This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 16, 2020
This proposal involves the recommencement and expansion of mining at the Telfer Gold Mine to include the mining and processing of 400 million tonnes of gold ore at a rate of up to 23 million tonnes per annum, and the transport of copper concentrate to Port Hedland by road. Key components of the expansion include: expansion of existing underground mining areas and deepening of the existing open pits; extensions to the existing southern waste rock dump and several other dumps; construction of a... Read more...Last updated: July 21, 2020
ACH Minerals proposes to develop the Kundip Mine Site located approximately 17 km south-east of Ravensthorpe in the Shire of Ravensthorpe. The proposal involves the development and operation of a gold and copper mine including open cut and underground mining, processing facilities, waste rock landforms, a tailings storage facility and associated infrastructure. The project will have an 8 year mine life and a disturbance area of 244.7 hectares including 197.8 hectares of native vegetation within... Read more...Last updated: April 30, 2018
Ramelius Resources Ltd propose to extend the life of the Edna May Gold Project operations by developing a new open pit immediately to the west of the existing operations. The project implementation would result in disturbance of up to 55.3 hectares of vegetation. The Edna May Gold Project is located approximately 1 km north-west of the township of Westonia and 312 km east of Perth. Read more...Last updated: April 18, 2018
Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...Last updated: December 30, 2016
The proposal is to expand existing open-cut and underground gold mining developments within a defined project area on the surface of Lake Lefroy, approximately 20 kilometres south east of Kambalda. The proposal includes the discharge of dewatering to the lake’s surface and the construction of associated mining infrastructure (including open pits and waste rock dumps). Read more...Last updated: December 8, 2016
Southern Cross Goldfields Limited proposes to develop an open pit gold mine operation and gold processing plant 150 kilometres north of Southern Cross. The proposal would involve mining 1.6 million tonnes (Mt) of ore and 8.2 Mt of waste rock over a life of 2.5 years at three pit locations; Marda Central, King Brown and Golden Orb. The processing plant, tailings storage facility, and two out of four of the waste rock landforms would be located at Marda Central. The remaining two waste rock... Read more...Last updated: December 7, 2016
The proposal referred to the Environmental Protection Authority is the Hidden Secret underground Mine. Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) proposes to mine for gold at the Hidden Secret ore body. Hidden secret is an underground ore body located east of Williamstown, 350 metres east of the Mt Charlotte underground mine. The Mt Charlotte Underground Mine is operated by KCGM and is located adjacent to the City of Kalgoorlie-Boulder, approximately 600 kilometres east of Perth. Mining... Read more...Last updated: June 30, 2016
The proposal is for the operation of a gold concentrate processing plant and associated infrastructure at Gidji approximately 17 km north of the City of Kalgoorlie-Boulder. Inquiry under s46 in regard to changing the implementation conditions of Ministerial Statement 28 and Ministerial Statement 77 . Read more...Last updated: June 17, 2015
This report provides the Environmental Protection Authority's (EPA's) advice and recommendations to the Minister for the Environment on the proposal by Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) to expand their Fimiston operations in Kalgoorlie by widening and deepening the Superpit by means of the Golden Pike Cutback, and to plan for mine closure. Read more...Last updated: December 6, 2013
Proposed Gold Mining at Lake Lefroy. Inquiry under s46 to amend Ministerial Statement 548 . Read more...Last updated: April 22, 2013
Minjar Gold Pty Ltd project involves varying the current status of the mine from Care and Maintenance to Operating, expanding a series of existing pits, developing new deposits and making a small addition to the accommodation facilities. The project has an established Carbon in Leach processing facility and tailings storage facility and existing approvals to operate (Works Approval and approved Mining Proposals). Minjar Gold plans to produce gold from a chain of open pits extending over a 50 km... Read more...Last updated: May 2, 2012
The proposal is to supply power to an expanded mining operation at the Telfer Gold Mine. The proposed expansion of the Telfer Gold Mine associated with this proposal is being dealt with separately. That mine expansion is set out in a separate referral to the EPA (Newcrest Mining Limited 2002b). The mine expansion and power supply proposals have been separated because it is likely that the mine and power supply will eventually be operated by different proponents. Nevertheless, the proposals have... Read more...Last updated: July 11, 2011
Inquiry under s46 regarding amendments to the conditions of Ministerial Statement 749 to remove the speed limit restrictions applied to mulgara habitat areas in this project. Read more...Last updated: December 15, 2009
The Red October Gold Project is located on the western shore of Lake Carey, 80km south of Laverton. The proposal is to mine approximately 16 million tonnes of ore and associated waste material over a two year period involves development of an open cut gold mine and waste rock dumps on the lake bed and construction of mine infrastructure and borrow pits on Anglefish Island adjacent to the mining pit. Read more...Last updated: January 8, 2008
This assessment relates to the application by Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) for an Approval pursuant to noise regulation 17 for its proposed Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning. The Approval will enable KCGM to vary its noise levels from the prescribed standard in the noise regulations. Following the release of the EPA’s initial advice and recommendations to the Minister for the Environment, Bulletin 1271, the Minister for the... Read more...Last updated: November 12, 2007
KCGM has applied to the Minister for the Environment for an Approval pursuant to noise regulation 17 to enable it to vary its noise levels from the prescribed standard in the noise regulations, which has been triggered by the Environmental Impact Assessment of the proposed Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning. In accordance with noise regulation 17, the Minister has referred the application for variation to the EPA for assessment. The basis of the... Read more...Last updated: June 23, 2006
Proposal to develop the Wallaby Gold Mine. Located on the shore of Lake Carey, a naturally occurring saline wetland approximately 27 km south-west of Laverton. The Wallaby Gold Mine Project includes development of an open cut gold mine, waste rock dumps and infrastructure to support mining on the northern shoreline of the lake. Gold ore produced at the mine will be transported via overland conveyor to an existing processing plant with tailings placed in both an extended and a new tailings... Read more...Last updated: May 17, 2006
KCGM are currently operating open pit and underground gold mines on the Golden Mile, which is an historical gold mining area adjacent to the urban area of Kalgoorlie/Boulder. The proposal involves an expansion of existing open-cut mining activities. KCGM intends to rationalize the various open-cut mining operations on the Fimiston mining leases into a single operation. This would entail incorporation of the existing open pits into two large open pits to be known as the Combined Pit and the... Read more...Last updated: March 28, 2006
The proposal is for the developing of mining operations at the areas of Trilogy and Kundip, construction of a haul road, construction and operation of a processing plant, and disposal of tailings at the RAV 8 site. Read more...Last updated: November 25, 2004
Australian Gold Reagents Pty Ltd (AGR) proposes a review of its Ministerial conditions relating to the manufacture, storage and transport of sodium cyanide in order to clarify their intent, remove obsolete or confusing aspects, update standard conditions and consolidate the relevant conditions into one Statement. Read more...