Last updated: October 17, 2005
The proposal is to construct and operate a 330MW capacity advanced sub-critical coal-fired power station (known as Collie B) at the Collie Power Station Site, immediately adjacent to the existing ‘Collie A’ Power Station. It will be an advanced sub-critical coal fired base-load generation facility with a nominal generating capacity of up to 330MW. The Collie B Power Station will supply electricity to Western Power for the South West Interconnected System (SWIS) under the SWIS Power Procurement... Read more...Last updated: January 21, 2003
The Minister for Environment has requested the EPA to consider and provide advice under s46(1) on changes to condition 17 of Ministerial Statement 295 . The proposal was withdrawn on 22 January 2003 subsequent to the release of the EPA's report and recommendations and the Appeals Convenor's report on appeals. Read more...Last updated: September 8, 1995
The City of Bunbury and Homeswest are joint proponents for development of a portion of the residential zoned land within Part of Lot 626, and Parts of Lots 301 - 4. The proposal also includes retention of some areas for conservation, management of the designated conservation areas and construction of a water supply storage area. Read more...Last updated: August 7, 1990
This proposal involves two types of operation, a resource extraction stage and a product generating phase. The proposal is to mine peat from within the Lake Muir Nature Reserve, east of Manjimup, and to process the material into a range of carbon and other products. The mining would take place within coal mining leases over Tordit-Gurrup Lagoon., Note:, The proposal was withdrawn by the proponent on 7 August 1990. Read more...Last updated:
McDougall Quarries Pty Ltd propose to operate a sand and limestone quarry within an approximately 14 hectare (ha) area. The quarry will be mined in 7 stages of approximately 2 ha each. The proposal is located on agricultural land located approximately 12 kilometres north-west of the Augusta Town Centre. It is anticipated that 1,314,489m3 of material will be extracted over 10 years. The proposal involves onsite screening crushing and screening of material. 0.1 ha of completely degraded native... Read more...