Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • (-) Remove Infrastructure filter Infrastructure
  • Iron Ore (3) Apply Iron Ore filter

Filter by current status:

  • Ministerial Statement published (19) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • Awaiting Ministerial decision (2) Apply Awaiting Ministerial decision filter
  • Assessment on Proponent Information – Request for More Information published (1) Apply Assessment on Proponent Information – Request for More Information published filter
  • Proposal withdrawn (1) Apply Proposal withdrawn filter

Filter by preliminary environmental factors:

  • Flora and Vegetation (11) Apply Flora and Vegetation filter
  • Marine Environmental Quality (9) Apply Marine Environmental Quality filter
  • Social Surroundings (8) Apply Social Surroundings filter
  • Terrestrial Fauna (8) Apply Terrestrial Fauna filter
  • Coastal Processes (6) Apply Coastal Processes filter
  • Marine Fauna (6) Apply Marine Fauna filter
  • 37 (5) Apply 37 filter
  • Benthic Communities and Habitats (5) Apply Benthic Communities and Habitats filter
  • Hydrological Processes (4) Apply Hydrological Processes filter
  • Terrestrial Environmental Quality (4) Apply Terrestrial Environmental Quality filter
  • Human Health (3) Apply Human Health filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Subterranean Fauna (3) Apply Subterranean Fauna filter
  • Landforms (1) Apply Landforms filter
  • People (1) Apply People filter

Filter by Proponent:

  • Geraldton Port Authority (3) Apply Geraldton Port Authority filter
  • Minister for State Development (3) Apply Minister for State Development filter
  • Karara Mining Limited (2) Apply Karara Mining Limited filter
  • Minister for Resources Development (2) Apply Minister for Resources Development filter
  • Oakajee Port and Rail Pty Ltd (2) Apply Oakajee Port and Rail Pty Ltd filter
  • Commonwealth Scientific and Industrial Research Organisation (1) Apply Commonwealth Scientific and Industrial Research Organisation filter
  • Department of State Development (1) Apply Department of State Development filter
  • Extension Hill Pty Ltd (1) Apply Extension Hill Pty Ltd filter
  • Golden West Resources Ltd (1) Apply Golden West Resources Ltd filter
  • Humfrey Land Developments Pty Ltd (1) Apply Humfrey Land Developments Pty Ltd filter
  • Magellan Metals Pty Ltd (1) Apply Magellan Metals Pty Ltd filter
  • Mid West Ports Authority (1) Apply Mid West Ports Authority filter
  • Mt Gibson Mining (1) Apply Mt Gibson Mining filter
  • Shark Bay Salt Joint Venture (1) Apply Shark Bay Salt Joint Venture filter
  • Shire of Coorow; Shire of Dandaragan (1) Apply Shire of Coorow; Shire of Dandaragan filter
  • Shire of Northhampton (1) Apply Shire of Northhampton filter
  • State Energy Commission of Western Australia (1) Apply State Energy Commission of Western Australia filter
  • Western Power Corporation (1) Apply Western Power Corporation filter
  • Westrail (1) Apply Westrail filter

Filter by region:

  • (-) Remove Mid West filter Mid West

Filter by last updated:

  • 2025 (1) Apply 2025 filter
  • 2024 (1) Apply 2024 filter
  • 2023 (1) Apply 2023 filter
  • 2020 (1) Apply 2020 filter
  • 2017 (2) Apply 2017 filter
  • 2016 (1) Apply 2016 filter
  • 2013 (2) Apply 2013 filter
  • 2012 (1) Apply 2012 filter
  • 2011 (3) Apply 2011 filter
  • 2009 (2) Apply 2009 filter
  • 2008 (2) Apply 2008 filter
  • 2002 (2) Apply 2002 filter
  • 2000 (1) Apply 2000 filter
  • 1999 (1) Apply 1999 filter
  • 1995 (1) Apply 1995 filter
  • 1994 (1) Apply 1994 filter
  • 1992 (2) Apply 1992 filter
  • 1989 (1) Apply 1989 filter
  1. Home
  2. Proposal search
  3. Infrastructure
  4. Mid West

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Extension Hill haematite haulage, road and rail siding

Last updated: January 29, 2025

Mount Gibson Mining Limited proposes to upgrade, widen and straighten existing local roads and construct and operate a rail siding south of Perenjori, to facilitate the transport of hematite iron ore from the already approved Extension Hill mine site at Mount Gibson to Geraldton Port for export. Read more...

Geraldton Port Maximisation Project

Last updated: October 14, 2024

The Mid West Ports Authority is proposing marine infrastructure upgrades at the Port of Geraldton. The Proposal has a disturbance footprint of up to 38 hectares (ha), of which 17 ha is a new footprint and 21 ha the existing port, within a 75 ha development envelope. The Proposal is a significant amendment to the Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment (Original Proposal) (Ministerial statement 600), and consists of: dredging and land... Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (S46) [2364]

Last updated: May 29, 2023

Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [2171]

Last updated: June 18, 2020

Inquiry under s46 into changing the conditions (extension of time limit for proposal implementation) of Ministerial Statements 469, 774, 815 and 927. Read more...

Karara Iron Ore Project

Last updated: December 13, 2017

The proposal is to construct and operate a magnetite iron ore mine, processing plant and associated infrastructure, linear infrastructure corridor accommodating the raw water pipeline to the borefield near Mingenew, and access road to Morawa, in the Midwest region of Western Australia. Read more...

Square Kilometer Array Radio Telescope - SKA1 Low Frequency Aperture Array

Last updated: March 20, 2017

The CSIRO is proposing to construct and operate the SKA-1 Low Frequency Aperture Array. The SKA -1 Low Frequency Aperture Array would be constructed at the SKA Telescope on Boolardy Station approximately 315 km northeast of Geraldton in the Murchison region. The proposal for the SKA – Low Frequency Aperture Array includes a total disturbance of 608 hectares for construction of the Array, access tracks and infrastructure. Read more...

Magellan Lead Carbonate Project - Inquiry under s. 46 to replace Ministerial Statements 783 and 559

Last updated: August 19, 2016

The proposal includes an open-cut lead carbonate mine and processing facilities 30 kilometres west of the Wiluna townsite. The lead carbonate concentrate produced at the mine-site is transported in sealed bags within locked shipping containers by road from the mine-site to Leonora and then by rail to the Port of Fremantle where it is exported. Read more...

Wiluna West Iron Ore Mining Operation

Last updated: April 22, 2013

Read more...

Oakajee Deepwater Port (s. 46) [1950]

Last updated: January 22, 2013

The proposal is for the construction of a deepwater port. Inquiry under s46 regarding changing condition 9 of Ministerial Statement 469 . Read more...

Mount Gibson Iron Ore Mine and Infrastructure Project

Last updated: February 28, 2012

Mount Gibson Mining Limited proposes to mine and process iron ore (hematite and magnetite) from Extension Hill and Extension Hill North. The proposal also includes the construction of a pipeline to transport the magnetite slurry to Geraldton Port, and infrastructure at the port to strip the ore from the slurry for export. The operation will yield approximately 13 million tonnes of hematite over 8 years and 230 million tonnes of magnetite over 20 years. Extension Hill and Extension Hill North... Read more...

Oakajee Rail Development

Last updated: March 14, 2011

Oakajee Rail Development is a component of the larger Oakajee Port and Rail Development. The proposed heavy haulage railway and the associated facilities covered in this proposal include 570 kilometres (km) of railway and associated rail infrastructure extending in a north-easterly direction from the North West Coastal Highway (NWCH) approximately 1.5km south of Olsen Road at Oakajee, approximately 24km north of Geraldton, to the Jack Hills mining operations located approximately 500km to the... Read more...

Oakajee Terrestrial Port Development

Last updated: March 14, 2011

The proposal is to construct and operate iron ore handling and storage facilities and ancillary infrastructure required to develop and operate a 45 million tonne per annum iron ore export facility at Oakajee, 24km north of Geraldton. Read more...

Mungada Iron Ore Project

Last updated: March 11, 2011

The proposal is to mine hematite and magnetite iron ore from the Blue Hills North and Terapod deposits, and construction of associated mine infrastructure, upgraded access road to Morawa, Tilley Siding, and powerline corridor in the Midwest region of Western Australia. Read more...

Oakajee deepwater port, Oakajee, Shire of Chapman Valley

Last updated: December 1, 2009

The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton. Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector. The port study area is approximately 23 kilometres north of Geraldton. The port will... Read more...

Oakajee Deepwater Port (s46) [1813]

Last updated: November 25, 2009

Department of State Development's request for a change to the environmental conditions that apply to the substantial commencement date for works at the Oakajee Deepwater Port, Shire of Chapman Valley. Previous Ministerial Statements 469 and 774 , previous assessments 1074 and 1722. Read more...

Long Island Tourism Development, Houtman-Abrolhos Islands

Last updated: December 4, 2008

The construction and operation of a tourism development on Long Island, Wallabi Group, Houtman-Abrolhos Islands, consisting of visitor lodges (maximum of 60 guests), staff accommodation, communal facilities (including day-visitor facilities), boardwalks and gazebos, a swimming pool, deep water jetty, helipad, wastewater treatment plant, desalination plant and other maintenance/service facilities Read more...

Oakajee Deepwater Port, Oakajee, Shire of Chapman Valley (s46) [1722]

Last updated: August 12, 2008

Inquiry under s46 into changing the conditions (time extension) of Ministerial Statement 469 , relating to the construction of a deepwater port at either the “north”, “central” or “south” location. Read more...

Transmission line from Cataby substation to Eneabba substation

Last updated: October 2, 2002

The proposal is for the construction and operation of a 132 kilovolt transmission line, approximately 80 kilometres in length, from the Cataby substation to the Eneabba substation. Read more...

Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment

Last updated: July 31, 2002

The Geraldton Port Authority (GPA) proposes to upgrade the Port of Geraldton (otherwise known as the Port Enhancement Project (PEP)) and undertake preparatory works for the Town Beach Foreshore Redevelopment Project. The objective of the PEP is to enable vessels to sail from the port fully laden. Read more...

Kalbarri Airport

Last updated: October 12, 2000

The proposal is for the construction and operation of a dual runway airport within the Kalbarri Airport Reserve, approximately 8 kilometres east of Kalbarri. The proposal also includes the decommissioning and rehabilitation of the present airport site south of Kalbarri. Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.