This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: May 12, 2025
Tronox Management Pty Ltd are proposing to expand the existing Cooljarloo Mineral Sands Project by mining a satellite pit named Osprey. The project is located approximately 20 kilometres northwest of Cataby. The Osprey Expansion has a disturbance footprint of 61 hectares (ha) of which 59.14 ha is native vegetation. Dredge mining will be used to avoid pit dewatering. Water for mining and concentrating will be sourced from existing licenced bores. The final mine void will be backfilled above the... Read more...Last updated: March 31, 2025
Development of Parron Wind Farm, located approximately 8 km north-west of Badgingarra, Western Australia. The Development Envelope is approximately 8,527.4 hectares with a total Disturbance Footprint of 491.54 ha. The Proposal involves the construction of up to 79 Wind Turbine Generators (WTG) capable of generating up to 489.8 MW along with associated infrastructure including access roads, electrical cabling and a substation. The wind farm will be connected to the existing 330kV transmission... Read more...Last updated: March 4, 2025
FutureEnergy Australia is proposing to construct and operate a biorefinery processing plant to produce a renewable biodiesel. The proposed proposal is located on Lot 31 on Plan 404104, Narrogin, within the shire of Narrogin, Western Australia. The proposal includes a biorefinery plant, a feedstock receival area, woodchip drying beds, and supporting infrastructures. The biorefinery plant will utilize waste lignocellulose biomass as feedstock which will undergo pyrolysis followed by non-catalytic... Read more...Last updated: January 6, 2025
Development of a wind farm approximately 7 km east of the township of Williams and 9 km west of the township of Narrogin in Western Australia. The Proposal will involve the construction and operation of up to 25 turbines, a battery energy storage system (BESS) and ancillary infrastructure. It is located across numerous freehold properties that are primarily cleared for agricultural purposes. The proposal includes no more than 7.41 ha of remnant native vegetation clearing and 0.98 of planted... Read more...