Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Infrastructure (26) Apply Infrastructure filter
  • Industrial (7) Apply Industrial filter
  • Oil and gas (7) Apply Oil and gas filter
  • Iron Ore (6) Apply Iron Ore filter
  • Salt (6) Apply Salt filter
  • Power generation (3) Apply Power generation filter
  • Utilities (3) Apply Utilities filter
  • Aquaculture (2) Apply Aquaculture filter
  • Bauxite (1) Apply Bauxite filter
  • Copper (1) Apply Copper filter
  • Gold (1) Apply Gold filter
  • Land use (1) Apply Land use filter

Filter by current status:

  • Ministerial Statement published (30) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (11) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (5) Apply Environmental Scoping Document approved filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Response to submission published (2) Apply Response to submission published filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Minister determined that the proposal should not be implemented (1) Apply Minister determined that the proposal should not be implemented filter
  • Proposal withdrawn (1) Apply Proposal withdrawn filter
  • Public Environmental Review period closed (1) Apply Public Environmental Review period closed filter

Filter by relevant environmental factors:

  • (-) Remove Benthic Communities and Habitats filter Benthic Communities and Habitats
  • (-) Remove Flora and Vegetation filter Flora and Vegetation
  • Marine Environmental Quality (46) Apply Marine Environmental Quality filter
  • Marine Fauna (45) Apply Marine Fauna filter
  • Terrestrial Fauna (44) Apply Terrestrial Fauna filter
  • Social Surroundings (36) Apply Social Surroundings filter
  • Coastal Processes (25) Apply Coastal Processes filter
  • Inland Waters (17) Apply Inland Waters filter
  • 37 (15) Apply 37 filter
  • Terrestrial Environmental Quality (13) Apply Terrestrial Environmental Quality filter
  • Hydrological Processes (11) Apply Hydrological Processes filter
  • Inland Waters Environmental Quality (10) Apply Inland Waters Environmental Quality filter
  • Subterranean Fauna (8) Apply Subterranean Fauna filter
  • Landforms (7) Apply Landforms filter
  • 3144 (5) Apply 3144 filter
  • Human Health (3) Apply Human Health filter

Filter by Proponent:

  • Minister for State Development (4) Apply Minister for State Development filter
  • Chevron Australia Pty Ltd (3) Apply Chevron Australia Pty Ltd filter
  • Forge Resources Swan Pty Ltd (2) Apply Forge Resources Swan Pty Ltd filter
  • Fortescue Metals Group Limited (2) Apply Fortescue Metals Group Limited filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Mardie Minerals Pty Ltd (2) Apply Mardie Minerals Pty Ltd filter
  • NW Interconnected Power Pty Ltd (2) Apply NW Interconnected Power Pty Ltd filter
  • Water Corporation (2) Apply Water Corporation filter
  • API Management Pty Ltd (1) Apply API Management Pty Ltd filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • Australian Methanol Company Pty Ltd (1) Apply Australian Methanol Company Pty Ltd filter
  • Aztec Resources Limited (1) Apply Aztec Resources Limited filter
  • BHP Billiton Petroleum Pty Ltd (1) Apply BHP Billiton Petroleum Pty Ltd filter
  • Cape Seafarms Pty Ltd (1) Apply Cape Seafarms Pty Ltd filter
  • Coral Coast Marina Development Pty Ltd (1) Apply Coral Coast Marina Development Pty Ltd filter
  • Cranford Pty Ltd (1) Apply Cranford Pty Ltd filter
  • Department of Commerce and Trade (1) Apply Department of Commerce and Trade filter
  • Director General of the Department of Transport on behalf of the State of Western Australia (1) Apply Director General of the Department of Transport on behalf of the State of Western Australia filter
  • Gascoyne Gateway Ltd (1) Apply Gascoyne Gateway Ltd filter
  • Grange Resources Limited (1) Apply Grange Resources Limited filter
  • Grange Resources Ltd (1) Apply Grange Resources Ltd filter
  • Harvey Water (1) Apply Harvey Water filter
  • K + S Salt Australia Pty Ltd (1) Apply K + S Salt Australia Pty Ltd filter
  • Lanco Resources Australia Pty Ltd (1) Apply Lanco Resources Australia Pty Ltd filter
  • Minister for Resources Development (1) Apply Minister for Resources Development filter
  • Mobil Australia Resources Company Pty Ltd (1) Apply Mobil Australia Resources Company Pty Ltd filter
  • Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust (1) Apply Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust filter
  • Onslow Infraco Pty Ltd (1) Apply Onslow Infraco Pty Ltd filter
  • Onslow Marine Support Base Pty Ltd (1) Apply Onslow Marine Support Base Pty Ltd filter
  • Point Grey Development Company Pty Ltd (1) Apply Point Grey Development Company Pty Ltd filter
  • Province Resources Limited (1) Apply Province Resources Limited filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Roc Oil (WA) Limited (1) Apply Roc Oil (WA) Limited filter
  • Rottnest Island Authority (1) Apply Rottnest Island Authority filter
  • Sino Iron Pty Ltd and Korean Steel Pty Ltd (1) Apply Sino Iron Pty Ltd and Korean Steel Pty Ltd filter
  • Straits Salt Pty Ltd (1) Apply Straits Salt Pty Ltd filter
  • Subsea 7 Australia Contracting PTY LTD (1) Apply Subsea 7 Australia Contracting PTY LTD filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • SubSea International Australia Inc (1) Apply SubSea International Australia Inc filter
  • Tassal Operations Pty Ltd (1) Apply Tassal Operations Pty Ltd filter
  • VBX Limited (1) Apply VBX Limited filter
  • WA Offshore Windfarm Pty Ltd (1) Apply WA Offshore Windfarm Pty Ltd filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • Western Stevedores Pty Ltd (1) Apply Western Stevedores Pty Ltd filter
  • WGEH Pty Ltd (1) Apply WGEH Pty Ltd filter

Filter by region:

  • Pilbara (26) Apply Pilbara filter
  • Perth (9) Apply Perth filter
  • Gascoyne (6) Apply Gascoyne filter
  • Mid West (6) Apply Mid West filter
  • Kimberley (4) Apply Kimberley filter
  • South West (2) Apply South West filter
  • Goldfields Esperance (1) Apply Goldfields Esperance filter
  • Great Southern (1) Apply Great Southern filter
  • Peel (1) Apply Peel filter

Filter by last updated:

  • 2025 (7) Apply 2025 filter
  • 2024 (9) Apply 2024 filter
  • 2023 (6) Apply 2023 filter
  • 2022 (4) Apply 2022 filter
  • 2021 (4) Apply 2021 filter
  • 2020 (5) Apply 2020 filter
  • 2019 (3) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (2) Apply 2016 filter
  • 2014 (2) Apply 2014 filter
  • 2013 (1) Apply 2013 filter
  • 2012 (2) Apply 2012 filter
  • 2010 (1) Apply 2010 filter
  • 2009 (1) Apply 2009 filter
  • 2004 (1) Apply 2004 filter
  • 2003 (2) Apply 2003 filter
  • 2002 (2) Apply 2002 filter
  • 1997 (2) Apply 1997 filter
  1. Home
  2. Proposal search
  3. Benthic Communities and Habitats
  4. Flora and Vegetation

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Browse Liquefied Natural Gas Precinct

Last updated: December 21, 2016

Note: In the matter of The Wilderness Society of WA (Inc) –v- Minister for Environment [2013] WASC, the Supreme Court of Western Australia found the Minister’s agreement decision invalid because the EPA’s decision to report was invalid., The proposal is a strategic environmental assessment for a common user LNG hub precinct for future Browse Basin gas processing in the Kimberley Region. Read more...

Mangles Bay Marine Based Tourist Precinct

Last updated: December 7, 2016

The proposal is to construct and operate a single entrance onshore marina to accommodate up to 500 boat pens and moorings and a surrounding land development comprising tourism, commercial, public open space and residential land uses. Read more...

Bunbury Berth 14A Expansion Project

Last updated: June 18, 2014

The proposal is to construct and operate a coal handling and export facility within the Bunbury Port Inner Harbour in the south-west region of Western Australia. Read more...

Pilbara Iron Ore and Infrastructure Project: Port and North-South Railway (Stage A)

Last updated: February 6, 2014

The proposal has the following main components: a 345 km railway line from Port Hedland to proposed mining operations at Mindy Mindy. This railway will be constructed in two parts: Part 1 from Port Hedland to the Chichester Ranges and Part 2 from the Chichester Ranges to Mindy Mindy; construction of port facilities consisting of rail loop, car dumper, stockyard and ore handling facilities (including two stackers and a single reclaimer), rescreening facility and product conveyor out to a wharf... Read more...

Oakajee Deepwater Port (s. 46) [1950]

Last updated: January 22, 2013

The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...

Point Grey Marina

Last updated: August 1, 2012

The proposal is for the construction of an onshore marina (and associated boating infrastructure e.g. boat pens, jetties, navigational aids, entrance channel, protective groynes, public boat ramps and car parks) on the western side of the Point Grey peninsula. The proposal also includes the construction of a 2.5 kilometre navigation channel across the Harvey Estuary from the marina to the Dawesville Channel. Read more...

Macedon Gas Development

Last updated: January 17, 2012

The proposal is to construct a sub sea pipeline, onshore gas treatment and compression plant, and sales gas pipeline. The subsea pipeline from the Macedon Gas Field (100 kilometres west of Onslow) connects to the onshore gas treatment and compression plant at Ashburton North (15 kilometres southwest of Onslow). The sales gas pipeline connects the onshore facility to the Dampier to Bunbury Natural Gas (DBNG) Pipeline. Read more...

Yannarie Solar Salt East Coast of Exmouth Gulf

Last updated: February 9, 2010

Straits Salt proposes to construct and operate a 4.2 million tonne per annum solar salt farm on the east coast of Exmouth Gulf. Read more...

Oakajee deepwater port, Oakajee, Shire of Chapman Valley

Last updated: December 1, 2009

The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...

Cliff Head Oil Field Development

Last updated: December 22, 2004

Roc Oil (WA) Limited proposes to develop the Cliff Head Oil Field located approximately 20 kilometres (km) south of Dongara. Read more...

Coral Coast Resort

Last updated: July 11, 2003

The proposal is for the first stage of a Coral Coast Resort (CCR), which includes tourist, residential and incidental commercial facilities centred around an inland marina, at the site called Mauds Landing. The CCR proposal envisages the establishment, in the first stage, of a marina, a caravan park, an interpretative centre, a back-packers facility, stage one of a resort complex, provision of utilities infrastructure and the preparation of land with services for sale at a later date. The CCR... Read more...

Perth Metropolitan Desalination Proposal

Last updated: May 26, 2003

The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...

Methanol Plant and Product Export, Burrup Peninsula

Last updated: December 20, 2002

The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...

Dampier Public Wharf Expansion – Load-out facility and lay-down area, Port of Dampier

Last updated: April 10, 2002

The proposal involves an expansion of the existing Dampier Public Wharf to provide improved facilities capable of servicing the future needs of industry in the area. The key components of the proposal are: construction of a 60-81 m long load-out facility south of the existing wharf; cut and fill operations to create a land backing to the facility (1.9 ha, of which 0.8 ha is reclaimed land); and quarrying of a 4.1 ha cargo lay-down and storage area. Read more...

Prawn Farm at Heron Point, Exmouth Gulf

Last updated: August 28, 1997

The proposal is for a staged development of a 120 hectare prawn farm at Heron Point, approximately 35 kilometres south of Exmouth in Exmouth Gulf. Read more...

Pipeline fabrication site within Mardie Station Pastoral Lease

Last updated: July 14, 1997

The proposal is to construct a pipeline fabrication site within the exrstmg Mardie Station Pastoral lease and existing Vacant Crown Land Reserve, approximately 45km south west of Dampier and 15km east of Cape Preston is detailed in the CER. Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.