ProjectProponent: Verve EnergyProposal description: The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah. Region: Mid WestReferred under EP Act: s38Industry sector: Power generationLast updated: October 18, 2012Current Status: Decision on whether to assess has been published 1. ReferralComment period: Thursday, 5 July, 2012 to Wednesday, 11 July, 2012Referral documentation: Referral Form and Development Report (ZIP, 5.56 MB) Annex 1 Planning and Context Statement (PDF, 1.17 MB) Annex 2 Landscape and Visual Impact (PDF, 8.34 MB) Annex 3 Flora, Vegetation and Fauna (PDF, 4.92 MB) Annex 4 Noise Impact (PDF, 4.41 MB) Annex 5 Background Noise Monitoring (PDF, 3.15 MB) Annex 7 Aviation Impact Statement (PDF, 6.62 MB) Annex 8 Planning Compliance Report (PDF, 1.34 MB) Annex 9 Verve Energy Safety and Health (PDF, 549.86 KB) Annex 10 Verve Energy Enviromental Policy (PDF, 52.21 KB) Annex 11 Draft Environmental Management Plan (PDF, 30.12 KB) Figures from 1 to 20 (ZIP, 5.51 MB) 2. Decision on whether to assess this proposalChair's Determination: Referral examined, preliminary investigations and inquiries conducted. Proposal not to be assessed under Part IV of the EP Act. Advice given (Appealable)Extract of determination: Chairman's Determination - Warradarge Wind Farm (PDF, 21.39 KB)Preliminary Environmental Factors: Terrestrial FaunaPublic advice: Public Advice - Warradage Wind Farm (PDF, 714.07 KB)Date published: Monday, 24 September, 2012