Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Land use (5) Apply Land use filter
  • Gold (2) Apply Gold filter
  • Infrastructure (2) Apply Infrastructure filter
  • Oil and gas (2) Apply Oil and gas filter
  • Aquaculture (1) Apply Aquaculture filter
  • Bauxite (1) Apply Bauxite filter
  • Diamonds (1) Apply Diamonds filter
  • Lead (1) Apply Lead filter
  • Mineral sands (1) Apply Mineral sands filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Utilities (1) Apply Utilities filter
  • Waste management (1) Apply Waste management filter

Filter by current status:

  • Ministerial Statement published (9) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (4) Apply Decision on whether to assess has been published filter
  • Assessment on Proponent Information – public submission period closed (2) Apply Assessment on Proponent Information – public submission period closed filter
  • Assessment has been terminated under s40A of the EP Act (1) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (13) Apply Flora and Vegetation filter
  • Terrestrial Fauna (12) Apply Terrestrial Fauna filter
  • Terrestrial Environmental Quality (9) Apply Terrestrial Environmental Quality filter
  • Inland Waters Environmental Quality (8) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (7) Apply Hydrological Processes filter
  • 37 (5) Apply 37 filter
  • Inland Waters (5) Apply Inland Waters filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • Marine Fauna (5) Apply Marine Fauna filter
  • Subterranean Fauna (5) Apply Subterranean Fauna filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • 3144 (2) Apply 3144 filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Human Health (2) Apply Human Health filter

Filter by Proponent:

  • Marubeni Corporation and Water Corporation of Western Australia (2) Apply Marubeni Corporation and Water Corporation of Western Australia filter
  • Wesfarmers Sugar Company Pty Ltd (2) Apply Wesfarmers Sugar Company Pty Ltd filter
  • Argyle Diamond Mines Pty Ltd (1) Apply Argyle Diamond Mines Pty Ltd filter
  • Bennett Resources Pty Ltd (1) Apply Bennett Resources Pty Ltd filter
  • Black Cat (Coyote) Pty Ltd (1) Apply Black Cat (Coyote) Pty Ltd filter
  • Boskalis Australia Pty Limited (1) Apply Boskalis Australia Pty Limited filter
  • Broome International Airport Holdings (1) Apply Broome International Airport Holdings filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Kimberley Agricultural Investment Pty Ltd (1) Apply Kimberley Agricultural Investment Pty Ltd filter
  • Kimberley Marine Support Base Pty Ltd (1) Apply Kimberley Marine Support Base Pty Ltd filter
  • Kimberley Ports Authority (1) Apply Kimberley Ports Authority filter
  • Pardoo Beef Corporation Pty Ltd (1) Apply Pardoo Beef Corporation Pty Ltd filter
  • Sheffield Resources (1) Apply Sheffield Resources filter
  • Shire of Broome (1) Apply Shire of Broome filter
  • Sorby Management Pty Ltd (1) Apply Sorby Management Pty Ltd filter
  • Tassal Operations Pty Ltd (1) Apply Tassal Operations Pty Ltd filter
  • VBX Limited (1) Apply VBX Limited filter

Filter by region:

  • (-) Remove Kimberley filter Kimberley
  • Pilbara (2) Apply Pilbara filter

Filter by last updated:

  • 2025 (2) Apply 2025 filter
  • 2024 (5) Apply 2024 filter
  • 2022 (1) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2020 (2) Apply 2020 filter
  • 2018 (2) Apply 2018 filter
  • 2014 (1) Apply 2014 filter
  • 2002 (2) Apply 2002 filter
  • 2001 (1) Apply 2001 filter
  1. Home
  2. Proposal search
  3. Kimberley
  4. Social Surroundings

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Cambridge Gulf Marine Sand Proposal

Last updated: April 14, 2025

The proposal is to source marine sands from Cambridge Gulf, north of Wyndham in northeast Western Australia, for export to overseas construction projects. The proposal is a vessel-based marine operation with a lifespan of up to 15 years. It does not involve the construction and operation of any shore-based facilities. The operation will involve a Sand Production Vessel (SPV) based generally on the design of a large Trailer Suction Hopper Dredger (TSHD). The proposed operational area (POA) is... Read more...

Ocean Barramundi Expansion Project

Last updated: April 9, 2025

Tassal propose to expand its barramundi farm operations to 7 sites spread across the Buccaneer Archipelago, in the Kimberley region. The proposed expansion will be staged over a 10-year period. Read more...

Sorby Hills Silver Lead Zinc Project

Last updated: December 18, 2024

The proposal is to develop a silver, lead and zinc mine, associated infrastructure and processing facilities approximately 50 kilometres north of Kununurra, with the concentrate produced transported by road and shipped through Wyndham Port. Read more...

Telfer - Havieron Gold Mining Project

Last updated: December 5, 2024

Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station,... Read more...

Valhalla Gas Exploration and Appraisal Program

Last updated: October 7, 2024

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Coyote Gold Mine – Stage 2 (Sandpiper and Kookaburra Open Pits and Haul Road) 280km South-East of Halls Creek

Last updated: February 23, 2024

The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...

Broome Regional Resource Recovery Park – Landfill Development

Last updated: January 29, 2024

The Shire of Broome propose to develop a Class III landfill, leachate management system and asbestos monocell at the Regional Resource Recovery Park (RRRP). The RRRP is located at Lot 550 on the Broome-Cape Leveque Rd, 12km northeast of the Broome town centre. Read more...

Thunderbird Mineral Sands Project

Last updated: November 8, 2022

Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...

Carlton Plain - Stage 1

Last updated: September 1, 2021

Kimberley Agricultural Investment (KAI) Pty Ltd proposes to develop 3086 hectares of land for the purposes of perennial and annual cropping, including grains, cotton and horticulture (which may include citrus and/or mango trees or other tree crops). The proposal is located between House Roof Hill and the Ord River, approximately 40 kilometres north-west of Kununurra, in the Shire of Wyndham-East Kimberley. Carlton Plains Stage 1 forms the initial component of the staged development of four... Read more...

Wuudagu Bauxite Project

Last updated: June 9, 2021

VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...

EP371 Laurel Gas Exploration and Appraisal Program

Last updated: December 2, 2020

Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...

Kimberley Marine Offloading Facility

Last updated: July 24, 2020

Kimberley Marine Support Base Pty Ltd (KMSB) are proposing to develop the Kimberley Marine Offloading Facility at the Port of Broome, approximately 200 metres south of the existing Broome Wharf. The proposal includes construction and operation of a deep-water floating wharf, along with associated onshore hardstand and terminal facilities suitable for container and general cargo stevedoring for coastal trading vessels, berthing and mooring for Cruise vessels and Roll on/Roll off ships.... Read more...

Pardoo Irrigated Agriculture Project – Stage 3

Last updated: July 25, 2018

Pardoo Beef Corporation Pty Ltd proposes to develop a centre-pivot irrigated feed crop production facility. Centre-pivot irrigation is a method of crop irrigation in which equipment rotates around a pivot and crops are watered with sprinklers. The proposal is approximately 100km east-northeast of Port Hedland and 365km south west of Broome. The proposal is for stage 3 and would include a total disturbance of 368 hectares development envelope. Read more...

Port of Broome Channel Optimisation Project

Last updated: May 14, 2018

Kimberley Ports Authority (KPA) is seeking to improve accessibility to the Port of Broome, situated in West Roebuck Bay, approximately 5 kilometres south west of the township of Broome. Larger vessels entering the Port, such as cruise ships, have limited access windows due to the large tidal range (10m), presence of channel rock and high spots (shoals) in the access channel. In recognition of the access constraints and the growing tourism industry in Broome, the Department of Primary Industries... Read more...

Argyle Diamond Mine - Underground Project 110 km south of Kununurra, East Kimberley

Last updated: April 17, 2014

To extend the current Argyle Diamond Mine Operations at Argyle Diamond Mine to develop an underground diamond mine and associated infrastructure. Read more...

Ord River Irrigation Area Stage 2 (M2 Supply Channel), Kununurra - Management

Last updated: February 6, 2002

The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the management component. See... Read more...

Ord River Irrigation Area Stage 2 (M2 Supply Channel), Kununurra - Biodiversity

Last updated: February 6, 2002

The proposal is to develop a raw sugar industry on the Weaber, Keep River and Knox Creek Plains. The M2 Project is located near Kununurra within the Victoria-Bonaparte Biogeographic Region and the project area extends over approximately 76,000 ha of land comprising the Weaber, Keep River and Knox Creek Plains, and involves approximately equal areas within WA and the NT. The proposal has been assessed in two parts: biodiversity and management. This assessment is of the biodiversity. See here for... Read more...

Relocation of Broome International Airport

Last updated: November 14, 2001

The proposed airport will be located in a site approximately 12 km north-east of Broome townsite. The proposal involves the construction of one main runway, parallel taxiway, turning nodes, apron parking, general aviation parking, maintenance and storage hangers and fuel storage. It also includes domestic and international terminals, land-side and airside commercial activities and a short future parallel runway for light aircraft. Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.