Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (8) Apply Iron Ore filter
  • Infrastructure (5) Apply Infrastructure filter
  • Industrial (3) Apply Industrial filter
  • Gold (1) Apply Gold filter
  • Oil and gas (1) Apply Oil and gas filter
  • Power generation (1) Apply Power generation filter

Filter by current status:

  • (-) Remove Ministerial Statement published filter Ministerial Statement published

Filter by relevant environmental factors:

  • (-) Remove Landforms filter Landforms
  • Flora and Vegetation (11) Apply Flora and Vegetation filter
  • Terrestrial Fauna (9) Apply Terrestrial Fauna filter
  • Social Surroundings (7) Apply Social Surroundings filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (6) Apply Inland Waters Environmental Quality filter
  • 37 (3) Apply 37 filter
  • Benthic Communities and Habitats (3) Apply Benthic Communities and Habitats filter
  • Marine Fauna (2) Apply Marine Fauna filter
  • Subterranean Fauna (2) Apply Subterranean Fauna filter
  • Inland Waters (1) Apply Inland Waters filter

Filter by Proponent:

  • BHP Billiton Iron Ore Pty Ltd (2) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (2) Apply Hamersley Iron Pty Limited filter
  • Robe River Mining Company Pty Ltd (2) Apply Robe River Mining Company Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • BHP Iron Ore (Jimblebar) Pty Ltd (1) Apply BHP Iron Ore (Jimblebar) Pty Ltd filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Greatland Pty Ltd (1) Apply Greatland Pty Ltd filter
  • Methanex Corporation (1) Apply Methanex Corporation filter
  • Pilbara Energy Limited (1) Apply Pilbara Energy Limited filter
  • SubSea International Australia Inc (1) Apply SubSea International Australia Inc filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2020 (2) Apply 2020 filter
  • 2016 (1) Apply 2016 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (2) Apply 2013 filter
  • 2008 (1) Apply 2008 filter
  • 2002 (2) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  • 1998 (1) Apply 1998 filter
  • 1997 (2) Apply 1997 filter
  • 1994 (1) Apply 1994 filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Landforms
  5. Ministerial Statement published

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Telfer Project, Expansion of Telfer Gold Mine, Great Sandy Desert

Last updated: September 16, 2020

This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...

Balla Balla Magnetite Mining Project (S46) [2224]

Last updated: May 27, 2020

Changes to conditions 3-1 and 3-2, time limit of authorisation of Ministerial Statement 985 in order to extend the Time Limit of Authorisation. Read more...

Marillana Creek (Yandi) Life of Mine Proposal, Mining Leases 270SA and 47/292, 90 km north-west of Newman

Last updated: May 4, 2016

Life-of-mine proposal to mine iron ore within Mining Leases 270SA and 47/292 at a rate of approximately 45 million tonnes per annum, and subsequent rehabilitation and decommissioning of the site. Read more...

Orebody 18 Iron Ore Mine (s. 46)

Last updated: August 7, 2015

The Minister for Environment requested the EPA inquire into the matter of changing the implementation conditions relating to the Orebody 18 Iron Ore Mine proposal, particularly the matter of setting a condition on the proposal that would require environmental offsets for the clearing of native vegetation. Inquiry under s46 relating to Ministerial Statement 439 and EPA Report 840 . Read more...

Mesa A / Warramboo Iron Ore Project

Last updated: March 27, 2013

The proposal is to mine iron ore at Mesa A / Warramboo in the Robe Valley, Pilbara. The proposal involves the development of mine pits at Mesa A and Warramboo; a primary sizer processing plant; associated mine infrastructure; and the construction of a rail line to link into existing Mesa J mining operations., Note:, Also see Mesa A / Warramboo Iron Ore Project (s43) Read more...

Mesa A / Warramboo Iron Ore Project (s43)

Last updated: March 27, 2013

Proposal by Robe River Mining Company Pty Ltd to mine iron ore at Mesa A/Warramboo. This report has been prepared in response to a request from the Minister under section 43(1) of the, Environmental Protection Act 1986, (EP Act) that the EPA re-assess the proposal in the light of additional information provided by the proponent. Read more...

Brockman Syncline 4 Iron Ore Project

Last updated: December 17, 2008

The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...

Methanol Complex, Burrup Peninsula

Last updated: December 20, 2002

Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

Nammuldi—Silvergrass Iron Ore Project, 55 km north-west of Tom Price

Last updated: November 28, 2000

The proposal is to develop two iron ore deposits (Nammuldi and Silvergrass) near Hamersley Iron Pty Limited’s current Brockman No. 2 iron ore mine, 65 kilometres north-west of Tom Price. Read more...

Second offshore trunkline and DOMGAS debottlenecking, North West Shelf

Last updated: July 14, 1998

The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...

Jimblebar Rationalisation and Planned Expansion, Formerly McCamey's Monster Iron Ore Mining Proposal (s46) [917]

Last updated: August 13, 1997

Proposed expansion of the Jimblebar iron ore mine (formerly known as McCamey’s Monster). The proposal by BHP Iron Ore (Jimblebar) Pty Ltd (the proponent) involves an increase in the mining rate from five to eight million tonnes per annum, and the expansion of both the scree and bedrock mining areas. Read more...

Pipeline fabrication site within Mardie Station Pastoral Lease

Last updated: July 14, 1997

The proposal is to construct a pipeline fabrication site within the exrstmg Mardie Station Pastoral lease and existing Vacant Crown Land Reserve, approximately 45km south west of Dampier and 15km east of Cape Preston is detailed in the CER. Read more...

Pilbara Energy Project, Karatha Port Hedland and Newman

Last updated: January 6, 1994

The proposal is to establish an energy infrastructure in the Pilbara region of Western Australia. This proposal will provide natural gas and electric power for future industrial developments and includes: a 215 kilometre buried gas pipeline from Karratha to Port Hedland; a gas turbine power station at Port Hedland; approximately 400 kilometres of high-voltage power transmission line from Port Hedland to Newman; a back-up generating plant at Newman; and closure of the existing diesel powered... Read more...

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.