Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: March 4, 2025
FutureEnergy Australia is proposing to construct and operate a biorefinery processing plant to produce a renewable biodiesel. The proposed proposal is located on Lot 31 on Plan 404104, Narrogin, within the shire of Narrogin, Western Australia. The proposal includes a biorefinery plant, a feedstock receival area, woodchip drying beds, and supporting infrastructures. The biorefinery plant will utilize waste lignocellulose biomass as feedstock which will undergo pyrolysis followed by non-catalytic... Read more...Last updated: January 21, 2025
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. The EPA considered the Study of the Cumulative Impacts of Air Emissions in the Murujuga Airshed in its assessment of the Perdaman Urea Project. Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 25, 2024
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: November 25, 2024
CSBP Limited proposes to construct and operate a new ammonia plant within the CSBP Kwinana Industrial Complex in the Kwinana Industrial Area (KIA), located approximately 40 km south of the Perth Central Business District. The proposal will use natural gas sourced from the Dampier to Bunbury Natural Gas Pipeline (DBNGP), integrated with hydrogen production from a 10 megawatt electrolyser manufacture ammonia, which will then be used by CSBP for the manufacture of other chemical products or sold... Read more...Last updated: November 25, 2024
The Proposal is for the construction and operation of a Renewable fuels processing facility that produces renewable diesel and sustainable aviation fuel from vegetable oils, animal fats and other biowaste products. The biorefinery will reuse the existing processing infrastructure formerly used for hydrocarbon refining (such as hydrofiner units, storage tanks, pipelines and utilities such as the flare and wastewater treatment plant) combined with some additional new infrastructure such as a... Read more...Last updated: November 24, 2024
Change the implementation conditions relating to greenhouse gas emissions Read more...Last updated: November 21, 2024
Proposal by the Water Corporation to renew a groundwater licence to continue abstraction from the Millstream aquifer of 6 gigalitres per annum (GL/a). The Water Corporation hold an existing temporary groundwater licence to abstract 3GL/a from the Millstream aquifer until February 2027 (GWL205069), enabling combined abstraction of up to 9GL/a. The referrer of the proposal contends that this significantly exceeds the Department of Water and Environmental Regulation’s sustainable limit of 6 GL/a,... Read more...Last updated: September 27, 2024
The proposal investigates the alternative water supplies that could be used to provide water required by future industries establishing at Kemerton. The proposal does not address the use of the water within the Kemerton Industrial Park nor any disposal or treatment of wastewater or effluent that may be required. These will be examined when individual industry development proposals are being considered. The Environmental Protection Authority has previously advised Landcorp, the estate manager,... Read more...Last updated: September 27, 2024
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: August 27, 2024
Australian Gold Reagents Pty Ltd propose to increase production at the existing Kwinana sodium cyanide liquid plant from 91,000 tonnes per annum (tpa) to a total of 110,000 tpa; and to increase production of solid sodium cyanide from 45,000 tpa up to 60,000 tpa. The proposal also includes connecting the two existing thermal combustion units to allow waste gas from either plant during down time to be directed through a combined header to the operational thermal combustion unit for effective... Read more...Last updated: July 4, 2024
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: May 21, 2024
The proposal is for a major staged expansion to Wespine's operations at the pine log sawmill, Moore Road, Dardanup. By making adjustments, replacements and additions to the existing plant and equipment and methods of operation, Wespine proposes to progressively increase the throughput of the sawmill, via a series of stages, from the current annual log input capacity of 70,000 m 3 to 400,000 m 3 over a ten year period. Major changes involved in the upgrade of the Dardanup pine log sawmill... Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: April 2, 2024
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: November 27, 2023
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: October 2, 2023
Bulletin Resources Limited are proposing a mineral exploration programme on exploration licence 74/655 within the Shire of Ravensthorpe. The proposal is within the Cocanarup Timber Reserve located to the west of the Ravensthorpe townsite. The proposal would include a total disturbance footprint of of 7 hectares for tracks and drill pads developed in two stages. Read more...