This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 18, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2022 to 2026. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. The 2022-26 MMP was approved, subject to exclusions, through the State Agreement Act framework in September 2022, and the proposal is currently being... Read more...Last updated: December 18, 2023
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2023 to 2027. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. A 2023-27 MMP has not yet been approved through the State Agreement Act framework but activities are still proposed to be undertaken during this time, and... Read more...Last updated: November 13, 2023
Strike South Pty Ltd proposes to construct and operate the South Erregulla Conventional Gas Development, located approximately 280 km north of Perth and 45 km southeast of Dongara in the Shire of Three Springs and the Shire of Irwin. The proposal comprises a natural gas processing facility, gas gathering network and pipeline to connect to the Dampier to Bunbury Natural Gas Pipeline. The development envelope is 283.46 ha with a disturbance footprint of 111.82 ha. No native vegetation clearing is... Read more...Last updated: November 7, 2023
Kimberley Technology Solutions Pty Ltd is referring the Cockatoo Island Multi-User Supply Base to develop an upgraded airfield, a wharf and an aftermarket subsea workshop as well as other related support infrastructure. The proposal is located on Cockatoo Island in the Shire of Derby. The proposal would include a loss of 0.54 hectares (ha) of hard coral and algae of which 0.3 ha is very sparse hard coral. The proposed new wharf would run parallel to the shoreline. The impacts to terrestrial... Read more...Last updated: November 6, 2023
Keysbrook Leucoxene Pty Ltd is proposing to expand its current mining operation for the Keysbrook Mineral Sands Project, which operates under Ministerial Statement Numbers 810 and 1089, to include an additional 511.64 hectares of mining area located immediately west of the current operations. Read more...Last updated: November 6, 2023
Napier Corporation Pty Ltd (the proponent) is proposing to develop a pivot irrigation project to supply fodder crops for pastoral use. The proposal is situated within Napier Downs Pastoral lease (LPL N049855), located in the West Kimberley region, 240 km east northeast of Broome, Western Australia. The purpose of the proposal is the pivots will grow cattle fodder crops (Rhodes grass) for pastoral purposes use on Napier Downs Station, Mount-House Station and other Napier Corporation managed... Read more...Last updated: October 23, 2023
Port Hedland Green Steel Pty Ltd proposes to develop a large-scale downstream iron ore processing facility known as the Port Hedland Green Steel Project – Stage 1. The proposal is located in the Boodarie Strategic Industrial Area (BSIA) approximately 10 km south-west of Port Hedland in the Pilbara region. The proposal will consist of a pellet plant and a hot briquette iron (HBI) plant, consuming approximately 3 - 3.5 million tonnes per annum (Mtpa) of iron ore. Most of the pellets will be fed... Read more...Last updated: October 16, 2023
Water Corporation propose to conduct a 6- month water source abstraction trial to assess the long-term viability of a new water source for Walpole, Western Australia. The trial will be conducted during the summer peak water demand period and will use existing infrastructure. The source comprises three existing deep fractured rock bores located within the following Water Corporation Lots: • Bore 5/09 is located within the Swan Road road reserve • Bore 3/20 is located within part of Lot on Plan... Read more...Last updated: October 16, 2023
De Grey Mining Ltd proposes to construct and operate the Hemi Gold Project (the Project) located approximately 85 km south of Port Hedland, in the Pilbara Region of WA. The Project involves the excavation of open pits, mine dewatering, surplus water management including reinjection and controlled discharge. Associated supporting infrastructure includes an integrated waste landform tailings storage facility, waste rock landforms, low-grade stockpiles, airstrip, accommodation village, sealed... Read more...Last updated: October 2, 2023
Bulletin Resources Limited are proposing a mineral exploration programme on exploration licence 74/655 within the Shire of Ravensthorpe. The proposal is within the Cocanarup Timber Reserve located to the west of the Ravensthorpe townsite. The proposal would include a total disturbance footprint of of 7 hectares for tracks and drill pads developed in two stages. Read more...Last updated: September 8, 2023
BHP propose to expand existing mining operations at the Newman Hub in the Pilbara, approximately 2 kilometres (km) southwest of Newman. The Proposal is a derived proposal for mining operations at Newman (Western Ridge) authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105. The proposal is to develop four iron ore deposits to expand BHP’s Newman Hub and includes: overburden storage areas ore and topsoil stockpiles haul and access roads overland conveyor 30 million... Read more...Last updated: September 8, 2023
The proposal is a derived proposal to expand existing mining operations at the Newman Hub in the Pilbara, previously authorised by Ministerial Statement (MS) 1105 Pilbara Expansion Strategic Proposal. This proponent proposes to expand the existing Orebody 32 above water table iron ore mine (currently authorised by MS 1037 Eastern Ridge Revised Proposal) in BHP’s Newman Hub to below the water table. The proposal is located 3.6 km northeast of Newman, and includes activities permitted to be... Read more...Last updated: August 14, 2023
Horizon Power is proposing to construct common user transmission infrastructure to enable the supply of grid electricity to the Burrup Strategic Industrial Area (SIA). The Proposal includes construction of an approximately 7 km long, 132 kV overhead transmission line between the Dampier substation and the Burrup SIA, clearing of unsealed access tracks along the transmission line route, an extension of the existing Dampier substation (inclusive of 132 kV switchgear, fencing and ancillary... Read more...Last updated: July 24, 2023
The Eastern Metropolitan Regional Council is proposing to construct and operate an immobilisation plant to treat Class V Air Pollution Control Residue (APCr) generated from offsite Waste to Energy plants, and to construct a dedicated Class IV monocell for disposal of the treated APCr, at the Red Hill Waste Management Facility, located within the City of Swan. The immobilisation plant will treat APCr to meet Class IV standards suitable for disposal into Class IV landfills. The existing Class IV... Read more...Last updated: July 3, 2023
The proposal is to construct and operate an extension to the Dampier Cargo Wharf at the Port of Dampier. The proposal incorporates the construction of a new (adjoining) southern section of wharf and associated mooring dolphin, dredged berth pocket and vessel manoeuvring area. The Proposal will enable larger vessels (up to Panamax class) to access the terminal and facilitate new trades and products being handled at the Port. Key construction elements of the Project include dredging, blasting,... Read more...Last updated: June 26, 2023
Inquiry into implementation Condition 10 (Terrestrial and Marine Quarantine Management System), Condition 16 (Long-term Marine Turtle Management Plan) and Condition 25 (Coastal Stability Management and Monitoring Plan) to ensure that they are effective and reflect a contemporary outcome-based condition setting. It is noted a preceding Section 46 inquiry into Ministerial 800 (dated 11-03-2023) has been requested by the Minister for Environment in relation to Conditions 9, and 15 (Inquiry 1).... Read more...Last updated: June 26, 2023
Inquire into implementation Condition 9 (Quarantine Expert Panel) and Condition 15 (Marine Turtle Expert Panel) to ensure that they are effective and act as an independent advisory group for the Minister for Environment and the proponent on matters relating to terrestrial and marine quarantine and marine turtle monitoring and management. It is noted that a second Section 46 inquiry into Ministerial 800 (dated 11-04-2023) has also been requested by the Minister for Environment in relation to... Read more...Last updated: June 26, 2023
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: June 19, 2023
Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...Last updated: June 14, 2023
Perpetual Resources Limited propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 300 km north of Perth. The proposal would include a total disturbance of 590 hectares of native vegetation and will involve sequential mining of sand above the water table. 100 ha will be cleared within the first two years followed by annual clearing of 20 ha cells and progressive rehabilitation of mined cells. Vegetation and topsoil will be stockpiled for... Read more...