Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Industrial (8) Apply Industrial filter
  • Infrastructure (6) Apply Infrastructure filter
  • Land use (4) Apply Land use filter
  • Gold (2) Apply Gold filter
  • Iron Ore (2) Apply Iron Ore filter
  • Sand, rock, gravel and clay (2) Apply Sand, rock, gravel and clay filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • Ministerial Statement published (22) Apply Ministerial Statement published filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter

Filter by relevant environmental factors:

  • (-) Remove 37 filter 37
  • (-) Remove People filter People
  • Flora and Vegetation (9) Apply Flora and Vegetation filter
  • Inland Waters Environmental Quality (8) Apply Inland Waters Environmental Quality filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • Social Surroundings (4) Apply Social Surroundings filter
  • Terrestrial Fauna (4) Apply Terrestrial Fauna filter
  • Human Health (3) Apply Human Health filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Hydrological Processes (2) Apply Hydrological Processes filter
  • Subterranean Fauna (1) Apply Subterranean Fauna filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • Australian Gold Reagents Pty Ltd (2) Apply Australian Gold Reagents Pty Ltd filter
  • Ace Nominees Pty Ltd (1) Apply Ace Nominees Pty Ltd filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • CSBP Limited (1) Apply CSBP Limited filter
  • Deras (Australia) Pty Ltd (1) Apply Deras (Australia) Pty Ltd filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Iluka Resources Ltd (1) Apply Iluka Resources Ltd filter
  • Johnson and Staszewski (1) Apply Johnson and Staszewski filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) filter
  • Readymix Holdings Pty Limited (1) Apply Readymix Holdings Pty Limited filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • Striker Resources NL (1) Apply Striker Resources NL filter
  • Syntroleum Sweetwater (1) Apply Syntroleum Sweetwater filter
  • Tiwest Joint Venture (1) Apply Tiwest Joint Venture filter
  • WA Planning Commission and City of Armadale (1) Apply WA Planning Commission and City of Armadale filter
  • WA Plantation Resources (1) Apply WA Plantation Resources filter
  • Wambo Power Ventures Pty Ltd (1) Apply Wambo Power Ventures Pty Ltd filter
  • Waste Management Division of the Department of Environmental Protection (1) Apply Waste Management Division of the Department of Environmental Protection filter
  • Water Corporation (1) Apply Water Corporation filter
  • Western Power Corporation (1) Apply Western Power Corporation filter
  • Worsley Alumina Pty Ltd (1) Apply Worsley Alumina Pty Ltd filter

Filter by region:

  • Perth (11) Apply Perth filter
  • Pilbara (5) Apply Pilbara filter
  • South West (5) Apply South West filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Kimberley (1) Apply Kimberley filter
  • Wheatbelt (1) Apply Wheatbelt filter
  1. Home
  2. Proposal search
  3. People
  4. 37

Debottlenecking of Ammonia Plant from 650 tpd to 745 tpd, Kwinana Industrial Area (s46)

Last updated: June 24, 2020

Inquiry under Section 46(3) of the, Environmental Protection Act 1986, (EP Act) on CSBP Limited’s (CSBP) proposal to debottleneck their Ammonia Plant from 650 to 745 tonnes per day (tpd). Read more...

Champion Lakes Masterplan Development Lake Road Armadale

Last updated: April 3, 2017

The Western Australian Planning Commission and the City of Armadale propose to develop a water-based recreation park incorporating an international rowing course and other facilities including a residential component on land situated on Lake Road in the City of Armadale. Read more...

Dampier Port Increase in Throughput to 145 Mtpa

Last updated: June 12, 2008

Proposal by Hamersley Iron Pty Limited (the proponent) to increase the throughput of iron ore at its Dampier Port operations from 120 million tonnes per annum (Mtpa) to 145Mtpa. Read more...

Alkimos Wastewater Treatment Plant Site B

Last updated: November 13, 2007

This report provides the advice and recommendations of the Environmental Protection Authority (EPA) to the Minister for the Environment on the environmental factors and principles relevant to the proposal by the Water Corporation to construct, operate and maintain a new Wastewater Treatment Plant (WWTP) and ocean outfall at Alkimos. The proposal is to develop the plant in stages up to an operational capacity of 160ML/day beyond 2050. There are two proposed sites for the WWTP, Site A and Site B... Read more...

Synthetic Rutile Plants 1 and 2, North Capel (s46)

Last updated: December 4, 2006

Iluka Resources Ltd (Iluka) has sought to update the 1992 Ministerial Statement 291 to reflect the current operating parameters and licence conditions at the North Capel Synthetic Rutile Plants 1 and 2 site via a review of the conditions and commitments in that Ministerial statement. Accordingly, the Minister for the Environment has requested the Environmental Protection Authority (EPA) to consider and provide advice to him under Section 46(6) of the, Environmental Protection Act 1986 Read more...

Barge Site, Laydown Area and Access Road, Gumboot Bay, North Kimberley

Last updated: March 8, 2006

Striker Resources NL proposes to establish a dry door barge site, laydown area, and access road in a coastal inlet 36 kilometres (km) southeast of Cape Londonderry. The site, known locally as Gumboot Bay, is on Unallocated Crown Land that has been identified for inclusion in the Proposed Cape Londonderry National Park (PNP/215). The proposal also includes 3.6 km of unsealed road to be constructed through the PNP/215. This report provides the Environmental Protection Authority's (EPA's... Read more...

Western Extension of Nickol Bay Quarry

Last updated: February 13, 2006

Readymix Holdings Pty Limited proposes to extend its Nickol Bay quarry, located at the southern end of the Burrup Peninsula near Dampier, by an area of approximately 5.2 hectares. Read more...

Kwinana Gas-Fired Power Station

Last updated: October 17, 2005

Proposal by Wambo Power Ventures Pty Ltd (WPV) to construct and operate a 320 megawatt (MW) continuous base load, combined cycle gas turbine (CCGT) power station situated in Kwinana. Read more...

Cockburn 2 Combined Cycle Gas Turbine (s46)

Last updated: January 4, 2005

Inquiry under section 46 of the, Environmental Protection Act 1986, regarding amendments to conditions for the Cockburn 2 proposal. Read more...

Manufacture and Transport of Sodium Cyanide (s46)

Last updated: November 25, 2004

Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...

Dampier Port Upgrade to 95 Mtpa Capacity

Last updated: November 24, 2003

Proposal by Hamersley Iron to increase the capacity of its Dampier Port operations from 80 million tonnes per annum (Mtpa) (licensed capacity) to 95 Mtpa. Read more...

Outdoor Entertainment Venue Lots 1 and 2 Toodyay Road, Red Hill

Last updated: August 11, 2003

Proposal by Ace Nominees Pty Ltd (ANPL) to construct and operate an outdoor entertainment venue on Lot 2 Toodyay Road, Red Hill which is located adjacent to the northern boundary of the John Forrest National Park (JFNP). Read more...

Ludlow Titanium Minerals Mine, 34 Kilometres south of Bunbury

Last updated: May 12, 2003

Cable Sands (WA) Pty Ltd proposal to develop a mineral sands mine in a section of State Forest No.2, near Ludlow. Read more...

Donnybrook Woodchip Project

Last updated: December 10, 2002

WA Plantation Resources propose to develop a 1.0 million tonnes per annum capacity woodchip mill approximately 6km south east of Donnybrook. Read more...

Hope Downs Iron Ore Project - Rail and Port Facility, Pilbara

Last updated: December 6, 2002

Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...

Transport of solid sodium cyanide (s46)

Last updated: August 5, 2002

AGR is a joint venture between Wesfarmers CSBP Limited and Coogee Chemicals Pty Ltd which was formed to manufacture and market sodium cyanide. The AGR facility is located at Wesfarmers CSBP's fertiliser and chemicals complex in Kwinana (Figure 1). It currently operates two liquid sodium cyanide plants which have a combined production capacity of 50,000 tonnes per annum (tpa) of pure (100 percent) sodium cyanide, with the potential to expand to 70,000 tpa. These plants produce sodium... Read more...

Gas-Fired Power Station and Natural Gas Pipeline, 12km NW of Boddington

Last updated: July 2, 2002

The construction and operation of a 110 MW gas-fired power station at the Boddington Gold Mine approximately 12 km north-west of Boddington and the construction of a natural gas pipeline to the power station, predominantly along the railway reserve between Pinjarra and Boddington. Read more...

Proposed Gas to Synthetic Hydrocarbons Plant, Burrup Peninsula

Last updated: September 18, 2000

Proposal to construct a gas to synthetics plant on the Burrup peninsula. Read more...

Rehabilitation of Omex Contaminated Site, Bellevue

Last updated: December 16, 1999

The Waste Management Division of the Department of Environmental Protection (the proponent), proposes to remediate the contaminated lands of the OMEX site located between Clayton Street and Purton Place in Bellevue, WA. The Proponent has assumed responsibility for remediating the contamination caused by the previous operator of the site, Western Oil Refining Company. Read more...

Mining of gold ore from Reward and Northern orebodies adjacent to Mt Charlotte, Kalgoorlie

Last updated: May 31, 1999

Kalgoorlie Consolidated Gold Mines (KCGM), operator of Mt Charlotte underground gold mine in Kalgoorlie, proposes to mine two pits adjacent to Mt Charlotte. These pits will uncover the floor pillars of the Reward and Northern orebodies closest to the surface. the underground portions of these orebodies have already been mined as far as possible from underground. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.