Attachment 1 to Ministerial Statement 1062 - Expand the Mine Development Envelopment (MDE) from 36,602 ha to 37,061 ha (an increase of 459 ha) to cater for the creation of three separate groundwater supplementation areas (Collectively referred to as the Groundwater Supplementation Area (GSA)). Increase the authorised extent of clearing within the Railway Development Envelope (RDE) from 2,174 ha to a revised total of 2,324 ha (an increase of 150 ha). Allow water supply for the Lower Fortescue Borefield to be abstracted from within the RDE. Change to proposal approved under s. 45c on 7 June 2023.
Attachment 2 to Ministerial Statement 1062 - Change to the existing proposal description to account for the construction and operation of power generation facilities including a solar photovoltaic (PV) farm. Change in the indicative disturbance footprint within the authorised Development Envelope. Change to proposal approved under s. 45c on 04 March 2026.

Proposal to develop and operate the Solomon Iron Ore Mine, located approximately 60 kilometres north of Tom Price, including the Southern Borefield and Lower Fortescue Borefield, and operate the existing Hamersley Rail line.
The proposal is a revision of the Solomon Iron Ore Project, the subject of Statement No. 862 dated 20 April 2011.