Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: November 25, 2024
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: February 29, 2024
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: October 18, 2023
Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...Last updated: January 12, 2017
Three Springs Solar Pty Ltd is proposing to construct and operate a 100MW solar photovoltaic power station on Lots M761-M764 and Lot 50 Bruce Road, approximately 2km north east of the Three Springs Townsite. The sites are predominately cleared farm land and no vegetation clearing is proposed. Read more...Last updated: October 18, 2012
The proposal is for construction of up to 100 wind turbines each up to 152 metres (m) high, with a capacity of up to 250 Megawatts and all associated infrastructure: electricity transformers; underground cabling; access tracks, all weather access to Garibaldi Willis Road; crane hardstands; a substation compound including a metering building, site office and workshop and a communication mast. The proposal location is 15 km north-east of Warradarge, Shire of Coorow and Shire of Carnamah. Read more...Last updated: September 17, 2010
The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...Last updated: August 9, 2007
The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...