This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: July 30, 2025
Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...Last updated: July 22, 2025
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: June 6, 2025
The proposal is to construct and operate a wind farm and linear infrastructure to provide renewable energy to Fortescue mining operations within the Pilbara. The proposal comprises of wind turbines, 220 kV transmission lines, substations and switchyards, 33 kV reticulation lines, a borefield, roads, pipelines, corridors of overhead lines, battery energy storage, accommodation camps, wastewater treatment plant, optional airstrip and supporting infrastructure. The Proposal is located... Read more...Last updated: June 3, 2025
Horizon Power proposes to construct and operate the Broome Future Energy System (FES) for energy supply to the town of Broome within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 90 megawatts (MW), battery energy storage systems (BESS) and a network connection route. The solar PV and BESS will be installed at a site approximately 10 km north of Broome. A network connection route will connect the solar PV and BESS to the... Read more...Last updated: April 13, 2025
Infinite Green Energy propose to construct and operate a green energy wind and solar powered hydrogen production facility within freehold lots 3, 4, 100 and 6110 located in Arrowsmith 30km south of Dongara, within the Shire of Irwin, Western Australia (WA). Infinite Blue Energy purchased the 1929.68 ha property due to the site’s abundance of wind and solar power combined with abundant quantity of quality fresh water. The previous property use involved sheep, cattle and goats grazing. The... Read more...Last updated: January 24, 2025
The Proposal will use combined onshore wind and solar energy of approximately 5.2 gigawatt (GW) capacity to produce green hydrogen which will be converted to an estimated 2 Million tonnes per annum (Mtpa) of green ammonia for export to emerging green energy markets. The Proposal is located within the Shire of Northampton, Western Australia (WA), approximately 20 km north of Kalbarri. The Proposal comprises the following major components: a wind and solar farm with a combined installed capacity... Read more...Last updated: February 5, 2024
Province Resources Ltd propose to use combined onshore wind and solar energy to produce green hydrogen and ammonia for export to the green energy market. The proposal is distributed across 3 distinct locations within the Shire of Carnarvon, Western Australia. The proposal will comprise the following major elements: • up to 945 ha (6.8 GW) of wind turbines and up to 10,000 ha of solar arrays (5.2 GW) • a new multiuser port facility with a material offloading facility and export terminal •... Read more...Last updated: October 18, 2023
Pilbara Energy (Generation) Pty Ltd proposes to construct and operate the Uaroo Renewable Energy Hub on the Uaroo and Emu Creek Pastoral Stations located 120 kilometres south of Onslow, in the Pilbara region of Western Australia. The proposal is to construct and operate a renewable energy generation hub to power Fortescue Metals Group Limited’s mining operations in the Pilbara. The proposal will generate electricity (up to 5.4 gigawatts) from up to 340 wind turbine generators and a solar farm.... Read more...