Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: April 7, 2025
Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...Last updated: March 27, 2025
The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...Last updated: March 7, 2025
Chichester Metals Pty Ltd is proposing to construct and operate an iron ore mine approximately 55 km north-west of Newman, and 30 km south of Fortescue’s existing Nyidinghu project in the Pilbara region. The proposal would require a disturbance footprint of 12,487 ha and is located within a 42,331 ha mine development envelope. The proposal is located within the Nyiyaparli and Nyiyaparli #3 Native Title determination area (WCD 2018/008) The proposal includes both above and below water table open... Read more...Last updated: November 12, 2024
Chalice Mining Limited proposes development of the Gonneville Nickel-Copper-Platinum Group Element (PGE) Project. The proposal is located within the Wheatbelt Region, approximately 70km north-east of Perth, 25 km west of Toodyay and 25 km south-east of Bindoon. The proposal comprises of a mine site including an open mine pit and/or underground mine and infrastructure corridor options for water and power supply. Road and/or existing rail infrastructure will be utilised in transporting supplies... Read more...Last updated: November 4, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: May 16, 2023
Worsley Alumina Pty Ltd (Worsley) proposes to upgrade the Worsley refinery in order to increase production to 4.4 million tonnes per annum (Mtpa). Worsley has approval under Part IV of the, Environmental Protection Act, 1986, for production of 3.7Mtpa, and the refinery currently operates at 3.25Mtpa. Read more...Last updated: November 18, 2019
Changes to Condition 3 of Ministerial Statement 953 in order to extend the Time Limit for Authorisation for substantial commencement of the proposal. Read more...Last updated: December 13, 2017
The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...Last updated: March 4, 2015
The extraction of silica sands from two new areas and the transfer of the ownership of land which contains the Muchea Limestone Communities Threatened Ecological Community to the conservation estate. Inquiry under s46 in regard to amending Ministerial Statements 703 and 920 . Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: June 23, 2006
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: May 25, 2006
The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...Last updated: July 11, 2003
The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...