This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: June 28, 2024
The proponent currently operates a mineral sands mine and concentrating facility at Waroona and a dry separation plant at Picton, near Bunbury. The proposed mining operation at Dardanup would progressively replace the Waroona mine. Minerals from the proposed mine would increase the supply to the Picton dry separation plant and would enable the proponent to expand its activities. The orebody proposed for mining as part of this project is located between Burekup and Dardanup, on the lower... Read more...Last updated: May 24, 2024
The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). Read more...Last updated: May 21, 2024
The proposal is for a major staged expansion to Wespine's operations at the pine log sawmill, Moore Road, Dardanup. By making adjustments, replacements and additions to the existing plant and equipment and methods of operation, Wespine proposes to progressively increase the throughput of the sawmill, via a series of stages, from the current annual log input capacity of 70,000 m 3 to 400,000 m 3 over a ten year period. Major changes involved in the upgrade of the Dardanup pine log sawmill... Read more...Last updated: April 26, 2024
The proposal is to continue to operate the existing Newmont Boddington Goldmine and associated infrastructure, and to expand the existing operations through widening and deepening of existing pits, and through construction of new waste dumps, residue disposal areas and associated infrastructure. Read more...Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: February 28, 2024
The, Southern Forest Irrigation Scheme, proposal involves taking water from the Donnelly River to irrigate land for horticultural and agricultural production in the southern forests region around Manjimup and Pemberton. The proposal is to construct and operate a water offtake (pump station) adjacent to the Donnelly River, a reservoir on Record Brook (a tributary of the Donnelly River), two header dams and a network of distribution water pipelines and associated infrastructure to supply water to... Read more...Last updated: January 29, 2024
Catalano Green Energy Pty Ltd (the proponent) is proposing to construct a portable 101 single person workers accommodation unit on Lot 28 Tredrea Place, Myalup, within the Shire of Harvey. The Development Envelope (approximately 40 hectares) includes Tuart Woodlands and Forest of the Swan Coastal Plain and Black cockatoo foraging habitat. The proposal includes groundwater abstraction, onsite PVC solar and battery storage for electricity generation and a wastewater treatment plant. The proposal... Read more...Last updated: November 30, 2023
The Forest Management Plan 2024-2033 (FMP 2024-2033) is a statutory plan for the management of approximately 2,522,000 hectares of land and waters vested in the Conservation and Parks Commission in the south-west of Western Australia, in accordance with the, Conservation and Land Management Act 1984, (CALM Act) to fulfil the statutory purposes for which that land is reserved. The proposal is to undertake a range of management activities, the most significant being conservation reserve creation... Read more...Last updated: November 21, 2023
The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...Last updated: June 14, 2023
Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...Last updated: May 16, 2023
Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the, Environmental Protection Act, 1986, for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. Read more...Last updated: May 15, 2023
The proposal is for extractive industry on Bussell Highway, Kudardup, in the Shire of Augusta Margaret River. The proposal is based on the Application for Development Approval, June 2020 (ADA) appended to the Shire of Augusta Margaret River’s Planning Approval / Consent No. P220293. The proponent has identified a reduced scope to only include extraction of sand from Cells 7, 8 and 9 (gravel extraction for cells 1,2,3,4,5 and 6 is excluded). All other activities within the ADA, including... Read more...Last updated: May 15, 2023
Talison Lithium Australia Pty Ltd (Talison) is proposing to expand the existing Greenbushes Lithium Mine that has been operated for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation and has not previously been assessed by the EPA. The mine is located in the South West of Western Australia, immediately south of the town of Greenbushes, approximately 250 km south east of... Read more...Last updated: May 10, 2023
The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation and... Read more...Last updated: March 27, 2023
Red Moon Property Holdings Pty Ltd and property lessee Altera Ltd propose to construct and operate Carpenter’s dam taking water from 4-mile brook. The proposal is to construct a dam not exceeding 3,400,000 cubic metres in capacity which includes an automatic bypass system that allows at least 8, 000 kilolitres of water to bypass the dam with excess water returned to the original watercourse. The proposal is in Beedelup, WA, approximately 20 kilometres Southwest of Manjimup, adjacent to the... Read more...Last updated: February 15, 2023
Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...Last updated: June 7, 2022
DevelopmentWA proposes to subdivide Lot 40 (No. 217) Devlin Road, Wellesley (Shire of Harvey) into approximately 34 lots to facilitate future industrial development. Areas of the Marriott Road reserve (Lots 41 & 42) are also proposed to be cleared to facilitate the safe movement of vehicles to and from the site and for upgrading of electrical services. The proposal would include a total development envelope of 119 hectares, including proposed clearing of up to 27.1 hectares of native... Read more...Last updated: April 5, 2022
Doyles Lime Service Pty Ltd proposes limestone and sand excavation approximately 4.5 km north of the Preston Beach townsite, Shire of Waroona. Read more...Last updated: March 15, 2022
The requested change relates to changing condition 9 in order to contemporise the condition with the Environmental Factor Guideline – Greenhouse Gas (GHG) Emissions (EPA 2020) Read more...Last updated: February 2, 2022
Change to Condition 9 (Rehabilitation) to remove reference to northern portion of Lot 2 Read more...