Habitats Public advice Public Advice - Iron Bridge Port Facility (PDF, 505.98 KB) Date published Monday, 25 January, 2016