Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Land use (12) Apply Land use filter
  • Industrial (6) Apply Industrial filter
  • Infrastructure (5) Apply Infrastructure filter
  • Nickel (2) Apply Nickel filter
  • Oil and gas (2) Apply Oil and gas filter
  • Aquaculture (1) Apply Aquaculture filter
  • Coal (1) Apply Coal filter
  • Diamonds (1) Apply Diamonds filter
  • Gold (1) Apply Gold filter
  • Iron Ore (1) Apply Iron Ore filter
  • Mineral sands (1) Apply Mineral sands filter
  • Salt (1) Apply Salt filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (28) Apply Ministerial Statement published filter
  • Proposal withdrawn (4) Apply Proposal withdrawn filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by relevant environmental factors:

  • Hydrological Processes (1) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (1) Apply Inland Waters Environmental Quality filter
  • Terrestrial Fauna (1) Apply Terrestrial Fauna filter

Filter by Proponent:

  • Water Authority of Western Australia (3) Apply Water Authority of Western Australia filter
  • Dominion Mining Limited (2) Apply Dominion Mining Limited filter
  • State Energy Commission of Western Australia (2) Apply State Energy Commission of Western Australia filter
  • Alcoa of Australia Ltd (1) Apply Alcoa of Australia Ltd filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • City of Wanneroo (1) Apply City of Wanneroo filter
  • D'Orsogna Bros Pty Ltd (1) Apply D'Orsogna Bros Pty Ltd filter
  • D W Duffy (1) Apply D W Duffy filter
  • Dampier Salt (Operations) Pty Ltd (1) Apply Dampier Salt (Operations) Pty Ltd filter
  • Department of Planning and Urban Development (1) Apply Department of Planning and Urban Development filter
  • Doral Resources NL (1) Apply Doral Resources NL filter
  • Du Pont (Australia) Pty Ltd (1) Apply Du Pont (Australia) Pty Ltd filter
  • Gazon Pty Ltd (1) Apply Gazon Pty Ltd filter
  • Glen Retreat (1) Apply Glen Retreat filter
  • Health Department (1) Apply Health Department filter
  • HIsmelt Corporation Pty Ltd (1) Apply HIsmelt Corporation Pty Ltd filter
  • ICI Australia Operations Pty Ltd (1) Apply ICI Australia Operations Pty Ltd filter
  • Interstruct Pty Ltd. Naturaliste Development Pty Ltd (1) Apply Interstruct Pty Ltd. Naturaliste Development Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Liquid Air Pty Ltd (1) Apply Liquid Air Pty Ltd filter
  • Magic Soil Pty Ltd (1) Apply Magic Soil Pty Ltd filter
  • Magnet Industries Pty Ltd (1) Apply Magnet Industries Pty Ltd filter
  • Main Roads Department (1) Apply Main Roads Department filter
  • Marine Industries Limited (1) Apply Marine Industries Limited filter
  • Mr R Anderson (1) Apply Mr R Anderson filter
  • Ormond Nominees (1) Apply Ormond Nominees filter
  • Poseidon Bow River Diamond Mine Limited (1) Apply Poseidon Bow River Diamond Mine Limited filter
  • Southern Plantations Chip Company Pty Ltd (1) Apply Southern Plantations Chip Company Pty Ltd filter
  • WA Refiners Pty Ltd (1) Apply WA Refiners Pty Ltd filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • Perth (21) Apply Perth filter
  • Peel (3) Apply Peel filter
  • South West (3) Apply South West filter
  • Goldfields Esperance (2) Apply Goldfields Esperance filter
  • Great Southern (2) Apply Great Southern filter
  • Pilbara (2) Apply Pilbara filter
  • Kimberley (1) Apply Kimberley filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 1990 filter 1990
  1. Home
  2. Proposal search
  3. 1990

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Proposed Victoria-Bickley Redevelopment Scheme

Last updated: July 20, 1990

The proposal is to redevelop the existing Victoria Reservoir on Munday Brook, approximately 20 kilometres east of Perth. This is considered necessary by the Water Authority of Western Australia due to the age and condition of the existing dam, and timely in view of the current residential and rural development pressures being placed on the associated water catchments. Redevelopment of the Victoria Reservoir would involve the creation of a new larger dam to replace the existing structure to gain... Read more...

Proposed Beenyup wastewater ocean outlet duplication into Marmion Marine Park

Last updated: July 13, 1990

The proposal, by the Water Authority of Western Australia, consists of a preferred option of constructing a 1420 mm diameter pipeline from the Water Authority of Western Australia's property adjacent to the Ocean Reef Boat Harbour, out to sea for a distance of 1800 m. This proposal will increase the capacity to dispose of treated wastewater from the current level of 54 Megalitres per day (ML/day) to a maximum of 150 ML/day. The secondary treated effluent will be discharged into the ocean... Read more...

Boddington Gold Mine Project - Modification to processing and disposal of supergene and copper-rich basement ores (s46) [238B]

Last updated: June 8, 1990

Inquiry under s46 into amending the conditions of Ministerial Statement 85 . Worsley Alumina Pty Ltd submitted a Notice of Intent for the mining and processing of supergene and basement ores at the Boddington Gold Mine in July 1989. Following assessment of the Notice of Intent by the Environmental Protection Authority, the Minister for the Environment issued a statement "that the proposal may be implemented" on 22 November 1989 (Ministerial Statement 85). Further metallurgical... Read more...

Proposed Transmission Line Corridor Northern Terminal Substation to Pinjar Gas Turbine Power Station

Last updated: April 30, 1990

The proposal is to construct a power transmission line, with an associated corridor, between the existing Northern Terminal substation and a gas turbine power station at Pinjar which is presently under construction. Read more...

Solid Sodium Cyanide Plant Kwinana

Last updated: April 26, 1990

The proposal is to construct and operate a sodium cyanide plant at Kwinana. The plant would have the capacity to produce 45,000 tonnes of solid sodium cyanide briquettes annually. Sodium cyanide is predominantly used as a leaching agent in the gold extraction process. All solid sodium cyanide currently used in Australia is imported. Read more...

Thomsons Lake Urban Development: Revised South Jandakot Drainage Management Plan (s46)

Last updated: April 1, 1990

The proposal is a revised plan to drain land in South Jandakot east of Thomsons Lake to enable housing development to proceed. Preparation of an acceptable drainage management plan was a condition of approval for housing development in South Jandakot issued by the Minister for the Environment in 1988 ( Ministerial Statement 45 ). In May 1989 the Environmental Protection Authority reported on a previous drainage management plan, concluding that the acceptability of the plan had not been... Read more...

Proposed remedial treatment of the State Engineering Works site, North Fremantle

Last updated: March 12, 1990

The proposal is to rehabilitate the land previously used by the State Engineering Works in North Fremantle. The proposed clean up procedure includes removal of waste material from the site to a gazetted landfill at Henderson in the City of Cockburn, and relocation of leachate spoiled sand on site. Sand whose metal ion content is higher than normal due to leaching of the ions from the waste material, will be relocated on-site above a 12 metre thick limestone base. The site will then be covered... Read more...

Wagerup Alumina Refinery Expansion

Last updated: March 8, 1990

Alcoa of Australia Pty Ltd has been operating the Wagerup Refinery (Stage 1) near Waroona (100 km south of Perth) since 1984, under the Alumina Refinery (Wagerup) Agreement and Acts Amendment No 15 of 1978. This agreement covers a production capacity up to 2 mtpa (million tonnes per annum). Initially the refinery produced about 670,000 tpa, but fine tuning of the plant (currently under way) is expected to lift its capacity to 840,000 tpa of alumina. The expansion proposal referred to in this... Read more...

Proposed Abattoir, Aurisch Road, Gingin

Last updated: March 2, 1990

The proposal is to build an abattoir on a 650ha rural site at Aurisch Road, Gingin. The site is located at the base of the Darling Scarp approximately 9km north of Gingin, 2km east of the Brand Highway and about 4km from Lakes Beermullah and White, the former being in a System 6 reserve. The proposed abattoir would process 1,000 sheep and 2,000 pigs per five day week. The site has a dwelling and a small piggery and is considered suitable by the Shire of Gingin for this proposal. The area is... Read more...

Proposed Non-Hazardous Industrial Liquid Wastes Treatment Plant at Forrestdale

Last updated: February 19, 1990

The Health Department acting under instructions from the Cabinet Committee on Metropolitan Waste, has proposed a non-hazardous industrial liquid waste treatment plant at Forrestdale on the existing Metropolitan Septage Treatment Plant site. The facility will treat this liquid waste and discharge the treated effluent to sewer. This will obviate the current method of disposal which is to discharge it to the City of Gosnells landfill site on Kelvin Road in Orange Grove. The Ctty of Gosnells gave... Read more...

Marine Industries Ltd Two Lakes Trout Farm - Pemberton

Last updated: February 2, 1990

Marine Industries Limited has, for the past five years, farmed trout and salmon at three locations on the Treen Brook, Pemberton. The present proposal is to expand those operations by constructing an additional seven "Danish earth" ponds, six of which are fish ponds and the seventh is a settling pond, at the company's Two Lakes site. Read more...

Warwick Regional Open Space - Proposed Concept Plans

Last updated: January 31, 1990

In November 1989 the City of Wanneroo submitted a study and concept plans for the Warwick Regional Open Space which is subject to Environmental Protection Authority System 6 Report recommendation M11. The study proposes that portions of the area be used for recreational purposes with other areas to be set aside for conservation. Read more...

Air Separation Unit, Kwinana

Last updated: January 26, 1990

Liquid Air WA Pty Ltd proposes to establish an Air Separation Unit to produce liquid oxygen, nitrogen and argon, and gaseous oxygen and nitrogen at Lot 129 Leath Road, Naval Base, immediately north of Wesfarmers Ltd's LPG extraction plant, and adjacent to Mason Road. The proposed plant would supply oxygen and nitrogen to the Cooljarloo Joint Venture (CJV) pigment plant, and the local merchant market. The pigment plant will require up to 35,000 tonnes per annum (t/a) of oxygen and 30,000 t/... Read more...

Expansion of Satellite Earth Station Complex, Gnangara

Last updated: January 25, 1990

The proposal is for construction of eight new satellite antennas at Gnangara, comprising the following: four small antennas, 7.5 metres diameter, maximum height above ground approximately 10 metres; three medium sized antennas, 2 x 18 and 1 x 20 metres diameter, maximum height above ground approximately 35 metres; and one large antenna 27.5 metres in diameter, maximum height above ground approximately 35 metres. The proposed site is bounded by Alexander Drive to the west, Gnangara Road to the... Read more...

Port Geographe - Stage 1

Last updated: January 17, 1990

The Port Geographe proposal is a residential canal development with harbour, commercial centre and a conservation area. The site lies on the coast immediately east of the existing Busselton built up area, between the ocean foreshore to the north and the Vasse estuary to the south and east. The project site has a total area of 300 hectares. Approximately 114 hectares of the site is proposed to become conservation area and be transferred to the Crown. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.