Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (52) Apply Infrastructure filter
  • Iron Ore (43) Apply Iron Ore filter
  • Land use (20) Apply Land use filter
  • Sand, rock, gravel and clay (13) Apply Sand, rock, gravel and clay filter
  • Mineral sands (8) Apply Mineral sands filter
  • Industrial (7) Apply Industrial filter
  • Gold (5) Apply Gold filter
  • Uranium (5) Apply Uranium filter
  • Clearing (4) Apply Clearing filter
  • Salt (3) Apply Salt filter
  • Nickel (2) Apply Nickel filter
  • Oil and gas (2) Apply Oil and gas filter
  • Power generation (2) Apply Power generation filter
  • Waste management (2) Apply Waste management filter
  • Copper (1) Apply Copper filter
  • Diamonds (1) Apply Diamonds filter
  • Molybdenum (1) Apply Molybdenum filter
  • Rare earth elements (1) Apply Rare earth elements filter

Filter by current status:

  • Ministerial Statement published (118) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (16) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (5) Apply Minister determined that the proposal should not be implemented filter
  • Assessment has been terminated under s40A of the EP Act (4) Apply Assessment has been terminated under s40A of the EP Act filter
  • Awaiting Ministerial decision (3) Apply Awaiting Ministerial decision filter
  • Ministerial Statement withdrawn under s.47A (3) Apply Ministerial Statement withdrawn under s.47A filter
  • EPA Report and Recommendations released - appeals closed (2) Apply EPA Report and Recommendations released - appeals closed filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter
  • Waiting for Minister to reject proposal under s45(8) (1) Apply Waiting for Minister to reject proposal under s45(8) filter

Filter by preliminary environmental factors:

  • (-) Remove Inland Waters Environmental Quality filter Inland Waters Environmental Quality
  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (142) Apply Flora and Vegetation filter
  • Hydrological Processes (119) Apply Hydrological Processes filter
  • Social Surroundings (76) Apply Social Surroundings filter
  • Terrestrial Environmental Quality (53) Apply Terrestrial Environmental Quality filter
  • 37 (37) Apply 37 filter
  • Subterranean Fauna (36) Apply Subterranean Fauna filter
  • Marine Environmental Quality (14) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (9) Apply Benthic Communities and Habitats filter
  • Landforms (9) Apply Landforms filter
  • Coastal Processes (8) Apply Coastal Processes filter
  • Human Health (8) Apply Human Health filter
  • Marine Fauna (7) Apply Marine Fauna filter
  • People (6) Apply People filter
  • Water (1) Apply Water filter

Filter by Proponent:

  • Fortescue Metals Group Limited (7) Apply Fortescue Metals Group Limited filter
  • BHP Billiton Iron Ore Pty Ltd (6) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Main Roads Western Australia (4) Apply Main Roads Western Australia filter
  • API Management Pty Limited (3) Apply API Management Pty Limited filter
  • Main Roads WA (3) Apply Main Roads WA filter
  • Robe River Mining Co. Pty. Ltd (3) Apply Robe River Mining Co. Pty. Ltd filter
  • Water Corporation (3) Apply Water Corporation filter
  • Cable Sands (WA) Pty Ltd (2) Apply Cable Sands (WA) Pty Ltd filter
  • Cameco Australia Pty Ltd (2) Apply Cameco Australia Pty Ltd filter
  • Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited (2) Apply Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Limited filter
  • Fortescue Metals Group Ltd (2) Apply Fortescue Metals Group Ltd filter
  • Grange Resources Limited (2) Apply Grange Resources Limited filter
  • Kemerton Silica Sand Pty Ltd (2) Apply Kemerton Silica Sand Pty Ltd filter
  • Marubeni Corporation and Water Corporation of Western Australia (2) Apply Marubeni Corporation and Water Corporation of Western Australia filter
  • Oakajee Port and Rail Pty Ltd (2) Apply Oakajee Port and Rail Pty Ltd filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Toro Energy Limited (2) Apply Toro Energy Limited filter
  • Wesfarmers Sugar Company Pty Ltd (2) Apply Wesfarmers Sugar Company Pty Ltd filter
  • Brockman Iron Pty Ltd (1) Apply Brockman Iron Pty Ltd filter
  • Canal Rocks Pty Ltd (1) Apply Canal Rocks Pty Ltd filter
  • Cape Bouvard Investments Pty Ltd (1) Apply Cape Bouvard Investments Pty Ltd filter
  • City of Armadale (1) Apply City of Armadale filter
  • Conservation Commission of Western Australia (1) Apply Conservation Commission of Western Australia filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • CSR Gyprock Fibre Cement (1) Apply CSR Gyprock Fibre Cement filter
  • Doral Mineral Sands Pty Ltd (1) Apply Doral Mineral Sands Pty Ltd filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Fortescue Metals Group (1) Apply Fortescue Metals Group filter
  • GINDALBIE METALS LTD (1) Apply GINDALBIE METALS LTD filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hamersley Iron Pty Ltd (1) Apply Hamersley Iron Pty Ltd filter
  • Hope Downs Management Services Pty Ltd (1) Apply Hope Downs Management Services Pty Ltd filter
  • Image Resources NL (1) Apply Image Resources NL filter
  • Iron Ore Holdings Ltd (1) Apply Iron Ore Holdings Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Macarthur Minerals Limited (1) Apply Macarthur Minerals Limited filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Polaris Metals Pty Ltd (1) Apply Polaris Metals Pty Ltd filter
  • Port Hedland Port Authority (1) Apply Port Hedland Port Authority filter
  • Rio Tinto Pty Ltd (1) Apply Rio Tinto Pty Ltd filter
  • Shire of Manjimup (1) Apply Shire of Manjimup filter
  • St Ives Gold Mining Company Pty Limited (1) Apply St Ives Gold Mining Company Pty Limited filter
  • Tellus Holdings Ltd (1) Apply Tellus Holdings Ltd filter
  • The Minister for State Development (1) Apply The Minister for State Development filter
  • Tronox Management Pty Ltd (1) Apply Tronox Management Pty Ltd filter
  • Urban Resources Pty Ltd (1) Apply Urban Resources Pty Ltd filter
  • Vimy Resources Limited (1) Apply Vimy Resources Limited filter
  • Western Australian Planning Commission (1) Apply Western Australian Planning Commission filter

Filter by region:

  • Pilbara (52) Apply Pilbara filter
  • Perth (34) Apply Perth filter
  • South West (16) Apply South West filter
  • Mid West (12) Apply Mid West filter
  • Kimberley (11) Apply Kimberley filter
  • Goldfields Esperance (8) Apply Goldfields Esperance filter
  • Wheatbelt (7) Apply Wheatbelt filter
  • Great Southern (6) Apply Great Southern filter
  • Peel (6) Apply Peel filter
  • Gascoyne (3) Apply Gascoyne filter

Filter by last updated:

  • 2025 (5) Apply 2025 filter
  • 2024 (12) Apply 2024 filter
  • 2023 (4) Apply 2023 filter
  • 2022 (2) Apply 2022 filter
  • 2021 (10) Apply 2021 filter
  • 2020 (6) Apply 2020 filter
  • 2019 (11) Apply 2019 filter
  • 2018 (7) Apply 2018 filter
  • 2017 (9) Apply 2017 filter
  • 2016 (13) Apply 2016 filter
  • 2015 (8) Apply 2015 filter
  • 2014 (7) Apply 2014 filter
  • 2013 (11) Apply 2013 filter
  • 2012 (5) Apply 2012 filter
  • 2011 (9) Apply 2011 filter
  • 2010 (4) Apply 2010 filter
  • 2009 (3) Apply 2009 filter
  • 2007 (1) Apply 2007 filter
  • 2006 (3) Apply 2006 filter
  • 2005 (4) Apply 2005 filter
  • 2004 (2) Apply 2004 filter
  • 2003 (2) Apply 2003 filter
  • 2002 (7) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  • 1999 (2) Apply 1999 filter
  • 1996 (2) Apply 1996 filter
  • 1992 (2) Apply 1992 filter
  • 1991 (1) Apply 1991 filter
  • 1990 (1) Apply 1990 filter
  1. Home
  2. Proposal search
  3. Inland Waters Environmental Quality
  4. Terrestrial Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Coolimba Power Station Project, Eneabba

Last updated: September 17, 2010

The proposal is to construct and operate the Coolimba Power Station on a site located approximately 15 kilometres (km) south-south-west of Eneabba, and to establish an approximately 20 km long and 100 metre (m) wide infrastructure corridor that will accommodate the construction and operation of: a natural gas pipeline lateral to connect the power station to either the Dampier to Bunbury Natural Gas Pipeline (DBNGP) or the Parmelia Gas Pipeline; and a 330 kV electricity transmission line to... Read more...

Smiths Beach Development, Sussex Location 413 Yallingup

Last updated: June 15, 2010

The strategic proposal is to: extend the Leeuwin Naturaliste National Park into the western part of Sussex Location 413; and develop the eastern part of Sussex Location 413 for tourism and residential purposes with associated public open space and foreshore reserves as generally depicted on the Development Guide Plan. Read more...

Proposal to construct a road across Vasse Estuary, Ford Road, Shire of Busselton

Last updated: January 22, 2010

The Shire of Busselton proposes to build a road, known as Ford Road, across the Vasse Estuary. The road is currently an unsealed road (track). The Environmental Protection Authority (EPA) has previously reported on the environmental acceptability of constructing the road ( EPA Bulletin 940 ). In Bulletin 940, the EPA recommended that the proposal not be implemented as the proposal would not meet the EPA's objective in relation to waterbirds. The Shire of Busselton, as proponent, appealed... Read more...

Balmoral South Iron Ore Project, Cape Preston, WA

Last updated: December 23, 2009

Proposal to develop and operate an open-cut iron ore mine with infrastructure and utilities located in the Cape Preston region, 80 km south-west of Karratha by Mineralogy Pty Ltd. Read more...

Clay Excavation Lots 7, 20, 60, 63, and 64 previously part lot 1 and lots 222, 27, 26, 25, 28 and 7 Hallett and Copley Roads, Upper Swan (s46)

Last updated: November 2, 2009

Midland Brick Company Pty Ltd (Midland Brick) referred a proposal to the Environmental Protection Authority (EPA) on 3 May 2002 to indefinitely extend the time limit of its environmental approval for its clay excavation operation at Hallet and Copley Roads, Upper Swan and to expand the environmental approval to include Lot 19 Copley Road, Lots 19, 45 and 46 St Albans Road and Lot 100 Great Northern Highway, Upper Swan for further clay excavation operations. The new areas to be included in the... Read more...

Balla Balla Magnetite Project

Last updated: April 28, 2009

The proponent proposes to mine up to 10.1 Mtpa of magnetite ore to produce 6 Mtpa of ore concentrate over a 15 year mine life. The magnetite concentrate would be conveyed to Port Hedland from the mine via a 110 km slurry pipeline located alongside the existing Pilbara Energy Pipeline (PEPL). The concentrate would be dewatered at a purpose-built facility located at Utah Point in the Port Hedland Port area, prior to shipping overseas, where it would be used predominantly in steel manufacture. Read more...

Kemerton Power Station Enhancement Project

Last updated: August 9, 2007

The installation of a wet compression system and associated infrastructure within the existing Kemerton Power Station, and the construction of evaporation ponds and a water pipeline to deliver water from an existing offtake located about 4 kilometres to the east. The wet compression system will enable the power station to generate additional power at ambient temperatures above International Standards Organisation conditions by eliminating the sensitivity of the installed gas turbines to ambient... Read more...

Wallaby Gold Mine Project

Last updated: June 23, 2006

Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...

East Clontarf Residential Development

Last updated: May 25, 2006

The proposal is for residential development on the East Clontarf site, approximately 18ha in size. The site is bounded by Manning Road, Centenary Avenue and the Canning River. It is zoned Urban in the Metropolitan Region Scheme (MRS) and Residential in the City of South Perth Town Planning Scheme. The foreshore area adjacent to the proposed development is identified for protection as Bush Forever site 333 and reserved for Parks and Recreation in the MRS. Read more...

Phillips River Gold Project

Last updated: March 28, 2006

The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...

Southern Looping Project, Loop 10, south of Kwinana

Last updated: December 28, 2005

The proposal is to construct and operate a 23-kilometre pipeline from Kwinana Junction, in Kwinana to Hopelands (between Punrak Road and Henderson Road). This proposal is known as the Southern Looping Project, and comprises loop 10. The proponent has also referred a proposal to construct and operate a 194-kilometre pipeline from Compressor Station 1 south of Karratha, to Compressor Station 9, north of Gingin. This proposal, known as the Northern Looping Project , and comprising loops 1 to 9,... Read more...

Kemerton Lateral Gas Pipeline

Last updated: November 29, 2005

The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-... Read more...

Extensions to Exmouth Marina Harbour

Last updated: July 8, 2005

The proposal is to construct a marina, resort and residential/ canal development as a land backed extension to the Exmouth Boat Harbour immediately south of the Exmouth township. Read more...

South West Metropolitan Railway Perth to Mandurah

Last updated: March 4, 2005

The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...

Industrial Subdivision – Lot 502 North Lake, Sudlow and Phoenix Roads, Bibra Lake (2)

Last updated: September 20, 2004

Proposal to subdivide approximately 89 hectares of land being Lot 502 bounded by North Lake, Phoenix and Sudlow Roads and a rail reserve, for industrial and mixed business purposes. The proponent for the proposal is the Western Australian Land Authority trading as LandCorp (LandCorp). Read more...

Mundaring Water Treatment Plant and Sawyer's Valley Water Storage Tanks

Last updated: June 25, 2004

Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...

Proposed Forest Management Plan 2004-2013

Last updated: December 4, 2003

The Conservation Commission of Western Australia has prepared through the agency of the Department of Conservation and Land Management, a Proposed Forest Management Plan to apply to the Swan, South West and Warren Regions of the Department of Conservation and Land Management during 2004-2013. This is the EPA's assessment of the environmental factors relating to the proposed plan and the Authority's advice and recommendations to the Minister for Environment. Read more...

Ludlow Titanium Minerals Mine, 34 Kilometres south of Bunbury

Last updated: May 12, 2003

Cable Sands (WA) Pty Ltd proposal to develop a mineral sands mine in a section of State Forest No.2, near Ludlow. Read more...

Methanol Complex, Burrup Peninsula

Last updated: December 20, 2002

Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.