This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 21, 2022
The City of Stirling proposes to redevelop its existing Recycling Centre Balcatta to establish an update Community Recycling Centre (CRC) and Waste Transfer Station (WTS) Facility located at 238 Balcatta Road, Balcatta, Western Australia. The site is located within an industrial and business area and under the City’s Local Planning Scheme No. 3 has been designated as a ‘Special Control Area’ zoned as ‘Industry’. The CRC will encourage the reuse and recovery of materials and diversion of waste... Read more...Last updated: March 15, 2022
The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...Last updated: March 14, 2022
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: March 14, 2022
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: February 28, 2022
Change to conditions 1-1 (Implementation) and 2-1 (Proponent Commitments) Read more...Last updated: February 21, 2022
The City of Canning proposes to extend Southern Link Road by 0.45 kilometres to provide a connection between Grey Street and Gerard Street. The proposal is aligned along the eastern boundary of Carousel Swamp; a Conservation Category Wetland which contains the Shrublands and Woodlands on Muchea Limestone Swan Coastal Plain Threatened Ecological Community. The total extent of the proposed development envelope is 1.15 ha. Read more...Last updated: February 2, 2022
The requested changes relate to condition 3 of Statement 1041 (as relevant to Statement 826) for an extension to the Time Limit of Authorisation for Proposal Implementation. Read more...Last updated: February 2, 2022
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: February 2, 2022
Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...Last updated: February 1, 2022
Changes to condition 7 to remove reference to the onsite brickmaking facility. Read more...Last updated: February 1, 2022
The Public Transport Authority (PTA) proposes to construct and operate 8 km of new railway (including dual tracks and associated rail infrastructure), between Armadale and Byford. The proposal includes modification to the existing Armadale Station and construction and operation of a new station at Byford. The proposal includes the replacement of level crossings with grade separated crossings, either road over rail or rail over road. The proposal involves clearing of up to 50 hectares (ha) of... Read more...Last updated: February 1, 2022
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: January 31, 2022
To build and operate a waste to energy plant on Lot 9500 Leath Road, Kwinana in the Kwinana Industrial Area. Read more...Last updated: January 31, 2022
APH Contractors proposes to extract approximately 2.2 million bank cubic metres of sand from 22.87 hectares over a period of 20 years at an annual extraction rate of 100,000 – 120,000 tonnes per year. Sand will be extracted to a maximum depth of 20m Australian Height Datum (AHD). It is proposed that sand extraction will continue from east of Gelorup Hill and move progressively southwards in 18 sand extraction blocks, each between one and two hectares. Embankments will be restored to 1:4 (14o)... Read more...Last updated: January 25, 2022
Dredging of approximately 3,900,000 cubic metres of material for two new berth pockets and extensions to the existing departure channel and swing basin at Harriet Point and Stanley Point; disposal of dredged material at dredged material management areas. Read more...Last updated: January 24, 2022
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: December 24, 2021
The Proponent, FMG Iron Bridge Ltd, proposes to construct and operate the North Star Magnetite Iron Ore Mine, located approximately 110km south of Port Hedland, WA. The Project also includes a borefield in the Canning Basin and a slurry pipeline to transport the ore product to Port Hedland for export. Read more...Last updated: December 22, 2021
The proponent, Cliffs Asia Pacific Iron Ore Pty Ltd (Cliffs), owns and operates iron ore mines at the Windarling Range, the Mt Jackson Range and the Deception Deposit (collectively known as the "Yilgarn Operations") within the Shire of Yilgarn and Shire of Menzies. The Yilgarn Operations are authorised under seven Ministerial Statements issued between 2003 and 2012 by the Western Australian Minister for Environment under section 45(5) of the EP Act. These are: Ministerial Statement... Read more...Last updated: December 22, 2021
The Havieron Underground Mine Project (the Project) is a greenfield gold-copper deposit operated located in the East Pilbara Shire of Western Australia, and is approximately 45 kilometres (km) east of Newcrest’s Telfer Gold Mine and 450 km east south east from the town of Port Hedland. The Project involves the development and operation of an underground mine with transport of ore to Telfer Gold Mine for processing. The underground mine and associated infrastructure includes; clearing of 530 ha... Read more...