This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: December 17, 2008
The proposal is to develop a new iron ore mine approximately 60 kilometres west-north-west of Tom Price and 25 kilometres south-west of the existing Brockman 2 mine. The major components of the project include: Three new mine pits- with approximately 20% of the orebody occurring below the water table; Dry processing plant- including crushers, overland conveyor and screens; this will be located to the north of the pits running east/west to the rail loop; Associated mine infrastructure- this... Read more...Last updated: November 29, 2006
This proposal is for the Development of Industrial Land on the Burrup Peninsula. The proposed site is designated Industrial Lease Area A (Site A). Approval would allow Woodside Energy Ltd to undertake limited site preparation activities for the future installation of infrastructure, such as LNG and condensate storage tanks, which would be needed should the proposed Pluto LNG Development be allowed to proceed. Read more...Last updated: June 29, 2006
The proponent proposes to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are nine separate looping sections proposed from CS 1 south of Karratha, to CS 9, north of Gingin. Looping is a process of duplicating an existing pipeline between compressor stations for a certain distance. Once the specified distance is reached, it then ties back to the parallel pipeline. This design... Read more...Last updated: November 29, 2005
The proposal is to construct and operate a pipeline to supply gas to the Kemerton Power Station (located approximately 22km north east of Bunbury nearby the Kemerton Industrial Estate) and to construct a meter station at the power station site. The proposed pipeline would be 5km long and would connect to the DBNGP at MLV 154/155 and then run parallel to the existing DBNGP until it deviates west to supply the Kemerton Power Station. The proposed pipeline would be installed in the existing 16-... Read more...Last updated: July 8, 2005
The proposal is to construct a marina, resort and residential/ canal development as a land backed extension to the Exmouth Boat Harbour immediately south of the Exmouth township. Read more...Last updated: March 4, 2005
The proposal is to construct and operate the South West Metropolitan Railway from Perth to Mandurah. The proposal includes the establishment of rail infrastructure between Perth and Mandurah with the northern section of the line running from the Perth Central Business District to Anketell tunnel via the Kwinana Freeway. South of the Anketell tunnel, the proposed railway passes through the local government areas of the Town of Kwinana, the City of Rockingham and the City of Mandurah, and... Read more...Last updated: June 25, 2004
Proposal by the Water Corporation to construct a Water Treatment Plant in Mundaring and Water Storage Tanks in Sawyers Valley. Read more...Last updated: May 27, 2004
Inquiry under section 46 of the, Environmental Protection Act 1986, to the Telfer Project power suppy and infrastruction corridor.The recommended change to the environmental conditions of Ministerial Statement 605 will reduce the length of open trench permitted for the approved project from 60 km to 20 km and accordingly reduce the level of fauna mortality experienced during the construction of the pipeline. Read more...Last updated: May 26, 2003
The proposal involves the construction and operation of a 30 GL desalination plant at one of two locations in the Kwinana Industrial Area. The alternative sites are at the Kwinana Power Station (KPS) or on the corner of Patterson and Office Roads, East Rockingham. Read more...Last updated: December 20, 2002
Methanex proposes to develop a methanol complex on the Burrup Peninsula, approximately 1300 kilometres north of Perth. The selected project site is located in the King Bay – Hearson Cove Industrial Area, approximately 6 and 10 kilometres from the towns of Dampier and Karratha respectively. Approximately 84 hectares of the 100 hectare site will be cleared to accommodate the methanol complex. Read more...Last updated: December 20, 2002
The proposal is for construction and operation of a methanol plant of 1.05 million tonnes per annum (Mt/a) nominal capacity, at Withnell East industrial area on the Burrup Peninsula The proposal includes the installation of a gas supply pipeline, product pipeline, seawater supply pipeline and wastewater discharge pipeline to be situated in infrastructure corridors for which the Department of Mineral and Petroleum Resources (MPR) will be proponent. The plant footprint will occupy approximately... Read more...Last updated: December 18, 2002
This proposal relates to the establishment, by undertaking clearing and earthworks, of a section of the western portion of the Burrup East-West Corridor west of Burrup Road, for the installation of anticipated infrastructure services within it. Services to be potentially located in the proposed corridor include sealed conveyors, an inspection and maintenance track, pipelines, transmission lines and cables, and communications. Pipelines using this corridor are anticipated to carry liquid... Read more...Last updated: December 6, 2002
Proposal by Hope Downs Management Services Pty Ltd (hereafter referred to as HDMS) to construct a rail line and port facilities to support the development of an iron-ore mine, based on the Hope 1 Deposit. Read more...Last updated: September 13, 2002
The proposal being assessed is for the diversion of 8 gigalitres a year (on average) (GL/yr) of unallocated water resources in the Samson Catchment to be diverted for public water supply, the construction of a pipe head dam and related infrastructure. The Samson Brook Redevelopment Scheme is a key element of the Water Corporation’s drought recovery plan. Read more...Last updated: April 10, 2002
The proposal involves an expansion of the existing Dampier Public Wharf to provide improved facilities capable of servicing the future needs of industry in the area. The key components of the proposal are: construction of a 60-81 m long load-out facility south of the existing wharf; cut and fill operations to create a land backing to the facility (1.9 ha, of which 0.8 ha is reclaimed land); and quarrying of a 4.1 ha cargo lay-down and storage area. Read more...Last updated: June 22, 2001
Proposal by the Water Corporation to construct and operate a seawater supply and desalination system on the Burrup Peninsula. Read more...Last updated: October 17, 1999
Proposal to deviate the alignment of Kalamunda Road around the southern perimeter of the Guildford Cemetery. Read more...Last updated: June 4, 1999
The Western Australian Planning Commission proposes to rezone the majority of the Forrestfield Marshalling Yards to "Industrial" from the current Metropolitan Region Scheme reservation of "Railways" and to relocate the "Important Regional Road" (Dundas Road) to a site within the Forrestfield Marshalling Yards. Read more...Last updated: March 27, 1998
The proposal is for a 33 kilometre coastal road linking the town-sites of Cervantes and Jurien. Read more...