This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 29, 2024
The proponent, BHP Iron Ore Pty, proposes to increase power generation capacity at the existing Yarnima Power Station, approximately 2 kilometres north-west of Newman in the Pilbara. The proposal comprises an increase in installed firm power generation capacity from 154 megawatts up to 239 megawatts via installation of gas reciprocating engines and associated infrastructure. The gas reciprocating engines are proposed to be installed in stages up to a maximum of 120 megawatts (nominal).... Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: August 22, 2022
Synergy Renewable Energy Developments Pty Ltd proposes to develop a wind farm approximately 35 kilometres north-east of Hyden townsite in the Western Australian Wheatbelt. The proposal consists of up to 30 wind turbines generating up to 150 MW, electrical substations and switchyards. The turbines will be installed on towers up to 150 m tall with blades up to 90 m long for a total height of up to 240 m. All turbines are proposed to be located at least 100 m from remnant vegetation. The proposal... Read more...Last updated: July 18, 2022
Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...Last updated: June 7, 2022
Alinta Energy Development Pty Ltd proposes to develop a 90 Mega Watts (MW) AC solar facility situated on Unallocated Crown Land near Alinta Energy’s existing Port Hedland Power Station located within the Boodarie Strategic Industrial Area. The proposal is located approximately 5 km south-west of South Hedland, adjacent to Great Northern Highway, within the Town of Port Hedland. The proposal consists of a 90 MW AC solar farm and a short (~2 km) transmission connection to the existing Port... Read more...Last updated: May 16, 2022
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: October 22, 2018
Kondinin Energy Pty Ltd is proposing to construct and operate up to 46 wind turbines, an accompanying 125 ha of solar farm, energy storage and associated infrastructure, approximately 5 kilometres north east of Kondinin, Western Australia. The proposal will be established encompassing parts all or part of 19 freehold rural lots comprising approximately 3,105 hectares. Read more...Last updated: January 12, 2017
Three Springs Solar Pty Ltd is proposing to construct and operate a 100MW solar photovoltaic power station on Lots M761-M764 and Lot 50 Bruce Road, approximately 2km north east of the Three Springs Townsite. The sites are predominately cleared farm land and no vegetation clearing is proposed. Read more...Last updated: December 10, 2012
The proposal is for the marine component of the Perth Wave Energy Project (PWEP) which involves the installation of five 11 metre diameter CETO (Carnegie's wave energy technology) units 3km south west of Garden Island and laying two pipelines to transfer the energy harnessed by the CETO units to an onshore power generation facility located on Garden Island. Read more...Last updated: October 18, 2012
The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah. Read more...Last updated: October 8, 2012
Horizon Power is proposing to meet an increase in power demand for the Town of Port Hedland generated by economic growth in the region. Construction of South Hedland Power Station was recently approved under the Environmental Protection Act 1986 (EP Act) and a Clearing Permit (Purpose Permit CPS 4049/2) has been issued. The existing Horizon Power transmission line does not have adequate capacity to sustain the expected increase in power supply from South Hedland Power Station; therefore,... Read more...