This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 26, 2016
Brikmakers Pty Ltd proposes to extract clay from Lot 7 Toy Rd Bindoon, within the Shire of Chittering. Approximately 15 hectares (ha) of predominately pasture land will be disturbed for the construction of two clay excavation pits, a stockpile area, two dams, and bunds. Upgrading of a causeway across the Brockman River, which traverses west to east along the southern portion of the property, together with a new crossover to Toy Road is also proposed. Read more...Last updated: March 4, 2015
The proposal is for the construction and operation the Kintyre uranium project. The proposal includes the open cut mining of uranium ore, processing, and the transport of uranium ore concentrate to the Port of Adelaide. The project is located 260km north-east of Newman in the East Pilbara region of Western Australia. Read more...Last updated: February 26, 2015
The Minister for Environment has requested that the EPA inquire into and report on the matter of changing the implementation conditions relating to Ministerial Statement 905 in order to: extend the time limit on shipments of lead carbonate through Fremantle Port (condition 3A); and reduce the amount of the financial assurance required and allow the release and reinstatement of the financial assurance in the event operations are suspended (condition 18). Read more...Last updated: October 16, 2014
The proposal is to develop a mineral sands mine near the Keysbrook township. The proposal involves the extraction and processing of a low-grade heavy mineral sands deposit. This inquiry under s46 is in regard to a request for an extension of time for substantial commencement specified in Ministerial Statement 810 . Read more...Last updated: February 25, 2013
Main Roads Western Australia proposes to construct the Bunbury Outer Ring Road Southern Section (South Western Highway to Bussell Highway) at Bunbury. The project will provide improved access from Bussell Highway in the south, to the Bunbury Port and developing industrial area to the east of Bunbury. Read more...Last updated: January 22, 2013
The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...Last updated: November 24, 2011
The proposal is for the construction and operation of a mineral sands mine at Gwindinup, approximately 25 kilometres south-south-east of Bunbury and between two and ten kilometres south of the town of Boyanup. Read more...Last updated: February 23, 2011
The proposal is to develop an open-cut lead carbonate mine and processing facilities approximately 30 kilometres west of the Wiluna townsite to produce a lead concentrate. The lead concentrates will be refined at the Wiluna minesite to produce lead metal, or alternatively will be transported by road to the Geraldton Port and exported. Post-assessment changes to the proposal stipulate that the lead carbonate concentrate produced at the mine-site is transported in sealed bags within locked... Read more...Last updated: December 1, 2009
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...