ProjectProponent: Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty LimitedProposal description: The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-metre (m) wide DBNGP easement, previously cleared in the 1980s. Assessment Number: 1604Region: South WestReferred under EP Act: s38Industry sector: InfrastructureOil and gasLast updated: November 29, 2005Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalPreliminary Environmental Factors: Flora and VegetationTerrestrial Environmental QualityTerrestrial FaunaInland Waters Environmental QualityDate published: Monday, 31 October, 2005 4. EPA Report on assessmentEPA Report Number: 1204EPA Report: Kemerton Lateral Gas Pipeline (PDF, 654.99 KB)Key Environmental Factors: Flora and VegetationTerrestrial FaunaInland Waters Environmental QualityDate published: Monday, 31 October, 2005Appeals close: Monday, 14 November, 2005 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Tuesday, 29 November, 2005Ministerial Statement: Ministerial Statement 704 (PDF, 550.7 KB)