Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (12) Apply Infrastructure filter
  • Iron Ore (6) Apply Iron Ore filter
  • Waste management (6) Apply Waste management filter
  • Oil and gas (3) Apply Oil and gas filter
  • Mineral sands (2) Apply Mineral sands filter
  • Power generation (2) Apply Power generation filter
  • Utilities (2) Apply Utilities filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Land use (1) Apply Land use filter
  • Salt (1) Apply Salt filter

Filter by current status:

  • Ministerial Statement published (22) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (7) Apply Decision on whether to assess has been published filter
  • Assessment has been terminated under s40A of the EP Act (4) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - appeals closed (2) Apply EPA Report and Recommendations released - appeals closed filter

Filter by relevant environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (25) Apply Flora and Vegetation filter
  • Terrestrial Fauna (21) Apply Terrestrial Fauna filter
  • Inland Waters (17) Apply Inland Waters filter
  • 37 (13) Apply 37 filter
  • Subterranean Fauna (9) Apply Subterranean Fauna filter
  • 3144 (7) Apply 3144 filter
  • Terrestrial Environmental Quality (6) Apply Terrestrial Environmental Quality filter
  • Benthic Communities and Habitats (5) Apply Benthic Communities and Habitats filter
  • Marine Environmental Quality (5) Apply Marine Environmental Quality filter
  • Hydrological Processes (4) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (4) Apply Inland Waters Environmental Quality filter
  • Marine Fauna (4) Apply Marine Fauna filter
  • Coastal Processes (2) Apply Coastal Processes filter
  • Landforms (2) Apply Landforms filter
  • Human Health (1) Apply Human Health filter

Filter by Proponent:

  • BHP Iron Ore Pty Ltd (2) Apply BHP Iron Ore Pty Ltd filter
  • Eastern Metropolitan Regional Council (2) Apply Eastern Metropolitan Regional Council filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Roy Hill Infrastructure Pty Ltd (2) Apply Roy Hill Infrastructure Pty Ltd filter
  • • Port Hedland Waste to Energy and Materials Recovery Facility (Ministerial Statement 935); Resource Recovery Facility Red Hill (976); East Rockingham Waste to Energy and Materials Recovery Facility (994); Kwinana Waste to Energy Project (1016) (1) Apply • Port Hedland Waste to Energy and Materials Recovery Facility (Ministerial Statement 935); Resource Recovery Facility Red Hill (976); East Rockingham Waste to Energy and Materials Recovery Facility (994); Kwinana Waste to Energy Project (1016) filter
  • AGI Development Group Nominees Pty Ltd (AGID) (1) Apply AGI Development Group Nominees Pty Ltd (AGID) filter
  • Alkina Holdings Pty Ltd (1) Apply Alkina Holdings Pty Ltd filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • Beach Energy Limited (1) Apply Beach Energy Limited filter
  • Cleanaway Solid Waste Pty Ltd (1) Apply Cleanaway Solid Waste Pty Ltd filter
  • Conservation and Parks Commission (1) Apply Conservation and Parks Commission filter
  • Fortescue Metals Group Ltd (1) Apply Fortescue Metals Group Ltd filter
  • Gunson Resources Limited (1) Apply Gunson Resources Limited filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Keysbrook Leucoxene Pty Ltd (1) Apply Keysbrook Leucoxene Pty Ltd filter
  • Main Roads (1) Apply Main Roads filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Minister for State Development (1) Apply Minister for State Development filter
  • North West Infrastructure (1) Apply North West Infrastructure filter
  • NWIOA Ops. Pty Ltd (trading as North West Infrastructure) (1) Apply NWIOA Ops. Pty Ltd (trading as North West Infrastructure) filter
  • Onslow Iron Pty Ltd and API Management Pty Limited (1) Apply Onslow Iron Pty Ltd and API Management Pty Limited filter
  • Pilbara Energy (Generation) Pty Ltd (1) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Transfield Services Kemerton Pty Limited (as trustee for Transfield Services Kemerton Trust) (1) Apply Transfield Services Kemerton Pty Limited (as trustee for Transfield Services Kemerton Trust) filter
  • Water Corporation (1) Apply Water Corporation filter
  • Woodside Energy Technologies Pty Ltd (1) Apply Woodside Energy Technologies Pty Ltd filter
  • Z1Z Resorts Pty Ltd (1) Apply Z1Z Resorts Pty Ltd filter

Filter by region:

  • Pilbara (16) Apply Pilbara filter
  • Perth (9) Apply Perth filter
  • South West (5) Apply South West filter
  • Mid West (2) Apply Mid West filter
  • Gascoyne (1) Apply Gascoyne filter
  • Peel (1) Apply Peel filter
  • Wheatbelt (1) Apply Wheatbelt filter

Filter by last updated:

  • (-) Remove 2023 filter 2023
  1. Home
  2. Proposal search
  3. Social Surroundings
  4. 2023

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Multi-user Iron Ore Export (Landside) Facility, Port Hedland (s. 46)

Last updated: July 31, 2023

The proposal is to construct and operate port infrastructure which includes a stockyard facility, rail loop, conveyor, wharf and ship-loading facility at Port Hedland. Inquiry under s46 in response to a request to change condition 3 - Time Limit for Proposal Implementation of Ministerial Statement 891 . This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Roy Hill 1 Iron Ore Project, Port Infrastructure – Ministerial Statement 858 (s46) [2145]

Last updated: July 31, 2023

This proposal has been superseded by the Roy Hill Port Expansion Project . Read more...

Manuwarra Red Dog Highway – Revised Proposal

Last updated: July 4, 2023

In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...

Great Northern Highway – Bindoon Bypass

Last updated: June 26, 2023

The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...

Thornlie-Cockburn Link

Last updated: June 22, 2023

The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...

H2Perth

Last updated: June 19, 2023

Woodside Energy Technologies Pty Ltd propose to construct and operate H2Perth, a domestic and export scale hydrogen and ammonia production facility, located approximately 40 km south of Perth. The proposal is to be located primarily within the Rockingham Industrial Zone (RIZ) in the City of Rockingham, with elements also located within the City of Kwinana and on the multi-user Kwinana Bulk Jetty. The proposal would produce approximately 3250 megawatts of gaseous hydrogen and approximately 3.25... Read more...

West Pilbara Iron Ore Project – Stage 1 Mine Area (S46) [2351 ]

Last updated: June 16, 2023

The requested change relates to condition 3 of Statement 1027 for an extension to the time limit for proposal implementation. Read more...

Kemerton Wastewater Treatment Plant (s46) [2332]

Last updated: June 14, 2023

Remove Condition 2 (Proponent Commitments) if the proponent commitments in schedule 2 have been completed, are no longer relevant to the proposal or can be managed under Part V of the Environmental Protection Act 1986 (EP Act)., The EPA, in response to a request by the Water Corporation and pursuant to s40A of the EP Act, has terminated the inquiry under s46 of the EP Act into changing the implementation conditions of Ministerial Statement 568 Read more...

Zemira 3D Seismic Survey

Last updated: June 2, 2023

The proposal is to undertake an onshore three-dimensional (3D) seismic survey in the northern Perth Basin. The survey area is about 300 kilometres (km) north of Perth, and its nearest boundary is about 4.5 km north of the town of Eneabba and about 25 km southeast of the town of Dongara. The survey area is situated within four local shires: Shire of Irwin, Shire of Three Springs, Shire of Mingenew and Shire of Carnamah. The intent of the Zemira 3D Seismic Survey is to collect a high-quality 3D... Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (S46) [2364]

Last updated: May 29, 2023

Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...

Great Southern Landfill at Allawuna Farm Lots 4869, 5931, 9926 and 26934 Great Southern Highway, St Ronans

Last updated: May 22, 2023

The proposal involves the construction and use of a landfill and associated infrastructure for receiving Class II and III waste of 150,000 to 250,000 tonnes per annum (tpa) over a period of 20 years. The proposal is located at Allawuna Farm, St Ronans, within the Shire of York. Read more...

Bunbury Outer Ring Road (Northern and Central Sections)

Last updated: May 10, 2023

The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation and... Read more...

Dampier Seawater Desalination Plant (DSDP)

Last updated: April 11, 2023

The proponent (Hamersley Iron Pty Limited) proposes to build and develop a desalination plant at Parker Point, Dampier, located approximately 2.5km north-east of the Dampier township. This Proposal will establish a reliable potable water supply for the Proponent’s Dampier port operation (including Parker Point and East Intercourse Island), Dampier town and connection into Water Corporation’s West Pilbara Water Supply Scheme (WPWSS). The desalination plant may be delivered in stages up to a... Read more...

Bunbury Outer Ring Road (Southern Section)

Last updated: February 15, 2023

Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...

Yardie Creek Road Realignment Project

Last updated: January 18, 2023

The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.