Solomon Iron Ore Project Expansion

Project
Proponent: 
Fortescue Metals Group Limited
Proposal description: 

Fortescue Metals Group Limited is proposing to increase the footprint and mining life of the Solomon Iron Ore Project. The proposal consists of expanding mining operations and rail infrastructure beyond the current footprint. Fortescue Metals Group Limited is also seeking approval for an external borefield to provide an additional water supply to support the expansion.

The extent of proposed ground disturbance is approximately:

  • 11,322 hectares for the mine expansion within a development envelope of 33,520 hectares;
  • 700 hectares for an additional external borefield within an development envelope of 33,712 hectares; and
  • 476 hectares for additional permanent rail infrastructure within the 29,257 hectare rail corridor envelope (which includes a spur).

The combined area of disturbance is approximately 12,498 hectares. This is in addition to the 6,297 hectares of disturbance area approved under Ministerial Statement No. 862 for the original proposal, and results in a total disturbance footprint of 18,795 hectares.

Proposal Content Document: 
PDF icon Proposal Content Document March 2026.pdf
Assessment Number: 
2019
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Iron Ore
Last updated: 
March 4, 2026
Related EPA Media Statement: 
EPA recommends approval of the Solomon Iron Ore Project - Sustaining Production: Report 1588
Current Status: 
EPA Report and Recommendations released - appeals closed
Ministerial Statement published
1. Referral
Comment on this referral: 
Solomon Iron Ore Expansion
Comment period: 
Tuesday, 29 July, 2014 to Monday, 4 August, 2014
Referral documentation: 
PDF icon CMS14233 Solomon Iron Ore Mine Expansion Referral.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assess - Public Environmental Review
Extract of determination: 
PDF icon Chairman's Determination - Solomon Iron Ore Expansion
Preliminary Environmental Factors: 
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 18 August, 2014
3. Assessment
Scoping
Environmental scoping document: 
PDF icon Environmental Scoping Document - Solomon Iron Ore Expansion
Approved: 
Friday, 12 December, 2014
Bilateral assessment (EPBC Act): 
2014/7275
Environmental Review
Public submissions: 
Monday, 14 December, 2015 to Monday, 8 February, 2016
Make a submission: 
Public Environmental Review - Solomon Iron Ore Project – Sustaining Production
Environmental Review documentation: 
PDF icon Public Environmental Review - Solomon Iron Ore Project Expansion (Part 1)
PDF icon Public Environmental Review - Solomon Iron Ore Project Expansion (Part 2)
Proponent response to submissions: 
PDF icon Public Review - Summary of Submissions
PDF icon Proponent's Response to Submissions
4. EPA Report on assessment
EPA Report Number: 
1588
EPA Report: 
PDF icon Solomon Iron Ore Project - Sustaining Production
Key Environmental Factors: 
Flora and Vegetation
Subterranean Fauna
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Wednesday, 23 November, 2016
Appeals close: 
Wednesday, 7 December, 2016
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments: 

Proposal to develop and operate the Solomon Iron Ore Mine, located approximately 60 kilometres north of Tom Price, including the Southern Borefield and Lower Fortescue Borefield, and operate the existing Hamersley Rail line.
The proposal is a revision of the Solomon Iron Ore Project, the subject of Statement No. 862 dated 20 April 2011.

Date of approval: 
Tuesday, 3 October, 2017
Ministerial Statement: 
PDF icon Ministerial Statement 1062.pdf
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Ministerial Statement 1062 - Expand the Mine Development Envelopment (MDE) from 36,602 ha to 37,061 ha (an increase of 459 ha) to cater for the creation of three separate groundwater supplementation areas (Collectively referred to as the Groundwater Supplementation Area (GSA)). Increase the authorised extent of clearing within the Railway Development Envelope (RDE) from 2,174 ha to a revised total of 2,324 ha (an increase of 150 ha). Allow water supply for the Lower Fortescue Borefield to be abstracted from within the RDE. Change to proposal approved under s. 45c on 7 June 2023.

Attachment 2 to Ministerial Statement 1062 - Change to the existing proposal description to account for the construction and operation of power generation facilities including a solar photovoltaic (PV) farm. Change in the indicative disturbance footprint within the authorised Development Envelope. Change to proposal approved under s. 45c on 04 March 2026.

Attachments: 
PDF icon Attachment 2 - Notice and Summary of Reasons.pdf
Date of approval s. 45C: 
Wednesday, 7 June, 2023
Wednesday, 4 March, 2026

Source URL:https://www.epa.wa.gov.au/proposals/solomon-iron-ore-project-expansion