Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (19) Apply Infrastructure filter
  • Oil and gas (11) Apply Oil and gas filter
  • Iron Ore (8) Apply Iron Ore filter
  • Salt (8) Apply Salt filter
  • Industrial (5) Apply Industrial filter
  • Aquaculture (1) Apply Aquaculture filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter

Filter by current status:

  • Ministerial Statement published (28) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (9) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Environmental Review document open for public submissions (1) Apply Environmental Review document open for public submissions filter
  • Environmental Scoping Document approved (1) Apply Environmental Scoping Document approved filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter

Filter by relevant environmental factors:

  • (-) Remove Marine Fauna filter Marine Fauna
  • Benthic Communities and Habitats (33) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (30) Apply Marine Environmental Quality filter
  • Flora and Vegetation (26) Apply Flora and Vegetation filter
  • Social Surroundings (22) Apply Social Surroundings filter
  • Terrestrial Fauna (21) Apply Terrestrial Fauna filter
  • Coastal Processes (12) Apply Coastal Processes filter
  • 37 (9) Apply 37 filter
  • Inland Waters (9) Apply Inland Waters filter
  • Terrestrial Environmental Quality (8) Apply Terrestrial Environmental Quality filter
  • Inland Waters Environmental Quality (6) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (5) Apply Hydrological Processes filter
  • Subterranean Fauna (5) Apply Subterranean Fauna filter
  • 3144 (3) Apply 3144 filter
  • Landforms (3) Apply Landforms filter
  • Human Health (1) Apply Human Health filter

Filter by Proponent:

  • Chevron Australia Pty Ltd (5) Apply Chevron Australia Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (4) Apply Leichhardt Industrials Pty Ltd filter
  • Mardie Minerals Pty Ltd (3) Apply Mardie Minerals Pty Ltd filter
  • Forge Resources Swan Pty Ltd (2) Apply Forge Resources Swan Pty Ltd filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • Onslow Salt Pty Ltd (2) Apply Onslow Salt Pty Ltd filter
  • Woodside Energy Ltd (2) Apply Woodside Energy Ltd filter
  • Apache Northwest Pty Ltd (1) Apply Apache Northwest Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • API Management Pty Ltd (1) Apply API Management Pty Ltd filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Australian United Steel Industry Pty Limited (1) Apply Australian United Steel Industry Pty Limited filter
  • BHP Billiton Iron Ore (1) Apply BHP Billiton Iron Ore filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Chevron Australia Pty Ltd (for original proposal) (1) Apply Chevron Australia Pty Ltd (for original proposal) filter
  • Department of Transport (1) Apply Department of Transport filter
  • K + S Salt Australia Pty Ltd (1) Apply K + S Salt Australia Pty Ltd filter
  • Korean Steel Pty Ltd (1) Apply Korean Steel Pty Ltd filter
  • Onslow Infraco Pty Ltd (1) Apply Onslow Infraco Pty Ltd filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Robe River Iron Associates (1) Apply Robe River Iron Associates filter
  • Shire of Ashburton (1) Apply Shire of Ashburton filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (1) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • West Australian Petroleum Pty Ltd (1) Apply West Australian Petroleum Pty Ltd filter
  • Z1Z Resorts Pty Ltd (1) Apply Z1Z Resorts Pty Ltd filter

Filter by region:

  • (-) Remove Pilbara filter Pilbara

Filter by last updated:

  • 2025 (6) Apply 2025 filter
  • 2024 (6) Apply 2024 filter
  • 2023 (4) Apply 2023 filter
  • 2022 (3) Apply 2022 filter
  • 2021 (2) Apply 2021 filter
  • 2020 (4) Apply 2020 filter
  • 2019 (2) Apply 2019 filter
  • 2018 (2) Apply 2018 filter
  • 2015 (1) Apply 2015 filter
  • 2013 (3) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2008 (1) Apply 2008 filter
  • 2007 (1) Apply 2007 filter
  • 2002 (1) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  • 1998 (1) Apply 1998 filter
  • 1996 (1) Apply 1996 filter
  • 1995 (1) Apply 1995 filter
  • 1991 (1) Apply 1991 filter
  1. Home
  2. Proposal search
  3. Pilbara
  4. Marine Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Eramurra Industrial Salt Project

Last updated: August 9, 2021

Leichhardt Industrials Pty Ltd (Leichhardt) is seeking to develop a salt production and export operation in the Cape Preston East area, approximately 55 kilometres (km) westsouth-west of Karratha in Western Australia (WA). The proposal will utilise seawater and evaporation to produce concentrated salt products for export. The proposal includes the development of a series of concentrator and crystalliser ponds, processing plant, product pipeline and offshore export facility (offshore pylon wharf... Read more...

Asian Renewable Energy Hub Revised Proposal

Last updated: November 9, 2020

NW Interconnected Power Pty Ltd (the Proponent) is seeking to revise its approved proposal to develop the Asian Renewable Energy Hub.  The proposal was previously referred under section 38 of the Environmental Protection Act 1986 (EP Act), assessed by the Environmental Protection Authority (EPA) at the level of Public Environmental Review (PER) (NW Interconnected Power 2019), and subsequently approved by the Western Australian Minister for Environment in October 2020.   This referral is for ... Read more...

Cape Preston East Iron Ore Export Facility (s46) [2183]

Last updated: August 6, 2020

Change to Extension of Timeframe for substantial commencement. Read more...

Port Hedland Spoilbank Marina

Last updated: April 20, 2020

The Department of Transport is proposing to construct and operate the Port Hedland Spoilbank Marina Proposal, including marine and land-based components within the Town of Port Hedland, Pilbara, WA. The Proposal includes: marina basin, mooring facilities (up to 80 pens), boat launching area, sand trap and entrance channel capital dredging works resulting in up to 900,000 cubic metres (m3) of dredge spoil and dredged to a maximum depth of -2m chart datum (-6m AHD). Dredge spoil will be used... Read more...

Balla Balla Export Facilities (s46) [2220]

Last updated: January 20, 2020

The Minister for Environment has requested that the Environmental Protection Authority (EPA) inquire into and report on the matter of changing the implementation conditions in Ministerial Statement 945 relating to Forge Resources Swan Pty Ltd’s Balla Balla Export Facilities proposal. Read more...

Learmonth Bundle Site

Last updated: May 15, 2019

Subsea 7 proposes to construct and operate an onshore pipeline fabrication facility at Lots 233 and 1586 to the east of Minilya-Exmouth Road, Learmonth, approximately 35km south of the Exmouth Townsite. A pipeline bundle co-locates a number of services within a single pipeline for use in the development of offshore gas fields. The proposal consists of an onshore pipeline bundle fabrication site and associated infrastructure, two bundle tracks (approximately 10km in length) along which the... Read more...

Onslow Marine Support Base Stage 2 Capital Dredging

Last updated: March 6, 2019

Onslow Marine Support Base Pty Ltd is proposing to modify and extend the Beadon Creek harbour approach channel, turning basin and berth pocket as part of Stage 2 of the Onslow Marine Support Base (OMSB) proposal. The proposed capital dredging will enable offshore supply vessels to access the newly constructed OMSB land-backed wharf facility (Stage 1) within the Beadon Creek Maritime Facility. 930,000 cubic metres of dredge material will be disposed of onshore to a 44 hectare Dredge material... Read more...

Cape Preston East – Multi-Commodity Export Facility

Last updated: November 12, 2018

The proposal is to construct and operate an iron ore export facility at Cape Preston East in the Pilbara region of WA. Read more...

Anketell Point Port Development (s46) [2162]

Last updated: May 14, 2018

Section 46 extension to the Time Limit for Authorisation for substantial commencement. Read more...

Gorgon Gas Development Fourth Train Expansion Proposal

Last updated: April 30, 2015

To expand the liquefied natural gas (LNG) production capacity of the existing proposal from 15 million tonnes per annum (Mtpa) to 20 Mtpa (nominal). Read more...

Varanus Island Compression Project

Last updated: March 18, 2013

Apache Northwest Pty Ltd propose to extend their infrastructure on Varanus Island. This project involves the installation of two Solar Mars 100 gas turbine compressors, Centaur 40 power generator, pipe rack, equipment room, as well as supporting infrastructure and services including accommodation camp upgrade, wharf upgrades, construction of a kitchen/mess cyclone refuge, upgrade of concrete batching plant and bulk earthworks. Read more...

Onslow Solar Salt Project (s46)

Last updated: February 12, 2013

Inquiry under s46 regarding proposed amendments to the Onslow Solar Salt Project, the subject of  Ministerial Statement 401 . The changes to the project are to allow the start-up production to increase from 1.5 Mtpa to 2.5 Mtpa. Modifications proposed include: expansion of condenser pond area from 70 km 2 to 80 km 2 ; expansion of the crystalliser pond area from 7.2 km 2 to 8.2 km 2 ; area for storage of bitterns; extension of the jetty structure by 300 m; extension of the dredged approach... Read more...

Anketell Point Port Development, Antonymyre, Shire of Roebourne

Last updated: January 30, 2013

The proposal is to construct and operate a multi-user deep-water port with iron ore stockpiling, transfer and ship loading facilities and ancillary infrastructure at Anketell Point. The proposal allows for facilities required by the Proponent and future third parties to be developed. Read more...

Port Hedland Outer Harbour Development

Last updated: February 28, 2012

The proposal is to construct and operate the Outer Harbour Development which includes landside and marine infrastructure for the handling and export of iron ore from BHPBIO’s operations. The Boodarie stockyard infrastructure will supply an overland conveyor to a transfer pad located to the west of the existing Finucane Island facilities. A piled jetty will transfer ore material to the ship loaders located at the piled wharf. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Materials Stockpiling and Handling Facilities, Cape Preston

Last updated: March 20, 2008

The proposal is to establish materials stockpiling and handling facilities with a capacity of approximately 4 million tonnes at Cape Preston, approximately 60km west-south-west of Dampier. Read more...

Dredging Program for the Cape Lambert Port Upgrade

Last updated: July 12, 2007

A capital and maintenance dredging program to remove up to 2.5 million cubic metres of marine sediment from within State Waters adjacent to Cape Lambert, and disposal of up to 2 million cubic metres of uncontaminated dredge material to Spoil Ground 1. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

North West Shelf Gas Project Additional Liquefied Natural Gas LNG facilities

Last updated: February 11, 2000

Woodside Energy Limited proposes to construct and operate additional Liquefied Natural Gas (LNG) processing trains, the current proposal being for two trains with a total additional capacity of 8 Mtpa at its onshore gas plant on the Burrup. Read more...

Second offshore trunkline and DOMGAS debottlenecking, North West Shelf

Last updated: July 14, 1998

The Proposal is to install a second undersea gas trunk line from the existing offshore Goodwin/North Rankin production platforms to a new terminal located in the existing onshore treatment plant at Withnell Bay on the Burrup Peninsula. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.